Kansas Department of Transportation "...to provide a statewide transportation system to meet the needs of Kansas."
    
 

KDOT SUMMARY OF QUANTITIES

                      KANSAS DEPARTMENT OF TRANSPORTATION          PAGE:   1                                                                                                                                                                                                                           
                           SUMMARY OF QUANTITIES               DATE: 04/23/14                                                                                                                                                                                                                               
                                                               TIME:  3:03 PM                                                                                                                                                                                                                               
LETTING DATE:       May 21, 2014                                                                                                                                                                                                                                                                            
                                                                                                                                                                                                                                                                                                            
            ************************************************************                                                                                                                                                                                                                                    
            *      PRIME CONTRACTORS SHALL NOTIFY KDOT OF THEIR        *                                                                                                                                                                                                                                    
            * INTENT TO BID BY IDENTIFYING THEMSELVES AS A BID HOLDER  *                                                                                                                                                                                                                                    
            ************************************************************                                                                                                                                                                                                                                    
                                                                                                                                                                                                                                                                                                            
QUANTITY    UNIT   ITEM DESCRIPTION                                                                                                                                                                                                                                                                         
----------------------------------------------------------------------------------------                                                                                                                                                                                                                    
                                                                                                                                                                                                                                                                                                            
                                                                                                                                                                                                                                                                                                            
            PROPOSAL NO: 514052121  STATE PROJECT NO: K010-023 KA 1826-01                                                                                                                                                                                                                                   
            WORKING DAYS: CCD  COMPLETION DATE: DECEMBER 18 2015 DBE GOAL: $900,000                                                                                                                                                                                                                         
            COUNTY: DOUGLAS                                                                                                                                                                                                                                                                                 
            GRADING, BRIDGES & SURFACING                                                                                                                                                                                                                                                                    
            K-10 (SOUTH LAWRENCE TRAFFICWAY)/BOB BILLINGS PKWY ON WEST S                                                                                                                                                                                                                                    
            IDE OF LAWRENCE                                                                                                                                                                                                                                                                                 
                                                                                                                                                                                                                                                                                                            
      1.00  LSUM   CONTRACTOR CONSTRUCTION STAKING                                                                                                                                                                                                                                                          
      1.00  EACH   FIELD OFFICE AND LABORATORY (TYPE A)                                                                                                                                                                                                                                                     
      1.00  LSUM   MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)                                                                                                                                                                                                                                    
      1.00  CUYD   FOUNDATION STABILIZATION (SET PRICE)                                                                                                                                                                                                                                                     
      1.00  LSUM   MOBILIZATION                                                                                                                                                                                                                                                                             
      1.00  LSUM   MOBILIZATION (DBE)                                                                                                                                                                                                                                                                       
      1.00  LSUM   REMOVAL OF EXISTING STRUCTURES                                                                                                                                                                                                                                                           
      1.00  CUYD   CONCRETE FOR SEAL COURSE (SET PRICE)                                                                                                                                                                                                                                                     
      1.00  LSUM   CURING ENVIRONMENT                                                                                                                                                                                                                                                                       
   3140.00  HOUR   TRAINEES HIGHWAY CONSTRUCTION (SET PRICE)                                                                                                                                                                                                                                                
      1.00  HOUR   FLAGGER (SET PRICE)                                                                                                                                                                                                                                                                      
    262.00  CUYD   GRANULAR BACKFILL                                                                                                                                                                                                                                                                        
    230.00  CUYD   GRANULAR BACKFILL (WINGWALLS)                                                                                                                                                                                                                                                            
      1.00  LSUM   CLEANING EXISTING STRUCTURE                                                                                                                                                                                                                                                              
      1.00  LSUM   CLEARING AND GRUBBING                                                                                                                                                                                                                                                                    
 117471.00  CUYD   COMMON EXCAVATION (RURAL LARGE)                                                                                                                                                                                                                                                          
 666627.00  CUYD   COMMON EXCAVATION (CONTRACTOR FURNISHED)                                                                                                                                                                                                                                                 
  60007.00  CUYD   ROCK EXCAVATION                                                                                                                                                                                                                                                                          
 649677.00  CUYD   COMPACTION OF EARTHWORK (TYPE   A) (MR-5-5)                                                                                                                                                                                                                                              
  28062.00  CUYD   COMPACTION OF EARTHWORK (TYPE  AA) (MR-5-5)                                                                                                                                                                                                                                              
 284776.00  SQYD   SALVAGED TOPSOIL                                                                                                                                                                                                                                                                         
      1.00  MGAL   WATER (GRADING) (SET PRICE)                                                                                                                                                                                                                                                              
    639.40  CUYD   CONCRETE (GRADE 4.0) (RCB)                                                                                                                                                                                                                                                               
    184.40  CUYD   CONCRETE (GRADE 4.0) (AE)                                                                                                                                                                                                                                                                
 118460.00  LBS.   REINFORCING STEEL (GRADE 60)                                                                                                                                                                                                                                                             
    179.00  CUYD   FOUNDATION STABILIZATION                                                                                                                                                                                                                                                                 
    574.00  CUYD   CLASS III EXCAVATION (MISC)                                                                                                                                                                                                                                                              
     72.00  LNFT   CROSS ROAD PIPE ( 18") (RCP)                                                                                                                                                                                                                                                             
     54.00  LNFT   CROSS ROAD PIPE ( 24")                                                                                                                                                                                                                                                                   
    104.00  LNFT   CROSS ROAD PIPE ( 30")                                                                                                                                                                                                                                                                   
    119.00  LNFT   CROSS ROAD PIPE ( 36")                                                                                                                                                                                                                                                                   
     34.00  LNFT   CROSS ROAD PIPE (11.0 SQ.FT.)                                                                                                                                                                                                                                                            
     52.00  LNFT   ENTRANCE PIPE ( 18")                                                                                                                                                                                                                                                                     
     31.00  LNFT   ENTRANCE PIPE ( 24")                                                                                                                                                                                                                                                                     

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 2 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 6.00 EACH END SECTION ( 18") 2.00 EACH END SECTION ( 18") (TYPE IV) 5.00 EACH END SECTION ( 24") 1.00 EACH END SECTION ( 30") 1.00 EACH END SECTION ( 36") 2.00 EACH END SECTION (11.0 SQ.FT.) 437.50 LNFT GUARDRAIL, STEEL PLATE 20.00 EACH INLET (CURB) 2.00 EACH INLET (TYPE 22 CURB) 4.00 EACH INLET (MANHOLE) (SPECIAL) 98.00 SQYD CONCRETE BACKSLOPE DITCH LINING 2317.00 SQYD CONCRETE DITCH LINING 310.00 LNFT STORM SEWER (15") (RCP) 6.00 LNFT STORM SEWER (15") 416.00 LNFT STORM SEWER (18") (RCP) 47.00 LNFT STORM SEWER (18") 334.00 LNFT STORM SEWER (24") (RCP) 86.00 LNFT STORM SEWER (24") 12.00 LNFT STORM SEWER (11.0 SQ.FT.) 5.00 EACH END SECTION ( 18") (RC) 2.00 EACH END SECTION ( 24") (RC) 7222.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 3043.00 SQYD SIDEWALK CONSTRUCTION ( 6") (AE) 228.00 SQYD SIDEWALK RAMP 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 286.00 LNFT 6" PIPE UNDERDRAINS (BFHL) 91.00 LNFT 6" PIPE UNDERDRAINS (AEGK) 69.00 EACH RIGHT-OF-WAY SURVEY MONUMENT 1.00 LSUM SANITARY SEWER SYSTEM 3.60 PMPS MOWING -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 6.00 EACH GUARDRAIL END TERMINAL (SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 6.00 EACH GUARDRAIL END TERMINAL (FLEAT) -------------------------------------------------------------------------------- 5265.00 LBS. TEMPORARY FERTILIZER (15-30-15) 702.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 1579.50 LBS. TEMPORARY SEED (GRAIN OATS) 1579.50 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 912.20 LBS. SOIL EROSION MIX 1.00 LNFT TEMPORARY BERM (SET PRICE) 1125.00 LNFT TEMPORARY SLOPE DRAIN 1.00 EACH TEMPORARY STREAM CROSSING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 3 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 7.00 EACH TEMPORARY INLET SEDIMENT BARRIER 1050.00 LNFT SILT FENCE 10913.00 LNFT BIODEGRADABLE LOG ( 9") 10913.00 LNFT BIODEGRADABLE LOG (12") 1050.00 LNFT BIODEGRADABLE LOG (20") 1207.00 CUYD TEMPORARY DITCH CHECK (ROCK) 280.00 LNFT FILTER SOCK ( 8") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 45.00 EACH SWPPP INSPECTION 75.00 EACH WATER POLLUTION CONTROL MANAGER 1117.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 37965.00 SQYD EROSION CONTROL (CLASS 2) (TYPE F) 16200.00 LBS. MULCHING (TACKING SLURRY) 70.20 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 729.00 CUYD CLASS III EXCAVATION 1208.00 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 633.00 CUYD CONCRETE (GRADE 4.0) (AE) 338130.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 109260.00 LBS. REINFORCING STEEL (GRADE 60) 905630.00 LBS. STRUCTURAL STEEL (M270) (GR 50WT3) 94727.00 LBS. STRUCTURAL STEEL (A709) (GR 50W) 3324.00 LBS. STRUCTURAL STEEL (A709) (GR 50) 652.00 LNFT FENCE (CHAIN LINK) ( 6'-0") (SPECIAL) 893.00 LNFT PILES (STEEL) (HP10X42) 232.00 LNFT PRE-DRILLED PILE HOLES 378.00 LNFT DRILLED SHAFT ( 66") (CASED) 80.00 LNFT CORE HOLE (INVESTIGATIVE) 1.00 EACH SONIC TEST (DRILLED SHAFT) (SET PRICE) 1.00 EACH OSTERBERG CELL LOAD TEST (DRILLED SHAFT) 45.00 EACH BEARING (STEEL REINFORCED ELASTOMERIC) 18000.00 EACH WELDED STUD SHEAR CONNECTORS 214.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 234.00 CUYD ABUTMENT AGGREGATE DRAIN 552.00 CUYD SLOPE PROTECTION (AGGREGATE) 3415.00 SQYD BRIDGE DECK GROOVING 1.00 LSUM FALSEWORK INSPECTION 150.00 CUYD CLASS I EXCAVATION 170.00 CUYD CLASS II EXCAVATION 241.50 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 55080.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 306.00 LNFT PILES (STEEL) (HP12X53) 67.00 LNFT TEST PILES (SPECIAL) (HP12X53) 112.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 76.00 SQYD ABUTMENT STRIP DRAIN 80.00 CUYD SLOPE PROTECTION (SHOT ROCK) 139.00 SQYD BRIDGE DECK GROOVING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 4 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 64.00 LNFT FENCE (CHAIN LINK) ( 6'-0") (SPECIAL) 6384.00 CUYD CLASS III EXCAVATION (RCB) 2488.80 CUYD CONCRETE (GRADE 4.0) (RCB BR) 325720.00 LBS. REINFORCING STEEL (GRADE 60) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 351.00 CUYD FOUNDATION STABILIZATION 208.00 CUYD GRANULAR BACKFILL (WINGWALLS) 1.00 LSUM TEMPORARY SHORING 3319.00 CUYD GEOFOAM 1994.00 SQYD GRANULAR DRAINAGE BLANKET (24") 1731.00 SQYD GEOMEMBRANE 57.00 LNFT FENCE (CHAIN LINK) ( 6'-0") (SPECIAL) 12543.00 LNFT CURB AND GUTTER, COMBINED (AE) 1006.00 SQYD CONCRETE PAVEMENT ( 4" UNIFORM) (AE) (PLAIN) 56.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 240.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (NRDJ) 336.00 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) (NRDJ) 360.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 771.00 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) 95.80 CUYD BRIDGE APPROACH SLAB FOOTING 338.00 LNFT CONCRETE SAFETY BARRIER (TYPE II) (SPECIAL) 3669.00 TON HMA SURFACE (SR- 9.5A) (PG 70-28) 628.00 TON HMA SURFACE (SR- 9.5A) (PG 58-28) (SHOULDER) 6149.00 TON HMA BASE (SR-19A) (PG 70-28) 18557.00 TON HMA BASE (SR-19A) (PG 64-22) 1898.00 TON HMA BASE (SR-19A) (PG 58-28) (SHOULDER) 5394.00 TON HMA-COMMERCIAL GRADE (CLASS A) 38.00 TON EMULSIFIED ASPHALT (SS-1HP) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 954.00 TON LIME 1.00 MGAL WATER (LIME TREATED SUBGRADE) (SET PRICE) 77111.00 SQYD MANIPULATION (LIME TREATED SUBGRADE) 30901.00 TON QUALITY CONTROL TESTING (HMA) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1150.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 2585.00 LNFT FENCE (WOVEN WIRE) (TYPE A OR B) 87.00 LNFT FENCE (CHAIN LINK) ( 6'-0") (SPECIAL) 350.00 LNFT FENCE (WOOD) 13.00 EACH POSTS (CORNER) (WOVEN WIRE TYPE A OR B) 8.00 EACH POSTS (END) (WOVEN WIRE TYPE A OR B) 2.00 EACH POSTS (PULL) (WOVEN WIRE TYPE A OR B) 558.02 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 1349.50 SQFT SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) 568.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 156.00 LNFT SIGN POST (4" X 6" WOOD) (REINFORCED PANEL SIGN)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 5 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 238.00 LNFT SIGN POST (2 LB/FT "U" STEEL) 338.00 LNFT SIGN POST (2-1/4" PERFORATED SQUARE STEEL TUBE) 65.00 LNFT SIGN POST (W 6 X 9 STEEL BEAM) 175.00 LNFT SIGN POST (W10X12 STEEL BEAM) 46.00 LNFT SIGN POST (W10X22 STEEL BEAM) 4.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W 6 X 9) 8.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X12) 2.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X22) 4.00 EACH SIGN POST BREAKAWAY BASE PLATE (W 6 X 9) 8.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X12) 2.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X22) 88.00 LNFT SIGN POST FOOTING (24" STEEL BEAM POST CONCRETE) 22.00 LNFT SIGN POST FOOTING (30" STEEL BEAM POST CONCRETE) 84.00 LNFT SIGN POST FOOTING (18" WOOD POST CONCRETE) 28.00 EACH SIGN POST FOOTING ( 2-1/4" PERFORATED SQUARE STEEL TUBE) 56.00 EACH SIGNING DELINEATOR (TYPE A) (WHITE RIGID "U" POST) 4.00 EACH SIGNING DELINEATOR (TYPE A) (YELLOW RIGID "U" POST) 46.00 EACH SIGNING DELINEATOR (TYPE B) (WHITE RIGID "U" POST) 1.00 EACH SIGNING DELINEATOR (TYPE A) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) 5.00 EACH SIGNING DELINEATOR (TYPE B) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) 1.00 EACH CANTILEVER SIGN STRUCTURE (20.1'-25.0') (STEEL) 1.00 EACH CANTILEVER SIGN STRUCTURE (25.1'-30.0') (STEEL) 27841.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 3353.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 762.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 8832.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 4716.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 196.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 469.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 14.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 12.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE)(WHITE)MERGE LEFT ARROW 6.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 6.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 1.00 LSUM ELECTRIC LIGHTING SYSTEM 2.00 EACH HIGH MAST LIGHT TOWER (100') (36" CONCRETE BASE) 47300.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 29150.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 46750.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 44000.00 EADA CHANNELIZER (FIXED) 68750.00 EADA CHANNELIZER (PORTABLE) 35750.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 2200.00 EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) 1100.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN 780.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 61160.00 LNFT PAVEMENT MARKING REMOVAL 2188.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 2225.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 6 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 4.00 EACH INERTIAL BARRIER SYSTEM 40.00 EACH REPLACEMENT MODULES 1.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) PROPOSAL NO: 514052141 STATE PROJECT NO: 023 U 0162-01 WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: $35,000 COUNTY: DOUGLAS GRADING & SURFACING CITY OF LAWRENCE: 9TH ST FROM EMERY TO MICHIGAN 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 108.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 41.00 SQYD SIDEWALK RAMP 1.00 LSUM CLEARING AND GRUBBING 19.00 CUYD COMMON EXCAVATION (URB) 14.30 CUYD CONCRETE (GRADE 3.0) (AE) 590.00 LBS. REINFORCING STEEL (GRADE 60) 1.00 MGAL WATER (GRADING) (SET PRICE) 6.00 EACH ADJUSTMENT OF MANHOLES 7.00 EACH ADJUSTMENT OF VALVE BOX (WATER) 1.00 EACH ADJUSTMENT OF VALVE BOX (GAS) 1.00 LSUM TRANSPORTING SALVAGEABLE MATERIAL 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) 40.00 LNFT FILTER SOCK ( 8") 1.00 EACH TEMPORARY INLET SEDIMENT BARRIER 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 6104.00 SQYD MILLING 664.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 31.75 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 45.00 LNFT SIGN POST (1-3/4" PERFORATED SQUARE STEEL TUBE) 4.00 EACH SIGN POST FOOTING ( 1-3/4" PERFORATED SQUARE STEEL TUBE) 1.00 LSUM SIGN (REMOVE AND RESET) 56.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 120.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (36") 4.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 3.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 8.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 7.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 3442.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (YELLOW) ( 4")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 7 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 2494.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (WHITE) ( 6") 74.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (YELLOW) (12") 1.00 LSUM TRAFFIC SIGNAL 1.00 LSUM EMERGENCY VEHICLE SYSTEM 1.00 LSUM VIDEO DETECTION SYSTEM 1.00 LSUM SEEDING PROPOSAL NO: 514052636 STATE PROJECT NO: K025-047 KA 2065-01 WORKING DAYS: 80 COMPLETION DATE: DBE GOAL: $30,000 COUNTY: KEARNY GRADING, BRIDGE & SURFACING BR. NO. #012, 8.79 MI N OF K-25/US-50 JCT. 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEANING EXISTING STRUCTURE 1.00 LSUM CLEARING AND GRUBBING 13437.00 CUYD COMMON EXCAVATION (RURAL SMALL) 4073.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 176.00 CUYD ROCK EXCAVATION 14539.00 SQYD SALVAGED TOPSOIL 1.00 MGAL WATER (GRADING) (SET PRICE) 9617.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 600.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 190.00 LNFT CROSS ROAD PIPE ( 60") (CSP) 250.00 LNFT GUARDRAIL, STEEL PLATE (MGS) 504.00 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE 1.00 EACH MAILBOX INSTALLATION (SET PRICE) 8.00 EACH RIGHT-OF-WAY SURVEY MONUMENT 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 4.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 4.00 EACH GUARDRAIL END TERMINAL (MGS-SRT) --------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 8 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 221.00 LBS. TEMPORARY FERTILIZER (15-30-15) 68.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 153.00 LBS. TEMPORARY SEED (GRAIN OATS) 153.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 156.20 LBS. SOIL EROSION MIX 1.00 LNFT TEMPORARY BERM (SET PRICE) 238.00 LNFT SILT FENCE 119.00 LNFT BIODEGRADABLE LOG ( 9") 119.00 LNFT BIODEGRADABLE LOG (12") 238.00 LNFT BIODEGRADABLE LOG (20") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 1.00 EACH SWPPP INSPECTION 1.00 EACH WATER POLLUTION CONTROL MANAGER 14036.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 1452.00 SQYD EROSION CONTROL (CLASS 2) (TYPE F) 3060.00 LBS. MULCHING (TACKING SLURRY) 6.80 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 314.00 CUYD CLASS III EXCAVATION (RCB) 216.90 CUYD CONCRETE (GRADE 4.0) (RCB BR) 121.10 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR) 60860.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 9620.00 LBS. REINFORCING STEEL (GRADE 60) 67.00 CUYD FOUNDATION STABILIZATION 269.00 CUYD GRANULAR BACKFILL (WINGWALLS) 272.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 1354.00 TON HMA-COMMERCIAL GRADE (CLASS A) 256.00 SQYD AGGREGATE BASE (AB-3) (12") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 826.00 TON MILLING 826.00 TON TRANSPORTING SALVAGEABLE MATERIAL (8+MI) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 170.00 LBS. FERTILIZER (15-30-15) 6.60 LBS. SEED (BIG BLUESTEM GRASS) (KAW) 0.10 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 2.50 LBS. SEED (BUFFALO GRASS) (TREATED) 6.60 LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS) 16.80 LBS. TEMPORARY SEED (SAND BLUESTEM) (GARDEN) 3.40 LBS. SEED (SAND DROPSEED) 21.40 LBS. SEED (SIDE OATS GRAMA) (EL RENO) 34.00 LBS. SEED (STERILE WHEATGRASS) 3.30 LBS. SEED (SWITCHGRASS) (BLACKWELL) 13.80 LBS. SEED (WESTERN WHEATGRASS) (BARTON) 21.80 LBS. SEED (NATIVE WILDFLOWER MIX 3) 1.00 TON MULCHING (PERMANENT) (SET PRICE) 2400.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 2640.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 9 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1200.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 8400.00 EADA CHANNELIZER (FIXED) 2160.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 127.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 28.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 9650.00 LNFT PAVEMENT MARKING REMOVAL 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) PROPOSAL NO: 514054121 STATE PROJECT NO: 105 N 0555-01 WORKING DAYS: CCD COMPLETION DATE: DECEMBER 19 2015 DBE GOAL: $500,000 COUNTY: WYANDOTTE GRADING, BRIDGE & SURFACING WYANDOTTE CO: MERRIAM LANE FROM 24TH ST TO 10TH ST. ************************************************************ * NOTE: THERE IS A PRE-BID CONFERENCE ON THIS PROJECT. * * ATTENDANCE IS REQUIRED TO BE ELIGIBLE TO BID. * ************************************************************ 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 HOUR FLAGGER (SET PRICE) 3200.00 HOUR TRAINEES HIGHWAY CONSTRUCTION (SET PRICE) 108.00 CUYD FOUNDATION STABILIZATION 1.00 LSUM CLEARING AND GRUBBING 7664.00 CUYD COMMON EXCAVATION (URB) 8327.00 CUYD ROCK EXCAVATION 6889.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 176.00 LNFT REINFORCED CONCRETE BOX ( 5' X 3') (PRECAST) 5.00 LNFT REINFORCED CONCRETE BOX (8' X 12') (PRECAST) 72.00 LNFT REINFORCED CONCRETE BOX ( 7' X 7') (PRECAST) 252.00 LNFT REINFORCED CONCRETE BOX ( 7' X 6') (PRECAST) 64.00 LNFT REINFORCED CONCRETE BOX (10' X 5') (PRECAST) 35.80 CUYD CONCRETE (GRADE 4.0) (AE) 2820.00 LBS. REINFORCING STEEL (GRADE 60) 40.00 LNFT ENTRANCE PIPE ( 30") (RCP) 2.00 EACH END SECTION ( 15") (RC) 3.00 EACH END SECTION ( 30") (RC) 1.00 EACH END SECTION ( 36") (CS) 1.00 EACH END SECTION ( 42") (RC)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 10 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 EACH END SECTION ( 66") (RC) 254.00 SQYD RIPRAP (LIGHT STONE) 43.00 SQYD CONCRETE DITCH LINING 354.00 SQYD GEOTEXTILE FABRIC 15.00 EACH ADJUSTMENT OF MANHOLES 29.00 EACH ADJUSTMENT OF METER BOX (WATER) 34.00 EACH ADJUSTMENT OF VALVE BOX (WATER) 73.00 EACH INLET (CURB) (SETBACK) 13.00 EACH INLET (CURB) (STANDARD) 11.00 EACH INLET (AREA) 2.00 EACH INLET (AREA) (SPECIAL) 2.00 EACH INLET (GRATE) 2.00 EACH INLET (CURB) (SPECIAL) 2.00 EACH JUNCTION BOX 2.00 EACH INLET (MANHOLE) (SPECIAL) 13.00 EACH MANHOLE (REINFORCED CONCRETE) 106.00 TON AGGREGATE DITCH LINING ( 6") 3.00 EACH FLUME INLET (CONCRETE) 2319.00 LNFT STORM SEWER (15") (RCP) 1892.00 LNFT STORM SEWER (18") (RCP) 1760.00 LNFT STORM SEWER (24") (RCP) 1527.00 LNFT STORM SEWER (30") (RCP) 805.00 LNFT STORM SEWER (36") (RCP) 101.00 LNFT STORM SEWER (42") (RCP) 933.00 LNFT STORM SEWER (66") (RCP) 133.00 LNFT STORM SEWER (36") (CSP) 6176.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 625.00 SQYD SIDEWALK RAMP 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 1.00 TON TEMPORARY SURFACING MATERIAL (HMA) (SET PRICE) 159.00 LNFT 4" PIPE UNDERDRAINS (L) 150.00 LNFT 6" PIPE UNDERDRAINS (H) 20.00 LNFT 6" PIPE UNDERDRAINS (K) 1.00 EACH MAILBOX INSTALLATION (SET PRICE) 118.00 CUYD FLOWABLE FILL (LOW STRENGTH) 2357.00 CUYD TOPSOIL 1.00 LSUM ROADSIDE IMPROVEMENT 125.00 LNFT HANDRAIL (METAL) (3'- 6") 1147.00 SQFT RETAINING WALL (MBW) 762.00 LBS. TEMPORARY FERTILIZER (15-30-15) 101.60 LBS. TEMPORARY SEED (CANADA WILDRYE) 228.60 LBS. TEMPORARY SEED (GRAIN OATS) 228.60 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 1.00 LNFT TEMPORARY BERM (SET PRICE) 6209.00 LNFT SILT FENCE 555.00 LNFT BIODEGRADABLE LOG ( 9") 30.00 LNFT BIODEGRADABLE LOG (20") 1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 11 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM SWPPP DESIGN 35.00 EACH SWPPP INSPECTION 60.00 EACH WATER POLLUTION CONTROL MANAGER 2369.00 SQYD EROSION CONTROL (CLASS 2) (TYPE F) 4572.00 LBS. MULCHING (TACKING SLURRY) 10.16 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 1280.00 CUYD CLASS III EXCAVATION (RCB) 128.80 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR) 22.00 CUYD FOUNDATION STABILIZATION 1054.00 CUYD GRANULAR BACKFILL 14880.00 LBS. REINFORCING STEEL (GRADE 60) 96.00 LNFT REINFORCED CONCRETE BOX (8' X 10') (PRECAST) 1620.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 27635.00 SQYD CONCRETE PAVEMENT ( 7" UNIFORM) (AE) (NRDJ) 3985.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (NRDJ) 6463.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (PLAIN) 1002.00 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) (AE) (NRDJ) 18898.00 SQYD AGGREGATE BASE (AB-3) ( 4") 20232.00 LNFT CURB AND GUTTER, COMBINED (AE) 65.00 LNFT CURB, EDGE ( 6.0") (AE) 9280.00 TON HMA-COMMERCIAL GRADE (CLASS A) 5623.00 TON MILLING 812.00 SQYD HIGH FRICTION SURFACE 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 670.00 SQYD PCCP PATCHING (FULL DEPTH) ( 6") (SOUND) 1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE) 700.60 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 83.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 954.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 6.00 LNFT SIGN POST FOOTING (18" WOOD POST CONCRETE) 88.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 1314.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 4") 15273.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 61.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 15738.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 231.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 389.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 632.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 335.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 7.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) THRU-RT ARROW 10.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 59.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (BICYCLE) 5.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (HANDICAP) 1.00 LSUM ELECTRIC LIGHTING SYSTEM 1.00 LSUM TRAFFIC SIGNAL 1.00 LSUM VIDEO DETECTION SYSTEM 24857.00 SQYD SOD (FESCUE) (STRIPS)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 12 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1016.00 LBS. FERTILIZER (15-30-15) 406.40 LBS. FERTILIZER (13-13-13) 62800.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 19600.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 24000.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 60000.00 EADA CHANNELIZER (PORTABLE) 40000.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 2000.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN 140.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 2.00 STAL PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE I TAPE OR 10.00 STAL PAVEMENT MARKING (TEMP) (SOLID) (LINE MASKING TAPE) 4.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 6.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) PROPOSAL NO: 514054525 STATE PROJECT NO: 087 C 0417-01 WORKING DAYS: 100 COMPLETION DATE: DBE GOAL: $45,000 COUNTY: SEDGWICK GRADING, BRIDGE & SURFACING 87TH ST S 2.7 MI W AND 2.0 MI S OF HAYSVILLE OVER DRY CRK 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM CURING ENVIRONMENT 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM CLEARING AND GRUBBING 1000.00 CUYD COMMON EXCAVATION (RURAL SMALL) 1704.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 2298.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 866.00 TON SURFACING MATERIAL (AB-3) 1.00 MGAL WATER (GRADING) (SET PRICE) 100.00 LNFT GUARDRAIL, STEEL PLATE 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 30.00 LNFT ENTRANCE PIPE ( 18") 30.00 LNFT ENTRANCE PIPE ( 24") 2.00 EACH END SECTION ( 18") 2.00 EACH END SECTION ( 24") 1.00 EACH MAILBOX INSTALLATION (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 13 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 4.00 EACH GUARDRAIL END TERMINAL (SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 4.00 EACH GUARDRAIL END TERMINAL (FLEAT) -------------------------------------------------------------------------------- 1.00 LSUM TEMPORARY SEEDING 1.00 LNFT TEMPORARY BERM (SET PRICE) 1.00 EACH TEMPORARY STREAM CROSSING 540.00 LNFT SILT FENCE 56.00 CUYD TEMPORARY DITCH CHECK (ROCK) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 110.00 CUYD CLASS I EXCAVATION 80.00 CUYD CLASS II EXCAVATION 49.40 CUYD CONCRETE (GRADE 4.0) (AE) 264.80 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 2060.00 LBS. REINFORCING STEEL (GRADE 60) 69660.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 2100.00 LNFT PILES (STEEL) (HP12X53) 28.00 EACH CAST STEEL PILE POINTS 34.00 SQYD ABUTMENT STRIP DRAIN 38.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 703.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 222.00 SQYD GEOTEXTILE FABRIC 1.00 LSUM SEEDING PROPOSAL NO: 514056101 STATE PROJECT NO: 106 KA 3655-14 WORKING DAYS: 60 COMPLETION DATE: DBE GOAL: COUNTY: C106 DONIPHAN JEFFERSON SIDEWALK IMPROVEMENTS VARIOUS LOCATIONS IN DISTRICT ONE 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 684.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 382.00 SQYD SIDEWALK RAMP 664.00 LNFT CURB AND GUTTER, COMBINED (AE) 3.00 SQYD CONCRETE PAVEMENT ( 6" VARIABLE) (AE) (PLAIN) 36.00 SQYD SIDEWALK RAMP (DETECTABLE WARNING) 241.00 LNFT HANDRAIL (METAL-GALVANIZED)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 14 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 41.00 LNFT STORM SEWER (12") (CSP) 8.00 EACH END SECTION ( 12") (CS) 13.00 LNFT STORM SEWER (15") (CSP) 2.00 EACH END SECTION ( 15") (CS) 1.00 EACH ADJUSTMENT OF MANHOLES 1.00 LSUM SIGN (REMOVE AND RESET) 80.00 LNFT FILTER SOCK ( 8") 24.00 LNFT FILTER SOCK (18") 1.00 LSUM SEEDING PROPOSAL NO: 514056121 STATE PROJECT NO: K192-106 KA 3677-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: JEFFERSON LEAVENWORTH C106 ASPHALT CRACK REPAIR K-192:KA 3678 US-59 JCT E TO LV CO L, 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 26460.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 42168.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") PROPOSAL NO: 514056131 STATE PROJECT NO: I035-046 KA 3649-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: JOHNSON PCCP PAVEMENT PATCHING I-35:NB EXIT AT JOHNSON DRIVE 1.00 LSUM MOBILIZATION 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 HOUR FLAGGER (SET PRICE) 1.00 LNFT LOOP DETECTOR REPLACEMENT (SET PRICE) 347.00 SQYD PCCP PATCHING (FULL DEPTH) (10") (SOUND) 79.00 SQYD PCCP EDGE JOINT PATCHING (FULL DEPTH) 43.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH) 1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE) 900.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 36.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 4.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 3.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 648.00 LNFT PAVEMENT MARKING REMOVAL 240.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 15.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 80.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 255.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 1225.00 EADA CHANNELIZER (PORTABLE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 15 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 15.00 EADA ARROW DISPLAY 90.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN 65.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) PROPOSAL NO: 514056141 STATE PROJECT NO: K192-052 KA 3187-01 WORKING DAYS: CCD COMPLETION DATE: DECEMBER 19 2014 DBE GOAL: COUNTY: LEAVENWORTH BRIDGE REPAIR AND OVERLAY K-192: BR.NOS.(057),(059)&(060)3.0, 4.52 & 4.61 MI E OF JF C O L OVER DAWSON CREEK, STRANGER CREEK OVERFLOW & STRANGER CR 1.00 LSUM MOBILIZATION 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 296.00 CUYD COMMON EXCAVATION (RURAL SMALL) 1.00 MGAL WATER (GRADING) (SET PRICE) 76.00 CUYD ROCK EXCAVATION 450.00 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE 462.00 LNFT GUARDRAIL, STEEL PLATE 1.00 EACH MAILBOX INSTALLATION (SET PRICE) 2.00 CUYD SLOPE PROTECTION (SHOT ROCK) 48.00 CUYD CLASS III EXCAVATION 56.20 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 14640.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE) 112.00 EACH DRILLING AND GROUTING 24.00 SQYD ABUTMENT STRIP DRAIN 34.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 1.00 LSUM TEMPORARY SHORING 110.00 SQFT CONCRETE SURFACE REPAIR 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 516.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 2.00 CUYD SLOPE PROTECTION (SHOT ROCK) 37.00 CUYD CLASS III EXCAVATION 41.90 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 11230.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 276.00 EACH DRILLING AND GROUTING 20.00 SQYD ABUTMENT STRIP DRAIN 28.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 1.00 LSUM TEMPORARY SHORING 118.00 EACH EMBEDDED GALVANIC ANODE 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 500.00 SQYD MACHINE PREPARATION (2.50")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 16 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 556.00 SQYD PORTLAND CEMENT CONCRETE OVERLAY (2.5") 1.00 CUYD MATERIAL FOR PORTLAND CEMENT CONCRETE OVERLAY (SET PRICE) 490.00 SQYD BRIDGE DECK GROOVING 2.00 CUYD SLOPE PROTECTION (SHOT ROCK) 68.00 CUYD CLASS III EXCAVATION 91.10 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 24290.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 300.00 EACH DRILLING AND GROUTING 34.00 SQYD ABUTMENT STRIP DRAIN 42.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 1.00 LSUM TEMPORARY SHORING 180.00 SQFT CONCRETE SURFACE REPAIR 310.00 EACH EMBEDDED GALVANIC ANODE 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 1204.00 SQYD MACHINE PREPARATION (2.50") 1349.00 SQYD PORTLAND CEMENT CONCRETE OVERLAY (2.5") 1.00 CUYD MATERIAL FOR PORTLAND CEMENT CONCRETE OVERLAY (SET PRICE) 1154.00 SQYD BRIDGE DECK GROOVING 313.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 94.80 CUYD BRIDGE APPROACH SLAB FOOTING 853.00 SQYD MILLING 481.00 TON HMA-COMMERCIAL GRADE (CLASS A) 31.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 6120.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 6480.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 2700.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 13140.00 EADA CHANNELIZER (FIXED) 18360.00 EADA CHANNELIZER (PORTABLE) 3240.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 185.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 2400.00 LNFT PAVEMENT MARKING REMOVAL 1575.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 1513.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 4.00 EACH INERTIAL BARRIER SYSTEM 14.00 EACH REPLACEMENT MODULES 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 4.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 17 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514056151 STATE PROJECT NO: I070-089 KA 3651-01 WORKING DAYS: 60 COMPLETION DATE: DBE GOAL: COUNTY: SHAWNEE PCCP PAVEMENT RECONSTRUCTION I-70: APPROX 2 MI W OF K-4 JCT NEAR BR.NO.(224) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MOBILIZATION 374.00 CUYD ROCK EXCAVATION 391.00 CUYD COMMON EXCAVATION (BASE) 260.00 LNFT GUARDRAIL, REMOVAL AND RECONSTRUCTION OF STEEL PLATE 1184.00 SQYD CEMENT TREATED BASE 1200.00 SQYD GRANULAR BASE ( 8") 1.00 MGAL WATER (GRANULAR BASE) (SET PRICE) 1200.00 SQYD GEOTEXTILE FABRIC 1200.00 SQYD GEOSYNTHETIC REINFORCEMENT (FOR BASE) 722.00 SQYD CONCRETE PAVEMENT (11.5" UNIFORM) (AE) (NRDJ) 462.00 SQYD CONCRETE PAVEMENT (11.5" UNIFORM) (AE) (PLAIN) 82.00 LNFT EDGE DRAIN PIPE 2.00 EACH EDGE DRAIN OUTLETS 390.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 1260.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 600.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 360.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 6000.00 EADA CHANNELIZER (PORTABLE) 480.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 120.00 EADA ARROW DISPLAY 210.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 158.00 STAL PAVEMENT MARKING (TEMP) (BROKEN) (LINE MASKING TAPE) 60.00 STAL PAVEMENT MARKING (TEMP) (BROKEN) (LINE MASKING TAPE) 800.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 800.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 2.00 EACH INERTIAL BARRIER SYSTEM 16.00 EACH REPLACEMENT MODULES 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 18 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514056161 STATE PROJECT NO: U075-089 KA 3654-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: SHAWNEE SIGNING TRUSS REPAIR ON US-75 IN SH CO 1.00 LSUM MOBILIZATION 1.00 EACH SIGN STRUCTURE MODIFICATION PROPOSAL NO: 514056171 STATE PROJECT NO: I435-105 KA 3583-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: WYANDOTTE SIGNING I-435: INTERCHANGES AT PARALLEL PARKWAY AND K5/LEAVENWORTH R D. 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 HOUR FLAGGER (SET PRICE) 373.25 SQFT SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) 1.00 EACH OVERHEAD SIGN STRUCTURE ( 60.1'- 70.0') (ALUMINUM) 1.00 EACH CANTILEVER SIGN STRUCTURE (30.1'-35.0') (STEEL) 140.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 400.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 110.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 50.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 2250.00 EADA CHANNELIZER (PORTABLE) 320.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 50.00 EADA ARROW DISPLAY 20.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) PROPOSAL NO: 514056181 STATE PROJECT NO: I035-105 KA 3587-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: WYANDOTTE SIGNING SIGN AND FOOTING REPLACEMENTS ON I-35 IN WY CO 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 HOUR FLAGGER (SET PRICE) 482.50 SQFT SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) 2.00 EACH CANTILEVER SIGN STRUCTURE (30.1'-35.0') (STEEL) 70.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 19 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 400.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 450.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 1800.00 EADA CHANNELIZER (PORTABLE) 180.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 50.00 EADA ARROW DISPLAY 90.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) PROPOSAL NO: 514056191 STATE PROJECT NO: K005-105 KA 3675-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: WYANDOTTE PAVEMENT PATCHING K-5: I-635 JCT E & N TO SUNSHINE RD 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 730.00 TON HMA-COMMERCIAL GRADE (CLASS A) (PATCHING) 15672.00 LNFT SAW AND SEAL JOINT (HMA) 3640.00 TON HMA-COMMERCIAL GRADE (CLASS A) 600.00 SQYD MILLING 22310.00 SQYD INTERLAYER PAVEMENT REINFORCEMENT 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 4232.00 SQYD PCCP PATCHING (FULL DEPTH) (11") (SOUND) 1969.00 TON MILLING 220.00 SQYD PCCP PATCHING (FULL DEPTH) ( 8.5") (SOUND) 140.00 LNFT EXPANSION JOINT (PREFORMED ELASTOMERIC COMPRESSION) 9000.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 8700.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 86.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 150.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 1162.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 150.00 EADA CHANNELIZER (PORTABLE) 7500.00 EADA CHANNELIZER (PORTABLE) 225.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 75.00 EADA ARROW DISPLAY 408.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) PROPOSAL NO: 514056212 STATE PROJECT NO: I070-021 KA 3662-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: DICKINSON HMA OVERLAY I-70: MM 284.26-284.36 (BR.NO.(097)) 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 530.00 TON HMA-COMMERCIAL GRADE (CLASS A)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 20 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 30.00 EADA ARROW DISPLAY 10.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) PROPOSAL NO: 514056232 STATE PROJECT NO: 106 KA 3656-14 WORKING DAYS: 20 COMPLETION DATE: DBE GOAL: COUNTY: C106 LINCOLN MITCHELL SIDEWALK IMPROVEMENTS VARIOUS LOCATIONS IN DISTRICT TWO 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 101.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 125.00 SQYD SIDEWALK RAMP 342.00 LNFT CURB AND GUTTER, COMBINED (AE) 10.00 SQYD SIDEWALK RAMP (DETECTABLE WARNING) 24.00 LNFT FILTER SOCK ( 8") 1.00 LSUM SEEDING PROPOSAL NO: 514056363 STATE PROJECT NO: 106 KA 3657-14 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: C106 RAWLINS ROOKS SIDEWALK IMPROVEMENTS VARIOUS LOCATIONS IN DISTRICT THREE 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 34.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 37.00 SQYD SIDEWALK RAMP 113.00 LNFT CURB AND GUTTER, COMBINED (AE) 1.00 LSUM SEEDING PROPOSAL NO: 514056454 STATE PROJECT NO: 106 KA 3658-14 WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: COUNTY: C106 ELK LABETTE SIDEWALK IMPROVEMENTS VARIOUS LOCATIONS IN DISTRICT FOUR 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 482.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 253.00 SQYD SIDEWALK RAMP 276.00 LNFT CURB AND GUTTER, COMBINED (AE) 14.00 SQYD SIDEWALK RAMP (DETECTABLE WARNING)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 21 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 40.00 LNFT HANDRAIL (METAL-GALVANIZED) 85.00 LNFT STORM SEWER (15") (CSP) 17.00 EACH END SECTION ( 15") (CS) 48.00 LNFT FILTER SOCK ( 8") 1.00 LSUM SEEDING PROPOSAL NO: 514056464 STATE PROJECT NO: U169-061 KA 3650-01 WORKING DAYS: 60 COMPLETION DATE: DBE GOAL: COUNTY: MIAMI SLIDE REPAIR US-169: AT 363RD STREET 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 13725.00 CUYD COMMON EXCAVATION (RURAL SMALL) 14205.00 CUYD ROCK EMBANKMENT (SPECIAL) 1.00 LNFT TEMPORARY BERM (SET PRICE) 600.00 LNFT SILT FENCE 28.00 CUYD TEMPORARY DITCH CHECK (ROCK) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM TEMPORARY SEEDING 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 1890.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 3330.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 180.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 10890.00 EADA CHANNELIZER (PORTABLE) 630.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 73.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 26.00 STAL PAVEMENT MARKING (TEMP) (SOLID) (LINE MASKING TAPE) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) PROPOSAL NO: 514056505 STATE PROJECT NO: 106 KA 3659-14 WORKING DAYS: 40 COMPLETION DATE: DBE GOAL: COUNTY: C106 HARPER PAWNEE SIDEWALK IMPROVEMENTS VARIOUS LOCATIONS IN DISTRICT FIVE 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 166.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 215.00 SQYD SIDEWALK RAMP 654.00 LNFT CURB AND GUTTER, COMBINED (AE) 1.00 LSUM SIGN (REMOVE AND RESET) 40.00 LNFT FILTER SOCK ( 8") 1.00 LSUM SEEDING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 22 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514056515 STATE PROJECT NO: U054-008 KA 2212-01 WORKING DAYS: 140 COMPLETION DATE: DBE GOAL: COUNTY: BUTLER GRADING & SURFACING US-54: E CL OF ANDOVER E TO W CL OF AUGUSTA 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 CUYD GRANULAR BACKFILL (WINGWALLS) (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEANING EXISTING STRUCTURE 1.00 LSUM CLEARING AND GRUBBING 5742.00 CUYD COMMON EXCAVATION (RURAL SMALL) 22427.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 267.00 CUYD ROCK EXCAVATION 21691.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 195246.00 SQYD SALVAGED TOPSOIL 3.30 CUYD FLOWABLE FILL (LOW STRENGTH) 5375.00 LNFT GUARDRAIL, STEEL PLATE (MGS) 676.00 LNFT GUARDRAIL, STEEL PLATE 95.00 SQYD CONCRETE DITCH LINING 155.00 TON AGGREGATE DITCH LINING ( 6") 15.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 1.00 EACH MAILBOX INSTALLATION (SET PRICE) 15.30 PMPS MOWING 16.40 CUYD CONCRETE (GRADE 4.0) (RCB) 1180.00 LBS. REINFORCING STEEL (GRADE 60) 192.00 EACH DRILLING AND GROUTING 147.00 LBS. STRUCTURAL STEEL 944.00 LBS. STRUCTURAL STEEL (A53) 180.00 LNFT SLOTTED DRAIN (15") 16.40 CUYD CONCRETE (GRADE 4.0) (RCB) 1180.00 LBS. REINFORCING STEEL (GRADE 60) 192.00 EACH DRILLING AND GROUTING 14.00 LNFT CROSS ROAD PIPE ( 12") (RCP) 12.00 LNFT CROSS ROAD PIPE ( 15") (RCP) 38.00 LNFT CROSS ROAD PIPE ( 15") 12.00 LNFT CROSS ROAD PIPE ( 24") (RCP)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 23 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 25.00 LNFT CROSS ROAD PIPE ( 24") 6.00 LNFT CROSS ROAD PIPE ( 30") (RCP) 3.00 EACH END SECTION ( 12") (RC) 3.00 EACH END SECTION ( 15") 2.00 EACH END SECTION ( 18") 9.00 EACH END SECTION ( 24") (RC) 61.00 EACH END SECTION ( 24") 2.00 EACH END SECTION ( 30") 1.00 EACH END SECTION ( 30") (RC) 3.00 EACH END SECTION ( 30") (TYPE IV) 1.00 EACH END SECTION ( 4.5 SQ.FT.) (CSMA) 33.00 LNFT ENTRANCE PIPE ( 24") (RCP) 788.00 LNFT ENTRANCE PIPE ( 24") 51.00 LNFT ENTRANCE PIPE ( 30") 38.00 LNFT ENTRANCE PIPE ( 18") 3.00 LNFT ENTRANCE PIPE ( 4.5 SQ. FT.) (CSMAC) 15.00 EACH INLET (MANHOLE) (SPECIAL) 1.00 EACH MANHOLE (REINFORCED CONCRETE) 5.00 EACH INLET (TYPE I DITCH) 1.00 EACH INLET (TYPE II DITCH) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 11.00 EACH GUARDRAIL END TERMINAL (MGS-SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 11.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 3.00 EACH GUARDRAIL END TERMINAL (MGS-ET-PLUS) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 3.00 EACH GUARDRAIL END TERMINAL (MGS-SKT) -------------------------------------------------------------------------------- 6045.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 806.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 1813.50 LBS. TEMPORARY SEED (GRAIN OATS) 1813.50 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 109.90 LBS. SOIL EROSION MIX 1.00 LNFT TEMPORARY BERM (SET PRICE) 58.00 EACH TEMPORARY INLET SEDIMENT BARRIER 520.00 LNFT SILT FENCE 2199.00 LNFT BIODEGRADABLE LOG ( 9") 2199.00 LNFT BIODEGRADABLE LOG (12")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 24 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 520.00 LNFT BIODEGRADABLE LOG (20") 469.00 CUYD TEMPORARY DITCH CHECK (ROCK) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 LSUM SWPPP DESIGN 30.00 EACH SWPPP INSPECTION 50.00 EACH WATER POLLUTION CONTROL MANAGER 4882.00 SQYD EROSION CONTROL (CLASS 1) (TYPE C) 18000.00 LBS. MULCHING (TACKING SLURRY) 80.60 TON MULCHING (TEMPORARY) 1.00 MGAL WATER (EROSION CONTROL) (SET PRICE) 1.10 CUYD CONCRETE (GRADE 4.0) (AE) 470.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 10.00 EACH DRILLING AND GROUTING 1.10 CUYD CONCRETE (GRADE 4.0) (AE) 470.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 10.00 EACH DRILLING AND GROUTING 69066.00 TON HMA OVERLAY (SR-12.5A) (PG 70-28) 41051.00 TON HMA OVERLAY (SR-12.5A) (PG 58-28) (SHOULDER) 1545.00 TON HMA-COMMERCIAL GRADE (CLASS A) 20237.00 TON MILLING 110117.00 TON QUALITY CONTROL TESTING (HMA) 90.00 TON EMULSIFIED ASPHALT (SS-1HP) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT PAVEMENT SMOOTHNESS 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1830.00 SQYD PCCP PATCHING (FULL DEPTH) (14") (UNSOUND) 1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE) 245.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 1.00 LSUM SIGN (REMOVE AND RESET) 123832.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 82280.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 66.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 218.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 3570.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 12390.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 1260.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 10500.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 71400.00 EADA CHANNELIZER (PORTABLE) 16800.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 210.00 EADA ARROW DISPLAY 4100.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 83750.00 LNFT PAVEMENT MARKING REMOVAL 540.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 2.00 EACH INERTIAL BARRIER SYSTEM 20.00 EACH REPLACEMENT MODULES 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 25 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 2.00 EACH TWORKS SIGN ASSEMBLY (LARGE) PROPOSAL NO: 514056525 STATE PROJECT NO: K177-008 KA 3648-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: BUTLER ASPHALT CRACK REPAIR K-177: US-54 JCT N TO CS CO L 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 147470.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") PROPOSAL NO: 514056535 STATE PROJECT NO: U160-018 KA 3777-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: COWLEY ASPHALT CRACK REPAIR US-160: K-15 JCT N TO BURDEN WCL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 40125.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") PROPOSAL NO: 514056545 STATE PROJECT NO: 106 KA 3778-01 WORKING DAYS: 20 COMPLETION DATE: DBE GOAL: COUNTY: C106 COWLEY SUMNER ASPHALT CRACK REPAIR K-53: KA 3781 US-81 JCT E TO MULVANE WCL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 46325.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 51988.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 32588.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") PROPOSAL NO: 514056565 STATE PROJECT NO: U056-106 KA 3727-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: C106 EDWARDS PAWNEE CHIP SEAL US-56: KA 3728 KINGSLEY ECL NE TO PN CO L, 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 969.00 CUYD COVER MATERIAL (CM-L-2)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 26 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 348.30 STA. MANIPULATION (CHIP SEAL) 348.30 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 197.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 153.00 TON ASPHALT CEMENT (AC-20-5TR) -------------------------------------------------------------------------------- 2556.00 CUYD COVER MATERIAL (CM-L-2) 892.50 STA. MANIPULATION (CHIP SEAL) 892.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 521.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 404.00 TON ASPHALT CEMENT (AC-20-5TR) -------------------------------------------------------------------------------- PROPOSAL NO: 514056585 STATE PROJECT NO: K042-106 KA 3724-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: C106 KINGMAN SUMNER CHIP SEAL K-42: KA 3725 K-14 JCT E TO SU CO L, 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 1890.00 CUYD COVER MATERIAL (CM-L-2) 802.60 STA. MANIPULATION (CHIP SEAL) 802.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 385.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 298.00 TON ASPHALT CEMENT (AC-10-2TR) --------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 27 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 106.00 CUYD COVER MATERIAL (CM-L-2) 45.10 STA. MANIPULATION (CHIP SEAL) 45.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 22.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 17.00 TON ASPHALT CEMENT (AC-10-2TR) -------------------------------------------------------------------------------- PROPOSAL NO: 514056595 STATE PROJECT NO: I235-087 KA 3161-01 WORKING DAYS: 20 COMPLETION DATE: DBE GOAL: COUNTY: SEDGWICK BRIDGE REPAIR & POLYMER OVERLAY I-235: BR.NOS.(003)&(062) 0.69 MI N OF 47TH ST & 0.34 MI W O F I-135, I-235 SB TO I-135 NB 1.00 LSUM MOBILIZATION 25.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 44.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY) 600.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 87.00 SQYD CONCRETE MASONRY COATING 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 46.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY) 698.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 100.00 SQYD CONCRETE MASONRY COATING 394.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 387.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 4080.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 300.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 180.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 1500.00 EADA CHANNELIZER (PORTABLE) 240.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 1.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 2.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER) 4.70 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 28 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514056616 STATE PROJECT NO: 028 KA 3792-01 WORKING DAYS: 40 COMPLETION DATE: DBE GOAL: COUNTY: FINNEY ASPHALT CRACK REPAIR US-83:KA 3793 HS CO L N TO 2.92 MI N OF RS-247, 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 66469.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 39279.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 150579.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") PROPOSAL NO: 514056626 STATE PROJECT NO: K023-106 KA 3702-01 WORKING DAYS: 20 COMPLETION DATE: DBE GOAL: COUNTY: C106 FINNEY GRAY CHIP SEAL K-23: KA 3703 CIMARRON NCL N TO FI CO L, 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 1492.00 CUYD COVER MATERIAL (CM-L-2) 678.70 STA. MANIPULATION (CHIP SEAL) 678.70 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 304.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 236.00 TON ASPHALT CEMENT (AC-10-2TR) -------------------------------------------------------------------------------- 463.00 CUYD COVER MATERIAL (CM-L-2) 211.20 STA. MANIPULATION (CHIP SEAL) 211.20 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 94.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 29 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 73.00 TON ASPHALT CEMENT (AC-10-2TR) -------------------------------------------------------------------------------- PROPOSAL NO: 514056636 STATE PROJECT NO: K190-106 KA 3617-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: HASKELL SEWARD C106 ASPHALT CRACK REPAIR K-190: KA 3618 HS CO L E TO US-83 JCT, 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 16763.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 31763.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") PROPOSAL NO: 514056646 STATE PROJECT NO: U283-042 KA 3676-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: HODGEMAN CHIP SEAL US-283:FO CO L N TO S EWS OF BUCKNER BRIDGE IN JETMORE 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1697.00 CUYD COVER MATERIAL (CM-L-2) 606.50 STA. MANIPULATION (CHIP SEAL) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 606.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 346.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 268.00 TON ASPHALT CEMENT (AC-10-2TR) --------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 30 SUMMARY OF QUANTITIES DATE: 04/23/14 TIME: 3:03 PM LETTING DATE: May 21, 2014 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 514056656 STATE PROJECT NO: U056-106 KA 3809-01 WORKING DAYS: 35 COMPLETION DATE: DBE GOAL: COUNTY: C106 HASKELL SEWARD ASPHALT CRACK REPAIR US-56: KA 3810 5 MI NE OF K-25 JCT NE TO SW CO L, 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 56688.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 375.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") 90173.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2") PROPOSAL NO: 514056676 STATE PROJECT NO: U054-060 KA 2823-01 WORKING DAYS: 20 COMPLETION DATE: DBE GOAL: COUNTY: MEADE SLURRY SEAL US-54: PLAINS WCL E TO MEADE WCL 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1132.00 TON AGGREGATE FOR MICROSURFACING 23.00 TON MINERAL FILLER 136.00 TON EMULSIFIED ASPHALT (CSS-1H) (MODIFIED) 29176.00 LNFT PAVEMENT MARKING (EPOXY) (WHITE) ( 6") PROPOSAL NO: 514056686 STATE PROJECT NO: K025-102 KA 3660-14 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: WICHITA SIDEWALK IMPROVEMENTS VARIOUS LOCATIONS IN DISTRICT SIX 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 19.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE) 8.00 SQYD SIDEWALK RAMP 61.00 LNFT CURB AND GUTTER, COMBINED (AE) 1.00 LSUM SEEDING

Last updated : December 23, 2009