KDOT SUMMARY OF QUANTITIES
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 1
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
************************************************************
* PRIME CONTRACTORS SHALL NOTIFY KDOT OF THEIR *
* INTENT TO BID BY IDENTIFYING THEMSELVES AS A BID HOLDER *
************************************************************
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513062051 STATE PROJECT NO: U059-023 KA 2059-01
WORKING DAYS: 100 COMPLETION DATE: DBE GOAL: $53,000
COUNTY: DOUGLAS
GRADE, BRIDGE & SURFACING
BRIDGE (015), 0.14 M NORTH OF DG/FR CO L
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 CUYD FOUNDATION STABILIZATION (SET PRICE)
1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE)
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 LSUM CLEARING AND GRUBBING
239.00 CUYD COMMON EXCAVATION (RURAL SMALL)
623.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED)
545.00 CUYD ROCK EXCAVATION
271.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5)
424.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5)
1.00 MGAL WATER (GRADING) (SET PRICE)
1839.00 SQYD SALVAGED TOPSOIL
150.00 LNFT GUARDRAIL, STEEL PLATE (MGS)
642.25 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA1
4.00 EACH GUARDRAIL END TERMINAL (MGS-SRT)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA2
4.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT)
--------------------------------------------------------------------------------
1.00 LSUM TEMPORARY SEEDING
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
40.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 2
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
1013.00 SQYD EROSION CONTROL (CLASS 1) (TYPE A)
172.00 CUYD CLASS I EXCAVATION
10.00 CUYD CLASS II EXCAVATION
608.70 CUYD CONCRETE (GRADE 4.0) (AE) (SA)
65.90 CUYD CONCRETE (GRADE 4.0) (AE)
152090.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED)
3410.00 LBS. REINFORCING STEEL (GRADE 60)
300.00 LNFT PILES (STEEL) (HP10X42)
672.00 LNFT PILES (STEEL) (HP12X74)
46.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM
38.00 SQYD ABUTMENT STRIP DRAIN
417.00 CUYD SLOPE PROTECTION (SHOT ROCK)
649.00 SQYD BRIDGE DECK GROOVING
272.00 LNFT PRE-DRILLED PILE HOLES
107.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE)
21.40 CUYD BRIDGE APPROACH SLAB FOOTING
400.00 TON HMA-COMMERCIAL GRADE (CLASS A)
1126.00 SQYD AGGREGATE BASE (AB-3) ( 6")
1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE)
228.00 SQYD AGGREGATE SHOULDER (AS-1) ( 4")
1.00 MGAL WATER (AGGREGATE SHOULDERS) (SET PRICE)
1.00 LSUM SEEDING
PROPOSAL NO: 513062091 STATE PROJECT NO: I435-106 KA 2396-01
WORKING DAYS: 100 COMPLETION DATE: DBE GOAL: $25,000
COUNTY: JOHNSON WYANDOTTE C106
INTELLIGENT TRANSPORTATION SYSTEM
I-435 CORRIDOR FROM 95TH STREET N TO MISSOURI RIVER
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
32.00 CUYD COMMON EXCAVATION (RURAL SMALL)
16.00 TON AGGREGATE DITCH LINING ( 6")
75.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN)
34.00 LNFT SIGN POST (W 6 X 9 STEEL BEAM)
84.00 LNFT SIGN POST (W10X12 STEEL BEAM)
46.00 LNFT SIGN POST (W10X22 STEEL BEAM)
2.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W 6 X 9)
4.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X12)
2.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X22)
2.00 EACH SIGN POST BREAKAWAY BASE PLATE (W 6 X 9)
4.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X12)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 3
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
2.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X22)
44.00 LNFT SIGN POST FOOTING (24" STEEL BEAM POST CONCRETE)
22.00 LNFT SIGN POST FOOTING (30" STEEL BEAM POST CONCRETE)
12.00 LNFT SIGN POST FOOTING (18" WOOD POST CONCRETE)
1.00 LSUM SIGN (REMOVE AND RESET)
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
PROPOSAL NO: 513062131 STATE PROJECT NO: K268-070 KA 2077-01
WORKING DAYS: 70 COMPLETION DATE: DBE GOAL: $30,000
COUNTY: OSAGE
GRADE & SURFACING
K-268: 4.7 MI E OF US-75 (ABANDONED MOPAC RR)
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE)
1.00 CUYD FOUNDATION STABILIZATION (SET PRICE)
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM CLEANING EXISTING STRUCTURE
1.00 LSUM CLEARING AND GRUBBING
1800.50 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE
39149.00 CUYD COMMON EXCAVATION (RURAL SMALL)
2750.00 CUYD ROCK EXCAVATION
4770.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5)
9876.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5)
16833.00 SQYD SALVAGED TOPSOIL
1.00 MGAL WATER (GRADING) (SET PRICE)
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
22.00 CUYD SLOPE PROTECTION (RIPRAP STONE)
80.00 LNFT ENTRANCE PIPE ( 24")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 4
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
4.00 EACH END SECTION ( 24")
12.00 LNFT CROSS ROAD PIPE ( 24") (RCP)
2.00 EACH END SECTION ( 24") (RC)
1.00 EACH MAILBOX INSTALLATION (SET PRICE)
262.20 CUYD CONCRETE (GRADE 4.0) (RCB)
47030.00 LBS. REINFORCING STEEL (GRADE 60)
256.00 CUYD GRANULAR BACKFILL (WINGWALLS)
51.00 CUYD FOUNDATION STABILIZATION
890.00 LBS. TEMPORARY FERTILIZER (15-30-15)
133.50 LBS. TEMPORARY SEED (CANADA WILDRYE)
89.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS)
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
350.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
8.90 ACRE MULCHING (TEMPORARY)
6078.00 TON HMA-COMMERCIAL GRADE (CLASS A)
3933.00 SQYD AGGREGATE SHOULDER (AS-1) ( 6")
1.00 MGAL WATER (AGGREGATE SHOULDERS) (SET PRICE)
5.00 TON CALCIUM CHLORIDE
8690.00 SQYD AGGREGATE BASE (AB-3) ( 6")
553.00 SQYD AGGREGATE BASE (AB-3) ( 4")
1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE)
124.00 TON SURFACING MATERIAL (SPECIAL)
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
20.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE)
712.00 LBS. FERTILIZER (15-30-15)
14.20 LBS. SEED (BIG BLUESTEM GRASS) (KAW)
16.00 LBS. SEED (CANADA WILD-RYE)
13.40 LBS. SEED (INDIANGRASS) (OSAGE)
8.90 LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS)
12.50 LBS. SEED (SIDE OATS GRAMA) (EL RENO)
4.50 LBS. SEED (SWITCHGRASS) (BLACKWELL)
0.90 LBS. SEED (TALL DROP)
42.30 LBS. SEED (STERILE WHEATGRASS)
14.20 LBS. SEED (WESTERN WHEATGRASS) (BARTON)
65.40 LBS. SEED (NATIVE WILDFLOWER MIX 1)
1.00 ACRE MULCHING (PERMANENT) (SET PRICE)
12700.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
1780.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
2310.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
2100.00 EADA CHANNELIZER (PORTABLE)
1990.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 5
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513062333 STATE PROJECT NO: U083-055 KA 2403-01
WORKING DAYS: 30 COMPLETION DATE: DBE GOAL: $2,500
COUNTY: LOGAN
ROADSIDE IMPROVEMENT
HISTORIC BYWAY KIOSK ON US-83 IN LOGAN COUNTY
1.00 LSUM MOBILIZATION
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM CLEARING AND GRUBBING
1007.00 CUYD COMMON EXCAVATION (RURAL SMALL)
480.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-3-3)
1.00 MGAL WATER (GRADING) (SET PRICE)
35.00 LNFT ENTRANCE PIPE ( 30") (CSP)
2.00 EACH END SECTION ( 30") (CS)
155.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE)
4.00 SQYD SIDEWALK RAMP
1.00 LSUM TEMPORARY SEEDING
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
10.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
40.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE)
168.00 TON SURFACING MATERIAL (MILLINGS)
135.00 LNFT PAVEMENT MARKING (PAINT) (WHITE) ( 4")
1.00 EACH PAVEMENT MARKING SYMBOL (PAINT) (WHITE) (HANDICAP)
1.00 LSUM SEEDING
1.00 EACH KIOSK
1.00 LSUM ROADSIDE IMPROVEMENT
PROPOSAL NO: 513062353 STATE PROJECT NO: U024-090 KA 0041-01
WORKING DAYS: 210 COMPLETION DATE: DBE GOAL: $78,000
COUNTY: SHERIDAN
GRADE, BRIDGE & SURFACING,
STATE TIE: 24-90 KA-0042-01
SOUTH FORK SOLOMON RIVER BR. (005); 7.8 MI E OF JCT K-23/US
-24
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C)
1.00 CUYD FOUNDATION STABILIZATION (SET PRICE)
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 6
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRANSPORTING SALVAGEABLE MATERIAL
1.00 LSUM CLEARING AND GRUBBING
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
16099.00 CUYD COMMON EXCAVATION (RURAL SMALL)
3641.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED)
1093.00 CUYD ROCK EXCAVATION
10145.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5)
5113.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5)
1.00 MGAL WATER (GRADING) (SET PRICE)
10.50 CUYD CONCRETE (GRADE 4.0)
430.00 LBS. REINFORCING STEEL (GRADE 60)
312.00 LNFT CROSS ROAD PIPE ( 60") (ACSP)
104.00 LNFT CROSS ROAD PIPE ( 60") (INSTALL ONLY)
350.00 LNFT GUARDRAIL, STEEL PLATE (MGS)
836.00 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE
0.60 PMPS MOWING
8.00 EACH RIGHT-OF-WAY SURVEY MONUMENT
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA1
4.00 EACH GUARDRAIL END TERMINAL (MGS-SRT)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA2
4.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT)
--------------------------------------------------------------------------------
390.00 LBS. TEMPORARY FERTILIZER (15-30-15)
90.00 LBS. TEMPORARY SEED (CANADA WILDRYE)
150.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS)
23.40 LBS. SOIL EROSION MIX
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
420.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
3525.00 SQYD EROSION CONTROL (CLASS 2) (TYPE E)
160.00 SQYD EROSION CONTROL (CLASS 2) (TYPE F)
6.00 ACRE MULCHING (TEMPORARY)
266.00 CUYD CLASS I EXCAVATION
250.00 CUYD CLASS II EXCAVATION
481.90 CUYD CONCRETE (GRADE 4.0) (AE) (SA)
330.00 CUYD CONCRETE (GRADE 4.0) (AE)
117330.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED)
22120.00 LBS. REINFORCING STEEL (GRADE 60)
1610.00 LNFT PRESTRESSED CONCRETE BEAM (K3+2)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 7
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
2266.00 LNFT PILES (CONCRETE 12 3/4" SHELL PILE)
94.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM
90.00 CUYD ABUTMENT AGGREGATE DRAIN
1164.00 SQYD BRIDGE DECK GROOVING
451.00 CUYD SLOPE PROTECTION (SHOT ROCK)
200.00 LNFT TEST PILES (CONCRETE 12 3/4" SHELL)
8.00 SQYD SUBSTRUCTURE WATERPROOFING MEMBRANE
267.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE)
42.70 CUYD BRIDGE APPROACH SLAB FOOTING
3601.00 TON HMA-COMMERCIAL GRADE (CLASS A)
137.00 TON SURFACING MATERIAL (AB-3)
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE)
302.00 LBS. FERTILIZER (15-30-15)
0.30 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON)
16.70 LBS. SEED (SAND BLUESTEM GRASS) (GARDEN COUNTY)
9.00 LBS. SEED (SIDE OATS GRAMA) (EL RENO)
3.00 LBS. SEED (SWITCHGRASS) (BLACKWELL)
6.00 LBS. SEED (BIG BLUESTEM GRASS) (KAW)
6.00 LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS)
0.50 LBS. SEED (SAND DROPSEED)
16.00 LBS. SEED (BUFFALO GRASS) (TREATED)
10.00 LBS. SEED (WESTERN WHEATGRASS) (BARTON)
28.00 LBS. SEED (STERILE WHEATGRASS)
35.50 LBS. SEED (NATIVE WILDFLOWER MIX 3)
1.00 ACRE MULCHING (PERMANENT) (SET PRICE)
11160.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
11160.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
9300.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
24800.00 EADA CHANNELIZER (PORTABLE)
7440.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
620.00 EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY)
275.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
162.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT)
13.50 STAL PAVEMENT MARKING (TEMP) (BROKEN) (LINE MASKING TAPE)
170.00 EACH TEMPORARY RAISED PAVEMENT MARKER (TYPE I)
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 8
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513062373 STATE PROJECT NO: U024-090 KA 0042-01
WORKING DAYS: 210 COMPLETION DATE: DBE GOAL: $46,000
COUNTY: SHERIDAN
GRADE, BRIDGE & SURFACING,
STATE TIE: 24-90 KA-0041-01
SOUTH FORK SOLOMON RIVER BR. (007); 9.3 MI E OF JCT K-23/US
-24
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C)
1.00 CUYD FOUNDATION STABILIZATION (SET PRICE)
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE)
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
1.00 LSUM TRANSPORTING SALVAGEABLE MATERIAL
1.00 LSUM CLEARING AND GRUBBING
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
38445.00 CUYD COMMON EXCAVATION (RURAL SMALL)
23210.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED)
1790.00 CUYD ROCK EXCAVATION
29368.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5)
7342.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5)
1.00 MGAL WATER (GRADING) (SET PRICE)
10.70 CUYD CONCRETE (GRADE 4.0)
440.00 LBS. REINFORCING STEEL (GRADE 60)
96.00 LNFT CROSS ROAD PIPE ( 24")
104.00 LNFT CROSS ROAD PIPE ( 30")
512.00 LNFT CROSS ROAD PIPE ( 60") (INSTALL ONLY)
4.00 EACH END SECTION ( 24")
4.00 EACH END SECTION ( 30")
350.00 LNFT GUARDRAIL, STEEL PLATE (MGS)
836.00 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE
192.00 CUYD SLOPE PROTECTION (RIPRAP STONE)
0.80 PMPS MOWING
4.00 EACH RIGHT-OF-WAY SURVEY MONUMENT
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA1
4.00 EACH GUARDRAIL END TERMINAL (MGS-SRT)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA2
4.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT)
--------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 9
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
598.00 LBS. TEMPORARY FERTILIZER (15-30-15)
138.00 LBS. TEMPORARY SEED (CANADA WILDRYE)
230.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS)
9.60 LBS. SOIL EROSION MIX
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
644.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
1359.00 SQYD EROSION CONTROL (CLASS 2) (TYPE E)
209.00 SQYD EROSION CONTROL (CLASS 2) (TYPE F)
9.20 ACRE MULCHING (TEMPORARY)
393.00 CUYD CLASS I EXCAVATION
240.00 CUYD CLASS II EXCAVATION
490.30 CUYD CONCRETE (GRADE 4.0) (AE) (SA)
313.40 CUYD CONCRETE (GRADE 4.0) (AE)
121470.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED)
22240.00 LBS. REINFORCING STEEL (GRADE 60)
1610.00 LNFT PRESTRESSED CONCRETE BEAM (K3+2)
4257.00 LNFT PILES (STEEL) (HP10X42)
100.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM
90.00 CUYD ABUTMENT AGGREGATE DRAIN
1165.00 SQYD BRIDGE DECK GROOVING
302.00 CUYD SLOPE PROTECTION (SHOT ROCK)
327.00 LNFT TEST PILES (STEEL) (HP10X42)
8.00 SQYD SUBSTRUCTURE WATERPROOFING MEMBRANE
309.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE)
43.40 CUYD BRIDGE APPROACH SLAB FOOTING
5674.00 TON HMA-COMMERCIAL GRADE (CLASS A)
456.00 TON SURFACING MATERIAL (AB-3)
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
460.00 LBS. FERTILIZER (15-30-15)
0.50 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON)
25.70 LBS. SEED (SAND BLUESTEM GRASS) (GARDEN COUNTY)
14.00 LBS. SEED (SIDE OATS GRAMA) (EL RENO)
4.00 LBS. SEED (SWITCHGRASS) (BLACKWELL)
9.00 LBS. SEED (BIG BLUESTEM GRASS) (KAW)
9.00 LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS)
0.80 LBS. SEED (SAND DROPSEED)
22.00 LBS. SEED (BUFFALO GRASS) (TREATED)
16.00 LBS. SEED (WESTERN WHEATGRASS) (BARTON)
43.00 LBS. SEED (STERILE WHEATGRASS)
54.60 LBS. SEED (NATIVE WILDFLOWER MIX 3)
1.00 ACRE MULCHING (PERMANENT) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 10
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513062515 STATE PROJECT NO: 008 C 0474-01
WORKING DAYS: 70 COMPLETION DATE: DBE GOAL: $30,000
COUNTY: BUTLER
PEDESTRIAN & BICYCLE PATHS
CITY OF ROSE HILL
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 EACH MAILBOX INSTALLATION (SET PRICE)
1.00 LSUM CLEARING AND GRUBBING
536.00 CUYD COMMON EXCAVATION (URB)
350.00 CUYD ROCK EXCAVATION
1.00 MGAL WATER (GRADING) (SET PRICE)
4723.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE)
205.00 SQYD SIDEWALK RAMP
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
6.00 EACH ADJUSTMENT OF VALVE BOX (WATER)
1.00 LSUM TEMPORARY SEEDING
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
50.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
1559.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE)
292.00 LNFT CURB AND GUTTER, COMBINED (AE)
30.00 LNFT CURB, EDGE ( 6.0") (AE)
347.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12")
232.00 LNFT PAVEMENT MARKING REMOVAL
1.00 LSUM SEEDING
PROPOSAL NO: 513062525 STATE PROJECT NO: U400-008 KA 3339-01
WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: $0
COUNTY: BUTLER
PAVEMENT MARKING
US-400:0.75 MI E OF LEON ECL E TO GW CO L
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
718.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT)
23540.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4")
144632.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
168172.00 LNFT PAVEMENT MARKING REMOVAL
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 11
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513062535 STATE PROJECT NO: K061-106 KA 1501-01
WORKING DAYS: 140 COMPLETION DATE: DBE GOAL: $0
COUNTY: RENO MCPHERSON C106
INTELLIGENT TRANSPORTATION SYSTEM
K-61 CORRIDOR: FIBER OPTIC EXPANSION OF 17TH AVE IN HUTCH, N
E TO I-135 E OF MCPHERSON
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM INTELLIGENT TRANSPORTATION SYSTEM
PROPOSAL NO: 513062545 STATE PROJECT NO: K014-078 KA 3340-01
WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: $0
COUNTY: RENO
PAVEMENT MARKING
K-14:US-50 JCT N TO MM 108
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
428.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
348.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
57490.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (YELLOW) ( 4")
119199.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
10741.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8")
1587.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12")
22871.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6")
471.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12")
109.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
12.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW)
212468.00 LNFT PAVEMENT MARKING REMOVAL
PROPOSAL NO: 513062555 STATE PROJECT NO: K096-087 KA 3297-01
WORKING DAYS: 85 COMPLETION DATE: DBE GOAL: $0
COUNTY: SEDGWICK
PAVEMENT MARKING
K-96:I-135 JCT E TO US-54 JCT INCLUDE ALL RAMPS
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
502.60 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
1070.20 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
96.30 STAL PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE I TAPE OR
2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 12
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
166012.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
25297.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8")
4334.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12")
150209.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6")
27445.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (WHITE) ( 6")
632.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
32.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW)
2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) THRU-LT ARROW
4.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW)
373929.00 LNFT PAVEMENT MARKING REMOVAL
PROPOSAL NO: 513062575 STATE PROJECT NO: K096-087 KA 3298-01
WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: $0
COUNTY: SEDGWICK
PAVEMENT MARKING
K-96:EB FROM RN CO L E 0.1 MI E OF 295TH RD, WB 0.1 MI E OF
295TH RD E TO 0.25 MI W OF MAIZE RD
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
50.40 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
781.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
83289.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
916.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4")
79094.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6")
19573.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (WHITE) ( 6")
92.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
105.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (YELLOW) (12")
6.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW)
183069.00 LNFT PAVEMENT MARKING REMOVAL
PROPOSAL NO: 513062595 STATE PROJECT NO: U054-087 KA 3318-01
WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: $0
COUNTY: SEDGWICK
PAVEMENT MARKING
US-54: HMA SECTION E OF 111TH ST E TO RIDGE ROAD JCT
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
383.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
217.70 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
25019.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
16972.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8")
4102.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12")
28816.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 13
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
10816.00 LNFT PAVEMENT MARKING (PATTERNED COLD PLASTIC) (WHITE) ( 6")
2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW)
85725.00 LNFT PAVEMENT MARKING REMOVAL
PROPOSAL NO: 513064313 STATE PROJECT NO: 012 C 4538-01
WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: $0
COUNTY: CHEYENNE
BRIDGE
5 MI S & 7 MI W OF ST FRANCIS
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C)
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE)
164.00 CUYD CONCRETE (GRADE 4.0) (RCB BR)
29270.00 LBS. REINFORCING STEEL (GRADE 60)
230.00 CUYD CLASS III EXCAVATION (RCB)
44.00 CUYD FOUNDATION STABILIZATION
PROPOSAL NO: 513064353 STATE PROJECT NO: 055 C 0337-01
WORKING DAYS: 80 COMPLETION DATE: DBE GOAL: $2,900
COUNTY: LOGAN
GRADE & CULVERT
2 RCBS: 1.5 MI N & 2.5 MI W OF RUSSELL SPRINGS
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C)
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM CLEARING AND GRUBBING
757.00 CUYD COMMON EXCAVATION (RURAL SMALL)
3855.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED)
3228.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90)
1.00 MGAL WATER (GRADING) (SET PRICE)
8.00 EACH SIGNING OBJECT MARKER (TYPE 3)
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
132.00 CUYD GRANULAR BACKFILL (WINGWALLS)
34640.00 LBS. REINFORCING STEEL (GRADE 60)
202.60 CUYD CONCRETE (GRADE 4.0) (RCB)
60.00 CUYD FOUNDATION STABILIZATION
2.00 EACH TWORKS SIGN ASSEMBLY (BLP)
200.00 LBS. TEMPORARY FERTILIZER (16-20- 0)
30.00 LBS. TEMPORARY SEED (CANADA WILDRYE)
50.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS)
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 14
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
200.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
2.00 ACRE MULCHING (TEMPORARY)
100.00 LBS. FERTILIZER (16-20- 0)
1.00 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON)
49.00 LBS. SEED (BUFFALO GRASS) (TREATED)
4.60 LBS. SEED (SIDE OATS GRAMA) (EL RENO)
8.00 LBS. SEED (STERILE WHEATGRASS)
7.20 LBS. SEED (WESTERN WHEATGRASS) (BARTON)
1.00 ACRE MULCHING (PERMANENT) (SET PRICE)
PROPOSAL NO: 513064373 STATE PROJECT NO: 082 C 0338-01
WORKING DAYS: 65 COMPLETION DATE: DBE GOAL: $2,500
COUNTY: ROOKS
GRADE, BRIDGE & SURFACING
1.0 MI N AND 0.9 MI W OF DAMAR
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C)
1.00 LSUM MOBILIZATION
1.00 LSUM MOBILIZATION (DBE)
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM CLEARING AND GRUBBING
1458.00 CUYD COMMON EXCAVATION (RURAL SMALL)
802.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED)
1582.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90)
4.00 EACH SIGNING OBJECT MARKER (TYPE 3)
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
2.00 EACH TWORKS SIGN ASSEMBLY (BLP)
1.00 LSUM TEMPORARY SEEDING
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
100.00 LNFT TEMPORARY DITCH CHECK
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
164.00 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR)
29270.00 LBS. REINFORCING STEEL (GRADE 60)
230.00 CUYD CLASS III EXCAVATION (RCB)
44.00 CUYD FOUNDATION STABILIZATION
92.00 CUYD GRANULAR BACKFILL (WINGWALLS)
1.00 LSUM SEEDING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 15
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513066001 STATE PROJECT NO: U159-106 KA 3343-01
WORKING DAYS: 45 COMPLETION DATE: DBE GOAL:
COUNTY: ATCHISON BROWN C106
ASPHALT CRACK REPAIR
US-159:KA 3344 BR CO L S TO JF CO L,
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
311670.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
500.00 LNFT SEALING ASPHALT CRACKS (>1/2" <2.0")
2650.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
PROPOSAL NO: 513066011 STATE PROJECT NO: K016-106 KA 3279-01
WORKING DAYS: 30 COMPLETION DATE: DBE GOAL:
COUNTY: JACKSON JEFFERSON C106
ASPHALT CRACK REPAIR
K-16:KA 3280 K-116 JCT E TO JF CO L,
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
63000.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
153000.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
PROPOSAL NO: 513066031 STATE PROJECT NO: K007-046 KA 3324-01
WORKING DAYS: 20 COMPLETION DATE: DBE GOAL:
COUNTY: JOHNSON
CULVERT REPAIR
K-7:K-10 JCT N TO K-32 JCT
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
214.00 LNFT LINER PIPE ( 15")
255.00 LNFT LINER PIPE ( 18")
90.00 LNFT LINER PIPE ( 24")
2.00 EACH INLET (MANHOLE) (SPECIAL)
3.00 EACH INLET (TYPE II DITCH)
559.00 LNFT LINER PIPE (8.0 SQ.FT)
2.00 LNFT STORM SEWER (15") (CSP)
3.00 LNFT STORM SEWER (18") (CSP)
1.00 LNFT STORM SEWER (24") (CSP)
1.00 LSUM SEEDING
735.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
270.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 16
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
70.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER)
70.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN
1200.00 EADA CHANNELIZER (PORTABLE)
70.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
70.00 EADA ARROW DISPLAY
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
PROPOSAL NO: 513066051 STATE PROJECT NO: U056-046 KA 3325-01
WORKING DAYS: 30 COMPLETION DATE: DBE GOAL:
COUNTY: JOHNSON
CULVERT REPAIR
US-56:SHAREDON ST JCT E TO 55TH ST
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
7.00 EACH INLET (TYPE 22 CURB)
154.00 LNFT CURB AND GUTTER, COMBINED (AE)
56.00 LNFT STORM SEWER (15") (RCP)
1.00 LSUM SEEDING
630.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
1755.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
315.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER)
180.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
3240.00 EADA CHANNELIZER (PORTABLE)
1350.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
180.00 EADA ARROW DISPLAY
90.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
PROPOSAL NO: 513066071 STATE PROJECT NO: I035-056 KA 3192-01
WORKING DAYS: 85 COMPLETION DATE: DBE GOAL:
COUNTY: LYON
BRIDGE REPAIR & POLYMER OVERLAY
I-35:BR.NO.(016)&(117) 2.57 & 2.6 MI E OF K-99 OVER US-50 &
BR.NOS.(118)SB & (119)NB 3.69 MI E OF K-99 OVER THE NEOSHO R
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 LSUM MOBILIZATION
10.00 SQYD AREA PREPARED FOR PATCHING
5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH)
1447.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
208.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY)
17.30 CUYD CONCRETE (GRADE 4.0) (AE)
10.00 SQYD AREA PREPARED FOR PATCHING
5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH)
1066.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 17
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
86.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY)
8.10 CUYD CONCRETE (GRADE 4.0) (AE)
10.00 SQYD AREA PREPARED FOR PATCHING
5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH)
2061.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
10.00 SQYD AREA PREPARED FOR PATCHING
5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH)
2061.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
738.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
2460.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
1230.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER)
492.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
24600.00 EADA CHANNELIZER (PORTABLE)
1968.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
246.00 EADA ARROW DISPLAY
170.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
11.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(FLEX RAISED)
26157.00 LNFT PAVEMENT MARKING REMOVAL
1713.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY)
1713.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE)
2.00 EACH INERTIAL BARRIER SYSTEM
21.00 EACH REPLACEMENT MODULES
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
PROPOSAL NO: 513066081 STATE PROJECT NO: K031-106 KA 3346-01
WORKING DAYS: 15 COMPLETION DATE: DBE GOAL:
COUNTY: OSAGE WABAUNSEE C106
CHIP SEAL
K-31:KA 3347 K-99 JCT E TO OS CO L,
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE)
1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE)
1184.00 CUYD COVER MATERIAL (CM-L-2)
541.30 STA. MANIPULATION (CHIP SEAL)
541.30 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA1
229.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 18
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA2
187.00 TON ASPHALT CEMENT (AC-10-2TR)
--------------------------------------------------------------------------------
684.00 CUYD COVER MATERIAL (CM-L-2)
307.50 STA. MANIPULATION (CHIP SEAL)
307.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
--------------------------------------------------------------------------------
ALTERNATE SECTION: BB1
133.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
--------------------------------------------------------------------------------
ALTERNATE SECTION: BB2
108.00 TON ASPHALT CEMENT (AC-10-2TR)
--------------------------------------------------------------------------------
PROPOSAL NO: 513066091 STATE PROJECT NO: I470-089 KA 2806-01
WORKING DAYS: 35 COMPLETION DATE: DBE GOAL:
COUNTY: SHAWNEE
BRIDGE REPAIR & POLYMER OVERLAY
I-470: BR.NOS. (057) & (056) 1.91 & 1.92 MI SE OF W US-75 JC
T OVER SHUNGANUNGA CREEK & (172) & (171) 1.93 & 1.95 MI E OF
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
8.00 SQYD AREA PREPARED FOR PATCHING
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE)
814.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
8.00 SQYD AREA PREPARED FOR PATCHING
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE)
820.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
19.00 SQYD AREA PREPARED FOR PATCHING
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
2001.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
26.00 SQYD AREA PREPARED FOR PATCHING
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE)
2698.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
236.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
348.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
180.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER)
416.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 19
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
2800.00 EADA CHANNELIZER (PORTABLE)
160.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
40.00 EADA ARROW DISPLAY
32.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN
221.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
20.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(FLEX RAISED)
30.00 STAL PAVEMENT MARKING (TEMP) (SOLID) (LINE MASKING TAPE)
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
PROPOSAL NO: 513066111 STATE PROJECT NO: K007-105 KA 3135-01
WORKING DAYS: 50 COMPLETION DATE: DBE GOAL:
COUNTY: WYANDOTTE
CULVERT REPAIR
K-7:AT NETTLETON AVENUE
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
76.80 CUYD CONCRETE (GRADE 4.0) (AE)
9530.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED)
1150.00 LBS. STRUCTURAL STEEL
34.00 LNFT FENCE (CHAIN LINK) ( 7'-0")
50.00 LNFT HANDRAIL (METAL-GALVANIZED)
31.00 EACH DRILLING AND GROUTING
222.00 CUYD PRE-GROUTING
800.00 LNFT LINER PIPE (HOST)
267.00 LNFT LINER PIPE (LATERAL)
40.00 SQYD RIPRAP (HEAVY STONE) (1/4 TON)
20.00 LNFT SLOTTED DRAIN (15")
160.00 LNFT SLOTTED DRAIN (30")
4.00 EACH TEMPORARY INLET SEDIMENT BARRIER
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 LSUM SEEDING
PROPOSAL NO: 513066131 STATE PROJECT NO: U075-070 KA 2182-01
WORKING DAYS: 90 COMPLETION DATE: DBE GOAL:
COUNTY: OSAGE
MILL & HMA OVERLAY
US-75: CF CO L N TO 0.459 MI N OF MARAIS DES CYGNES RIVER BR
IDGE
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
666.00 EACH DRILLING AND GROUTING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 20
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
2624.00 SQYD CONCRETE PAVEMENT (10.5" UNIFORM) (AE) (BR APP)
766.00 CUYD ROCK EXCAVATION
156139.00 SQYD MILLING
29648.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22)
1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT
1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT
29648.00 TON QUALITY CONTROL TESTING (HMA)
1.00 EACH ASPHALT CORE (SET PRICE)
1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE)
67.00 TON EMULSIFIED ASPHALT (SS-1HP)
371.00 STA. MANIPULATION (CHIP SEAL)
81.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
462.00 CUYD COVER MATERIAL (CM-L-1)
1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE)
110.00 TON HMA-COMMERCIAL GRADE (CLASS A) (PATCHING)
74959.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
3930.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8")
2086.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12")
35135.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4")
11160.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
10260.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
169200.00 EADA CHANNELIZER (PORTABLE)
5040.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY)
2.00 EACH TWORKS SIGN ASSEMBLY (LARGE)
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
3513.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY)
10213.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE)
14.00 EACH REPLACEMENT MODULES
8.00 EACH INERTIAL BARRIER SYSTEM
371.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT
191.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
4772.00 LNFT PAVEMENT MARKING REMOVAL
PROPOSAL NO: 513066151 STATE PROJECT NO: U075-070 KA 2184-01
WORKING DAYS: 140 COMPLETION DATE: DBE GOAL:
COUNTY: OSAGE
MILL & HMA OVERLAY,
STATE TIE: 75-89 KA 2185-01
US-75: 4/LANE N TO SN CO L
1.00 LSUM MOBILIZATION
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT
1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE)
1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 21
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
1.00 EACH ASPHALT CORE (SET PRICE)
1.00 LSUM ASPHALT PAVEMENT SMOOTHNESS
1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE)
1404.00 CUYD ROCK EXCAVATION
346.40 STA. LINEAR GRADING (TYPE B) (MR-90)
496.00 LNFT LINER PIPE ( 15")
14.00 EACH RESETTING END SECTION
2.00 EACH END SECTION ( 15") (CS)
1.00 EACH END SECTION ( 15") (RC)
1.00 LSUM CLEANING EXISTING STRUCTURE
480.00 EACH DRILLING AND GROUTING
1802.00 SQYD CONCRETE PAVEMENT (10.5" UNIFORM) (AE) (BR APP)
260049.00 SQYD MILLING
43562.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22)
57.00 TON EMULSIFIED ASPHALT (SS-1HP)
217.00 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID)
43562.00 TON QUALITY CONTROL TESTING (HMA)
139892.00 LNFT SAW AND SEAL JOINT (HMA)
986.00 TON HMA-COMMERCIAL GRADE (CLASS A)
2107.00 SQYD PCCP PATCHING (FULL DEPTH) ( 9") (SOUND)
1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE)
98142.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
75784.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6")
2786.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8")
454.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12")
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
2940.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
5040.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
2100.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER)
420.00 EADA ARROW DISPLAY
84840.00 EADA CHANNELIZER (PORTABLE)
1260.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
4563.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY)
11288.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE)
12.00 EACH INERTIAL BARRIER SYSTEM
2.00 EACH TWORKS SIGN ASSEMBLY (LARGE)
15.00 EACH REPLACEMENT MODULES
6297.00 LNFT PAVEMENT MARKING REMOVAL
1903.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT
291.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 22
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513066171 STATE PROJECT NO: U075-089 KA 2185-01
WORKING DAYS: 140 COMPLETION DATE: DBE GOAL:
COUNTY: SHAWNEE
MILL & HMA OVERLAY,
STATE TIE: 75-70 KA 2184-01
US-75: OS CO L N TO TOPEKA BLVD
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT
1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE)
1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT
1.00 EACH ASPHALT CORE (SET PRICE)
1.00 LSUM ASPHALT PAVEMENT SMOOTHNESS
1.00 MGAL WATER (GRADING) (SET PRICE)
754.00 CUYD ROCK EXCAVATION
129.40 STA. LINEAR GRADING (TYPE B) (MR-90)
10.00 EACH RESETTING END SECTION
5.00 EACH END SECTION ( 15") (CS)
2.00 EACH END SECTION ( 15") (RC)
1.00 LSUM CLEANING EXISTING STRUCTURE
480.00 EACH DRILLING AND GROUTING
1987.00 SQYD CONCRETE PAVEMENT (10.5" UNIFORM) (AE) (BR APP)
88733.00 SQYD MILLING
14481.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22)
19.00 TON EMULSIFIED ASPHALT (SS-1HP)
74.00 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID)
14481.00 TON QUALITY CONTROL TESTING (HMA)
48335.00 LNFT SAW AND SEAL JOINT (HMA)
986.00 TON HMA-COMMERCIAL GRADE (CLASS A)
604.00 SQYD PCCP PATCHING (FULL DEPTH) ( 9") (SOUND)
1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE)
33322.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
26112.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6")
733.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8")
92.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 23
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513066292 STATE PROJECT NO: K015-101 KA 2807-01
WORKING DAYS: 40 COMPLETION DATE: DBE GOAL:
COUNTY: WASHINGTON
BRIDGE REPAIR
K-15: BR NO (024) 6.59 MI N OF K-9 JCT OVER MILL CREEK
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE)
1180.00 LBS. REINFORCING STEEL (GRADE 60)
4.40 CUYD CONCRETE (GRADE 4.0) (AE)
120.00 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE
320.00 LNFT GUARDRAIL, REMOVAL AND RECONSTRUCTION OF STEEL PLATE
125.00 LNFT GUARDRAIL, STEEL PLATE
124.00 EACH DRILLING AND GROUTING
1020.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
780.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
540.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
3480.00 EADA CHANNELIZER (PORTABLE)
675.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
225.00 EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY)
96.70 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
2849.00 LNFT PAVEMENT MARKING REMOVAL
150.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY)
425.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - INSTALL ONLY)
1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY)
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
PROPOSAL NO: 513066414 STATE PROJECT NO: 106 KA 3327-01
WORKING DAYS: 20 COMPLETION DATE: DBE GOAL:
COUNTY: ANDERSON LINN C106
CHIP SEAL
K-31:KA 3328 S US-59 JCT E TO LN CO L,
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE)
594.00 CUYD COVER MATERIAL (CM-L-2)
266.00 STA. MANIPULATION (CHIP SEAL)
266.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 24
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA1
115.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA2
94.00 TON ASPHALT CEMENT (AC-10-2TR)
--------------------------------------------------------------------------------
1448.00 CUYD COVER MATERIAL (CM-L-2)
651.00 STA. MANIPULATION (CHIP SEAL)
651.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
--------------------------------------------------------------------------------
ALTERNATE SECTION: BB1
280.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
--------------------------------------------------------------------------------
ALTERNATE SECTION: BB2
229.00 TON ASPHALT CEMENT (AC-10-2TR)
--------------------------------------------------------------------------------
552.00 CUYD COVER MATERIAL (CM-L-2)
231.00 STA. MANIPULATION (CHIP SEAL)
231.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
--------------------------------------------------------------------------------
ALTERNATE SECTION: CC1
107.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
--------------------------------------------------------------------------------
ALTERNATE SECTION: CC2
87.00 TON ASPHALT CEMENT (AC-10-2TR)
--------------------------------------------------------------------------------
932.00 CUYD COVER MATERIAL (CM-L-2)
418.00 STA. MANIPULATION (CHIP SEAL)
418.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
--------------------------------------------------------------------------------
ALTERNATE SECTION: DD1
180.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 25
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
--------------------------------------------------------------------------------
ALTERNATE SECTION: DD2
147.00 TON ASPHALT CEMENT (AC-20-5TR)
--------------------------------------------------------------------------------
PROPOSAL NO: 513066434 STATE PROJECT NO: 006 KA 3349-01
WORKING DAYS: 50 COMPLETION DATE: DBE GOAL:
COUNTY: BOURBON
CHIP SEAL
K-31: KA 3351 E K-7 JCT E TO US-69 JCT
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE)
2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
54922.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
136.00 CUYD COVER MATERIAL (CM-L-1)
80.00 STA. MANIPULATION (CHIP SEAL)
80.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
26.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
255516.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
603.00 CUYD COVER MATERIAL (CM-L-1)
372.00 STA. MANIPULATION (CHIP SEAL)
372.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
107.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
PROPOSAL NO: 513066454 STATE PROJECT NO: I035-106 KA 3310-01
WORKING DAYS: 25 COMPLETION DATE: DBE GOAL:
COUNTY: COFFEY FRANKLIN MIAMI
CONCRETE PAVEMENT PATCHING
I-35: KA 3311-01 MP 155 N TO OS CO L;
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE)
1.00 HOUR FLAGGER (SET PRICE)
1.00 HOUR FLAGGER (SET PRICE)
10.00 SQYD PCCP EDGE JOINT PATCHING (PARTIAL DEPTH)
10.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH)
30.00 SQYD PCCP EDGE JOINT PATCHING (FULL DEPTH)
10.00 SQYD PCCP EDGE JOINT PATCHING (PARTIAL DEPTH)
2.00 SQYD PCCP JOINT AND CRACK PATCHING (FULL DEPTH)
4.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH)
127.00 SQYD PCCP PATCHING (FULL DEPTH) (12") (SOUND)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 26
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
66.00 EACH TIE BAR INSERTION
89.00 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE)
552.00 LNFT SEALING PCCP CRACKS (>1/8" <2.0")
144.00 SQYD PCCP EDGE JOINT PATCHING (FULL DEPTH)
53.00 SQYD PCCP EDGE JOINT PATCHING (PARTIAL DEPTH)
185.00 SQYD PCCP JOINT AND CRACK PATCHING (FULL DEPTH)
109.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH)
856.00 SQYD PCCP PATCHING (FULL DEPTH) (12") (SOUND)
630.00 EACH TIE BAR INSERTION
2146.00 LNFT SEALING PCCP CRACKS (>1/8" <2.0")
16.00 SQYD PCCP EDGE JOINT PATCHING (PARTIAL DEPTH)
6.00 SQYD PCCP JOINT AND CRACK PATCHING (FULL DEPTH)
7.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH)
121.00 SQYD PCCP PATCHING (FULL DEPTH) (12") (SOUND)
396.00 LNFT SEALING PCCP CRACKS (>1/8" <2.0")
PROPOSAL NO: 513066474 STATE PROJECT NO: I035-030 KA 3181-01
WORKING DAYS: 110 COMPLETION DATE: DBE GOAL:
COUNTY: FRANKLIN
BRIDGE REPAIR & SILICA FUME OVERLAY
I-35:BR.NO.(017) 14.02 MI E OS CO L AT RS 1928
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 LSUM MOBILIZATION
37.00 CUYD ROCK EXCAVATION
92.00 LNFT EXPANSION JOINT (MEMBRANE SEALANT)
44.00 CUYD CLASS III EXCAVATION
59.00 CUYD CONCRETE (GRADE 4.0) (AE)
4460.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED)
1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE)
78.00 EACH DRILLING AND GROUTING
30.00 SQYD ABUTMENT STRIP DRAIN
39.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM
1.00 LSUM BRIDGE PAINTING (ORGANIC ZINC W/ ACRYLIC SYSTEM)
1.00 LSUM ENVIRONMENTAL PROTECTION
125.00 SQYD AREA PREPARED FOR PATCHING
30.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH)
1465.00 SQYD MACHINE PREPARATION (1.50")
1509.00 SQYD SILICA FUME OVERLAY (1.50")
1.00 CUYD MATERIAL FOR SILICA FUME OVERLAY (SET PRICE)
132.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE)
4620.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
3795.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
1650.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER)
3465.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
13200.00 EADA CHANNELIZER (PORTABLE)
2970.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 27
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
330.00 EADA ARROW DISPLAY
38.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
9.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS)
4.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER)
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
2.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
PROPOSAL NO: 513066494 STATE PROJECT NO: U075-063 KA 3352-01
WORKING DAYS: 15 COMPLETION DATE: DBE GOAL:
COUNTY: MONTGOMERY
CHIP SEAL
US-75:INDEPENDENCE NCL N TO S US-400 JCT
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 LSUM MOBILIZATION
41930.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
954.00 CUYD COVER MATERIAL (CM-L-2)
385.00 STA. MANIPULATION (CHIP SEAL)
1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE)
385.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA1
185.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL)
--------------------------------------------------------------------------------
ALTERNATE SECTION: AA2
151.00 TON ASPHALT CEMENT (AC-20-5TR)
--------------------------------------------------------------------------------
PROPOSAL NO: 513066514 STATE PROJECT NO: K047-103 KA 3353-01
WORKING DAYS: 20 COMPLETION DATE: DBE GOAL:
COUNTY: WILSON
ASPHALT CRACK REPAIR
K-47: JUST E OF US-400 JCT (END OF PCCP) E TO ALTOONA WCL
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 LSUM MOBILIZATION
147885.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 28
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513066615 STATE PROJECT NO: U183-106 KA 3319-01
WORKING DAYS: 30 COMPLETION DATE: DBE GOAL:
COUNTY: KIOWA COMANCHE EDWARDS
ASPHALT CRACK REPAIR
KA 3321 CM CO L N TO ED CO L;
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
38914.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
119038.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
58423.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
PROPOSAL NO: 513066635 STATE PROJECT NO: U160-039 U 0141-01
WORKING DAYS: 30 COMPLETION DATE: DBE GOAL:
COUNTY: HARPER
MILL & HMA OVERLAY
US-160: K-14 JCT E TO HARPER ECL
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM MOBILIZATION
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
1.00 LSUM TRAFFIC CONTROL
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
6.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER)
4839.00 TON TRANSPORTING SALVAGEABLE MATERIAL (0-2.5MI)
1.00 CUYD COMMON EXCAVATION (URB)
14.00 CUYD ROCK EXCAVATION
2.00 EACH INLET (TYPE 22 RADIUS) (SPECIAL)
128.00 LNFT CROSS ROAD PIPE ( 7.0 SQ.FT.) (RCPHE)
4.00 EACH END SECTION ( 7.0 SQ.FT.) (RCHE)
83.20 CUYD FLOWABLE FILL (LOW STRENGTH)
69.00 LNFT STORM SEWER (24") (RCP)
86.00 LNFT CURB AND GUTTER, COMBINED (AE)
21.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE)
6.00 SQYD SIDEWALK RAMP
189.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT
450.00 TON HMA-COMMERCIAL GRADE (CLASS A) (PATCHING)
3444.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22)
5250.00 TON HMA OVERLAY (SR-19A) (PG 64-22)
8694.00 TON QUALITY CONTROL TESTING (HMA)
8883.00 TON MILLING
189.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT)
13.00 TON EMULSIFIED ASPHALT (SS-1HP)
246.00 TON PAVEMENT EDGE WEDGE (ROCK)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 29
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE)
1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT
1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT
1.00 LSUM ASPHALT PAVEMENT SMOOTHNESS
1.00 EACH ASPHALT CORE (SET PRICE)
2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW)
2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (SCHOOL)
88.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12")
77.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
310.00 LNFT PAVEMENT MARKING (EPOXY) (YELLOW) (12")
15063.00 LNFT PAVEMENT MARKING (EPOXY) (WHITE) ( 6")
11578.00 LNFT PAVEMENT MARKING (EPOXY) (YELLOW) ( 4")
PROPOSAL NO: 513066655 STATE PROJECT NO: 039 U 0170-01
WORKING DAYS: 35 COMPLETION DATE: DBE GOAL:
COUNTY: HARPER
MILL & HMA OVERLAY
K-2: ANTHONY WCL TO NCL , K-44: K-2 JCT E TO ANTHONY ECL
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM MOBILIZATION
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT
1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT
1.00 EACH ASPHALT CORE (SET PRICE)
1.00 LSUM ASPHALT PAVEMENT SMOOTHNESS
1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE)
15016.00 TON QUALITY CONTROL TESTING (HMA)
2556.00 SQYD CRUSHED STONE SUBGRADE ( 6")
2556.00 SQYD GEOSYNTHETIC REINFORCEMENT (FOR BASE)
426.00 CUYD COMMON EXCAVATION (BASE)
1.00 MGAL WATER (CRUSHED STONE SUBGRADE) (SET PRICE)
9305.00 TON HMA OVERLAY (SR-19A) (PG 64-22)
5710.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22)
25.00 TON EMULSIFIED ASPHALT (SS-1HP)
13560.00 TON MILLING
150.00 TON PAVEMENT EDGE WEDGE (ROCK)
1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE)
18980.00 LNFT PAVEMENT MARKING (EPOXY) (YELLOW) ( 4")
8286.00 LNFT PAVEMENT MARKING (EPOXY) (WHITE) ( 6")
52.00 LNFT PAVEMENT MARKING (EPOXY) (YELLOW) (12")
187.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
8.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW)
8.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW)
1308.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12")
628.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
653.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.)
434.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 30
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
5440.00 EADA CHANNELIZER (PORTABLE)
434.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY)
210.00 EADA ARROW DISPLAY
7.20 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT)
118.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT)
255.50 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT
6.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER)
1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY)
1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP)
3.00 EACH TWORKS SIGN ASSEMBLY (SMALL)
PROPOSAL NO: 513066675 STATE PROJECT NO: K014-078 KA 3323-01
WORKING DAYS: 25 COMPLETION DATE: DBE GOAL:
COUNTY: RENO
MILL & HMA OVERLAY
K-14:NICKERSON WCL W TO HODGE ROAD
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
2320.00 TON MILLING
6830.00 TON HMA OVERLAY (SR-12.5A) (PG 70-22)
1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT
1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT
18.00 TON EMULSIFIED ASPHALT (SS-1HP)
6830.00 TON QUALITY CONTROL TESTING (HMA)
570.00 TON PAVEMENT EDGE WEDGE (ROCK)
1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE)
1.00 EACH ASPHALT CORE (SET PRICE)
1.00 TON MATERIAL FOR HMA PATCHING (SET PRICE)
302.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE I TAPE OR PAINT)
302.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II TAPE OR PAINT
17623.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4")
61275.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
1006.00 LNFT PAVEMENT MARKING REMOVAL
PROPOSAL NO: 513066695 STATE PROJECT NO: K096-106 KA 3333-01
WORKING DAYS: 35 COMPLETION DATE: DBE GOAL:
COUNTY: SEDGWICK RENO C106
CONCRETE PAVEMENT PATCHING
K-96:KA 3334 0.5 MI N OF K-14 JCT E TO SG CO L,
1.00 LSUM MOBILIZATION
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 31
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
1222.00 SQYD PCCP PATCHING (FULL DEPTH) ( 9") (SOUND)
738.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH)
108.00 SQYD PCCP JOINT AND CRACK PATCHING (FULL DEPTH)
61.00 SQYD PCCP EDGE JOINT PATCHING (PARTIAL DEPTH)
5.00 SQYD PCCP EDGE JOINT PATCHING (FULL DEPTH)
12.00 LNFT EXPANSION JOINT (MEMBRANE SEALANT POLY-TITE)
121.00 SQYD PCCP PATCHING (FULL DEPTH) ( 9") (SOUND)
376.00 SQYD PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH)
68.00 SQYD PCCP JOINT AND CRACK PATCHING (FULL DEPTH)
17.00 SQYD PCCP EDGE JOINT PATCHING (PARTIAL DEPTH)
3.00 SQYD PCCP EDGE JOINT PATCHING (FULL DEPTH)
12.00 LNFT EXPANSION JOINT (MEMBRANE SEALANT POLY-TITE)
PROPOSAL NO: 513066715 STATE PROJECT NO: 087 KA 0480-01
WORKING DAYS: 55 COMPLETION DATE: DBE GOAL:
COUNTY: SEDGWICK
GRADE & SURFACING
DERBY: MADISON AVE FROM WATER ST EAST TO BUCKNER ST.
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C)
1.00 LSUM MOBILIZATION
1.00 CUYD FOUNDATION STABILIZATION (SET PRICE)
1.00 LSUM REMOVAL OF EXISTING STRUCTURES
1.00 LSUM CONTRACTOR CONSTRUCTION STAKING
1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)
1.00 HOUR FLAGGER (SET PRICE)
1.00 LSUM TRAFFIC CONTROL
1.00 LSUM CLEARING AND GRUBBING
1.00 LSUM TRANSPORTING SALVAGEABLE MATERIAL
516.00 CUYD ROCK EXCAVATION
376.00 CUYD COMMON EXCAVATION (URB)
6068.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED)
629.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5)
4168.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90)
2.00 EACH ADJUSTMENT OF MANHOLES
5.00 SQYD SIDEWALK CONSTRUCTION ( 4") (AE)
20.00 LNFT 4" PIPE UNDERDRAINS (H)
24.00 LNFT STORM SEWER (42")
141.00 LNFT STORM SEWER (36") (RCP)
128.00 LNFT STORM SEWER (30") (RCP)
171.00 LNFT STORM SEWER (18")
229.00 LNFT STORM SEWER (15") (RCP)
2.00 EACH INLET (TYPE 22 CURB)
1.00 EACH INLET (AREA)
1.00 EACH END SECTION ( 42")
2.00 EACH END SECTION ( 30") (RC)
1.00 EACH END SECTION ( 18")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 32
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
1.00 EACH END SECTION ( 15") (RC)
2.00 EACH MANHOLE (REINFORCED CONCRETE)
1.00 EACH MANHOLE (REINFORCED CONCRETE) (SPECIAL)
29.00 TON AGGREGATE DITCH LINING ( 6")
1.00 MGAL WATER (GRADING) (SET PRICE)
1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE)
4.10 CUYD CONCRETE (GRADE 4.0)
560.00 LBS. REINFORCING STEEL (GRADE 60)
2.00 EACH TWORKS SIGN ASSEMBLY (BLP)
1.00 EACH BARRICADE (TYPE III) (FIXED)
1.00 LSUM TEMPORARY SEEDING
1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE)
140.00 LNFT TEMPORARY DITCH CHECK
1.00 EACH TEMPORARY INLET SEDIMENT BARRIER
24.00 LNFT CURB INLET PROTECTION
1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE)
1.00 CUYD SEDIMENT REMOVAL (SET PRICE)
1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE)
2856.00 SQYD EROSION CONTROL (CLASS 1) (TYPE A)
1146.00 LNFT CURB AND GUTTER, COMBINED (AE)
79.00 LNFT CURB, EDGE ( 6.0") (AE) (SPECIAL)
64.00 LNFT CURB, EDGE ( 6.0") (AE) (SPECIAL)
632.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE)
146.00 SQYD CONCRETE PAVEMENT (12" VARIABLE) (AE)
27.00 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE)
1070.00 TON HMA-COMMERCIAL GRADE (CLASS A)
3256.00 SQYD CRUSHED STONE SUBGRADE ( 8")
324.00 SQYD CRUSHED STONE SUBGRADE ( 7")
3581.00 SQYD GEOSYNTHETIC REINFORCEMENT (FOR BASE)
1.00 MGAL WATER (CRUSHED STONE SUBGRADE) (SET PRICE)
1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
69.40 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE)
10.00 LNFT SIGN POST (2 LB/FT "U" STEEL)
107.00 LNFT SIGN POST (1-3/4" PERFORATED SQUARE STEEL TUBE)
11.00 EACH SIGN POST FOOTING ( 1-3/4" PERFORATED SQUARE STEEL TUBE)
1.00 LSUM SIGN (REMOVE AND RESET)
77.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6")
12.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8")
1328.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4")
108.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (X-ING)
1.00 LSUM SEEDING
277.00 SQYD SOD (TALL TURF TYPE FESCUE) (STRIPS)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 33
SUMMARY OF QUANTITIES DATE: 05/23/13
TIME: 11:09 AM
LETTING DATE: June 19, 2013
QUANTITY UNIT ITEM DESCRIPTION
----------------------------------------------------------------------------------------
PROPOSAL NO: 513066736 STATE PROJECT NO: U283-106 KA 3307-01
WORKING DAYS: 20 COMPLETION DATE: DBE GOAL:
COUNTY: CLARK NESS C106
ASPHALT CRACK REPAIR
KA 3309-01 1 MI N OF HG CO L N 4.971 MI
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
13964.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
47379.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
PROPOSAL NO: 513066756 STATE PROJECT NO: U050-028 KA 3302-01
WORKING DAYS: 30 COMPLETION DATE: DBE GOAL:
COUNTY: FINNEY
ASPHALT CRACK REPAIR
US-50: KE CO L E TO 4 LANE (PCCP)
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
174652.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
PROPOSAL NO: 513066776 STATE PROJECT NO: K023-106 KA 3303-01
WORKING DAYS: 100 COMPLETION DATE: DBE GOAL:
COUNTY: FINNEY LANE C106
ASPHALT CRACK REPAIR
K-23:KA 3304-01 K-156 JCT N TO LE CO L;
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
265026.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
482931.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
PROPOSAL NO: 513066796 STATE PROJECT NO: U054-060 KA 3306-01
WORKING DAYS: 25 COMPLETION DATE: DBE GOAL:
COUNTY: MEADE
ASPHALT CRACK REPAIR
US-54:PLAINS SCL E TO CA CO L (EXCEPT MEADE)
1.00 LSUM MOBILIZATION
1.00 LSUM TRAFFIC CONTROL
1.00 HOUR FLAGGER (SET PRICE)
125956.00 LNFT SEALING ASPHALT CRACKS (>1/8" <=1/2")
|