Kansas Department of Transportation "...to provide a statewide transportation system to meet the needs of Kansas."
    
Advanced Search
 

Bid Item List
Active Items Only

Spec Sect Item No. Unit Long Description Calculate To And Pay To Quantity

0821 012559 EACH ( 6") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012560 EACH ( 8") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012563 EACH ( 10") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012564 EACH ( 12") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012567 EACH ( 15") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 072106 LNFT ( 15'-9" X 15'-1") STRUCTURAL PLATE PIPE ARCH (10 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012570 EACH ( 18") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 023002 LNFT ( 19'-8" X 12'-8") STRUCTURAL PLATE PIPE ARCH ( 5 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012573 EACH ( 21") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012576 EACH ( 24") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012579 EACH ( 27") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 057307 LNFT ( 27'-9" X 20'-4") STRUCTURAL PLATE ARCH CALC. TO: 0.10, PAY TO: 1

0821 012582 EACH ( 30") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 072107 LNFT ( 32' X 3" X 22' X 2") STRUCTURAL PLATE PIPE (HE) ( 3 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012585 EACH ( 33") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012588 EACH ( 36") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 022890 LNFT ( 42" X 72") STRUCTURAL PLATE PIPE ARCH (10 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012591 EACH ( 42") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012613 EACH ( 48" X 48") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012594 EACH ( 48") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012597 EACH ( 54") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 022900 LNFT ( 56" X 76") STRUCTURAL PLATE PIPE ARCH (12 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012622 EACH ( 60" X 48") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012614 EACH ( 60" X 60") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012600 EACH ( 60") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012603 EACH ( 66") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 022910 LNFT ( 70" X 92") STRUCTURAL PLATE PIPE ARCH ( 8 GAUGE) CALC. TO: 0.10, PAY TO: 1

0734 022911 LNFT ( 70" X 92") STRUCTURAL PLATE PIPE ARCH (10 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012623 EACH ( 72" X 48") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012617 EACH ( 72" X 60") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012615 EACH ( 72" X 72") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012606 EACH ( 72") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 022800 LNFT ( 72") STRUCTURAL PLATE PIPE (10 GAUGE) CALC. TO: 0.10, PAY TO: 1

0734 022801 LNFT ( 72") STRUCTURAL PLATE PIPE (12 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012624 EACH ( 84" X 48") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 022930 LNFT ( 84" X 61") STRUCTURAL PLATE PIPE ARCH (12 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 060302 EACH ( 84") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 015481 LNFT ( 84") STRUCTURAL PLATE PIPE (10 GAUGE) CALC. TO: 0.10, PAY TO: 1

0734 015480 LNFT ( 84") STRUCTURAL PLATE PIPE (12 GAUGE) CALC. TO: 0.10, PAY TO: 1

0734 015485 LNFT ( 90") STRUCTURAL PLATE PIPE ( 8 GAUGE) CALC. TO: 0.10, PAY TO: 1

0821 012618 EACH ( 96" X 60") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012619 EACH ( 96" X 72") FLAPGATE CALC. TO: 1, PAY TO: 1

0821 012626 EACH ( 96" X 96") FLAPGATE CALC. TO: 1, PAY TO: 1

0734 071267 LNFT ( 96") STRUCTURAL PLATE PIPE ( 8 GAUGE) CALC. TO: 0.10, PAY TO: 1

0734 015490 LNFT (120") STRUCTURAL PLATE PIPE (10 GAUGE) CALC. TO: 0.10, PAY TO: 1

0734 022820 LNFT (156") STRUCTURAL PLATE PIPE (10 GAUGE) CALC. TO: 0.10, PAY TO: 1

0734 022830 LNFT (174") STRUCTURAL PLATE PIPE ( 8 GAUGE) CALC. TO: 0.10, PAY TO: 1

0822 061818 LNFT 10" PIPE UNDERDRAINS (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0822 061830 LNFT 12" PIPE UNDERDRAINS (AE) CALC. TO: 0.10, PAY TO: 1

0822 061814 LNFT 12" PIPE UNDERDRAINS (BH) CALC. TO: 0.10, PAY TO: 1

0822 011858 LNFT 12" PIPE UNDERDRAINS (E) CALC. TO: 0.10, PAY TO: 1

0822 061829 LNFT 12" PIPE UNDERDRAINS (EGK) CALC. TO: 0.10, PAY TO: 1

0822 061833 LNFT 12" PIPE UNDERDRAINS (F) CALC. TO: 0.10, PAY TO: 1

0822 061809 LNFT 12" PIPE UNDERDRAINS (G) CALC. TO: 0.10, PAY TO: 1

0822 071377 LNFT 12" PIPE UNDERDRAINS (H) CALC. TO: 0.10, PAY TO: 1

0822 061828 LNFT 12" PIPE UNDERDRAINS (HL) CALC. TO: 0.10, PAY TO: 1

0822 071378 LNFT 12" PIPE UNDERDRAINS (K) CALC. TO: 0.10, PAY TO: 1

0822 061723 LNFT 12" PIPE UNDERDRAINS (L) CALC. TO: 0.10, PAY TO: 1

0822 061847 LNFT 2" PIPE UNDERDRAINS (AEGK) CALC. TO: 0.10, PAY TO: 1

0822 061810 LNFT 3" PIPE UNDERDRAINS (K) CALC. TO: 0.10, PAY TO: 1

0822 061843 LNFT 4" PIPE UNDERDRAINS (A) CALC. TO: 0.10, PAY TO: 1

0822 061849 LNFT 4" PIPE UNDERDRAINS (AEGK) CALC. TO: 0.10, PAY TO: 1

0822 061799 LNFT 4" PIPE UNDERDRAINS (AG) CALC. TO: 0.10, PAY TO: 1

0822 061844 LNFT 4" PIPE UNDERDRAINS (B) CALC. TO: 0.10, PAY TO: 1

0822 061798 LNFT 4" PIPE UNDERDRAINS (BF) CALC. TO: 0.10, PAY TO: 1

0822 061801 LNFT 4" PIPE UNDERDRAINS (BFHL) CALC. TO: 0.10, PAY TO: 1

0822 061826 LNFT 4" PIPE UNDERDRAINS (BHL) CALC. TO: 0.10, PAY TO: 1

0822 082003 LNFT 4" PIPE UNDERDRAINS (BHL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0822 071027 LNFT 4" PIPE UNDERDRAINS (E) CALC. TO: 0.10, PAY TO: 1

0822 061845 LNFT 4" PIPE UNDERDRAINS (EK) CALC. TO: 0.10, PAY TO: 1

0822 061823 LNFT 4" PIPE UNDERDRAINS (F) CALC. TO: 0.10, PAY TO: 1

0822 061824 LNFT 4" PIPE UNDERDRAINS (G) CALC. TO: 0.10, PAY TO: 1

0822 061860 LNFT 4" PIPE UNDERDRAINS (H) CALC. TO: 0.10, PAY TO: 1

0822 061846 LNFT 4" PIPE UNDERDRAINS (HL) CALC. TO: 0.10, PAY TO: 1

0822 061861 LNFT 4" PIPE UNDERDRAINS (K) CALC. TO: 0.10, PAY TO: 1

0822 061811 LNFT 4" PIPE UNDERDRAINS (L) CALC. TO: 0.10, PAY TO: 1

0822 061841 LNFT 4" PIPE UNDERDRAINS (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0822 071493 LNFT 6" PIPE UNDERDRAINS (A) CALC. TO: 0.10, PAY TO: 1

0822 061858 LNFT 6" PIPE UNDERDRAINS (AEGK) CALC. TO: 0.10, PAY TO: 1

0822 061854 LNFT 6" PIPE UNDERDRAINS (AEGKM) CALC. TO: 0.10, PAY TO: 1

0822 061817 LNFT 6" PIPE UNDERDRAINS (AG) CALC. TO: 0.10, PAY TO: 1

0822 061831 LNFT 6" PIPE UNDERDRAINS (AGK) CALC. TO: 0.10, PAY TO: 1

0822 061803 LNFT 6" PIPE UNDERDRAINS (BDFHL) CALC. TO: 0.10, PAY TO: 1

0822 061856 LNFT 6" PIPE UNDERDRAINS (BDFHL) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0822 061816 LNFT 6" PIPE UNDERDRAINS (BF) CALC. TO: 0.10, PAY TO: 1

0822 061832 LNFT 6" PIPE UNDERDRAINS (BFH) CALC. TO: 0.10, PAY TO: 1

0822 061802 LNFT 6" PIPE UNDERDRAINS (BFHL) CALC. TO: 0.10, PAY TO: 1

0822 061806 LNFT 6" PIPE UNDERDRAINS (BHL) CALC. TO: 0.10, PAY TO: 1

0822 061827 LNFT 6" PIPE UNDERDRAINS (E) CALC. TO: 0.10, PAY TO: 1

0822 061866 LNFT 6" PIPE UNDERDRAINS (EK) CALC. TO: 0.10, PAY TO: 1

0822 061812 LNFT 6" PIPE UNDERDRAINS (F) CALC. TO: 0.10, PAY TO: 1

0822 061864 LNFT 6" PIPE UNDERDRAINS (FH) CALC. TO: 0.10, PAY TO: 1

0822 061862 LNFT 6" PIPE UNDERDRAINS (G) CALC. TO: 0.10, PAY TO: 1

0822 061865 LNFT 6" PIPE UNDERDRAINS (GK) CALC. TO: 0.10, PAY TO: 1

0822 061819 LNFT 6" PIPE UNDERDRAINS (H) CALC. TO: 0.10, PAY TO: 1

0822 061867 LNFT 6" PIPE UNDERDRAINS (HL) CALC. TO: 0.10, PAY TO: 1

0822 061821 LNFT 6" PIPE UNDERDRAINS (K) CALC. TO: 0.10, PAY TO: 1

0822 061822 LNFT 6" PIPE UNDERDRAINS (L) CALC. TO: 0.10, PAY TO: 1

0822 061863 LNFT 6" PIPE UNDERDRAINS (POLYETHYLENE) CALC. TO: 0.10, PAY TO: 1

0822 061813 LNFT 8" PIPE UNDERDRAINS (F) CALC. TO: 0.10, PAY TO: 1

0822 061808 LNFT 8" PIPE UNDERDRAINS (G) CALC. TO: 0.10, PAY TO: 1

0822 061796 LNFT 8" PIPE UNDERDRAINS (H) CALC. TO: 0.10, PAY TO: 1

0822 071429 LNFT 8" PIPE UNDERDRAINS (K) CALC. TO: 0.10, PAY TO: 1

0725 014184 SQYD ABUTMENT STRIP DRAIN CALC. TO: 0.10, PAY TO: 1

0816 012700 EACH ADJUSTMENT OF CATCH BASINS CALC. TO: 1, PAY TO: 1

0816 012705 EACH ADJUSTMENT OF CURB INLETS CALC. TO: 1, PAY TO: 1

0800 016352 LS ADJUSTMENT OF EXISTING STRUCTURES CALC. TO: 1, PAY TO: 1

0809 012780 EACH ADJUSTMENT OF MANHOLE CALC. TO: 1, PAY TO: 1

0800 070643 EACH ADJUSTMENT OF METER BOX (WATER) CALC. TO: 1, PAY TO: 1

0800 071294 EACH ADJUSTMENT OF VALVE BOX (GAS) CALC. TO: 1, PAY TO: 1

0800 070644 EACH ADJUSTMENT OF VALVE BOX (WATER) CALC. TO: 1, PAY TO: 1

0831 072393 TON AGGREGATE BACKSLOPE DITCH LINING CALC. TO: 0.10, PAY TO: 1

0305 010177 SQYD AGGREGATE BASE (AB-1) ( 4") CALC. TO: 0.10, PAY TO: 1

0305 010175 SQYD AGGREGATE BASE (AB-1) ( 6") CALC. TO: 0.10, PAY TO: 1

0305 010181 SQYD AGGREGATE BASE (AB-1) ( 8") CALC. TO: 0.10, PAY TO: 1

0305 010180 SQYD AGGREGATE BASE (AB-1) (12") CALC. TO: 0.10, PAY TO: 1

0305 010179 SQYD AGGREGATE BASE (AB-2) ( 6") CALC. TO: 0.10, PAY TO: 1

0305 010176 SQYD AGGREGATE BASE (AB-3) ( 2") CALC. TO: 0.10, PAY TO: 1

0305 010178 SQYD AGGREGATE BASE (AB-3) ( 3") CALC. TO: 0.10, PAY TO: 1

0305 010171 SQYD AGGREGATE BASE (AB-3) ( 4") CALC. TO: 0.10, PAY TO: 1

0305 010182 SQYD AGGREGATE BASE (AB-3) ( 5.5") CALC. TO: 0.10, PAY TO: 1

0305 010169 SQYD AGGREGATE BASE (AB-3) ( 6") CALC. TO: 0.10, PAY TO: 1

0305 011071 SQYD AGGREGATE BASE (AB-3) ( 7") CALC. TO: 0.10, PAY TO: 1

0305 010173 SQYD AGGREGATE BASE (AB-3) ( 8") CALC. TO: 0.10, PAY TO: 1

0305 011486 SQYD AGGREGATE BASE (AB-3) ( 9") CALC. TO: 0.10, PAY TO: 1

0305 010170 SQYD AGGREGATE BASE (AB-3) (10") CALC. TO: 0.10, PAY TO: 1

0305 010172 SQYD AGGREGATE BASE (AB-3) (12") CALC. TO: 0.10, PAY TO: 1

0305 011421 SQYD AGGREGATE BASE (AB-3) (14") CALC. TO: 0.10, PAY TO: 1

0305 010183 SQYD AGGREGATE BASE (AB-3) (16") CALC. TO: 0.10, PAY TO: 1

0305 011483 SQYD AGGREGATE BASE (AB-3) (18") CALC. TO: 0.10, PAY TO: 1

0305 030502 SQYD AGGREGATE BASE (RECLAIMED CRUSHED PCCP) ( 6") CALC. TO: 0.10, PAY TO: 1

0305 010184 SQYD AGGREGATE BASE (SPECIAL) (6") CALC. TO: 0.10, PAY TO: 1

0831 012759 TON AGGREGATE DITCH LINING ( 2") CALC. TO: 0.10, PAY TO: 1

0831 012758 TON AGGREGATE DITCH LINING ( 3") CALC. TO: 0.10, PAY TO: 1

0831 080418 TON AGGREGATE DITCH LINING ( 4") CALC. TO: 0.10, PAY TO: 1

0831 012752 TON AGGREGATE DITCH LINING ( 5") CALC. TO: 0.10, PAY TO: 1

0831 080321 TON AGGREGATE DITCH LINING ( 6") CALC. TO: 0.10, PAY TO: 1

0831 012768 TON AGGREGATE DITCH LINING ( 8") CALC. TO: 0.10, PAY TO: 1

0831 080972 TON AGGREGATE DITCH LINING (12") CALC. TO: 0.10, PAY TO: 1

0831 072210 TON AGGREGATE DITCH LINING (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0614 010187 TON AGGREGATE FOR ASPHALT BASE COURSE (BM-1B) CALC. TO: 0.10, PAY TO: 1

0614 080196 TON AGGREGATE FOR ASPHALT BASE COURSE (BM-2) CALC. TO: 0.10, PAY TO: 1

0614 080063 TON AGGREGATE FOR ASPHALT BASE COURSE (BM-2A) CALC. TO: 0.10, PAY TO: 1

0614 080057 TON AGGREGATE FOR ASPHALT BASE COURSE (BM-2B) CALC. TO: 0.10, PAY TO: 1

0600 080068 TON AGGREGATE FOR ASPHALT MIXTURE (BM-1) CALC. TO: 0.10, PAY TO: 1

0614 080457 TON AGGREGATE FOR ASPHALT SURFACE COURSE (BM-1T) CALC. TO: 0.10, PAY TO: 1

0614 080451 TON AGGREGATE FOR ASPHALT SURFACE COURSE (BM-2) CALC. TO: 0.10, PAY TO: 1

0614 080458 TON AGGREGATE FOR ASPHALT SURFACE COURSE (BM-2A) CALC. TO: 0.10, PAY TO: 1

0822 011615 TON AGGREGATE FOR BLANKET UNDERDRAINS CALC. TO: 0.10, PAY TO: 1

0822 011600 CUYD AGGREGATE FOR BLANKET UNDERDRAINS CALC. TO: 0.10, PAY TO: 1

0606 070664 TON AGGREGATE FOR MICROSURFACING CALC. TO: 0.10, PAY TO: 1

0700 022799 TON AGGREGATE FOR RAMMED AGGREGATE PIER CALC. TO: 0.10, PAY TO: 1

0837 010637 TON AGGREGATE FOR SHOULDERS (AS-1) CALC. TO: 0.10, PAY TO: 1

0301 016315 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (CRUSHED CONCRETE PVMT) CALC. TO: 0.10, PAY TO: 1

0301 011024 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (MILLINGS) CALC. TO: 0.10, PAY TO: 1

0301 011025 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SR- 1) CALC. TO: 0.10, PAY TO: 1

0301 011027 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SR- 3) CALC. TO: 0.10, PAY TO: 1

0301 011028 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SR- 4) CALC. TO: 0.10, PAY TO: 1

0301 011031 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SR- 7) CALC. TO: 0.10, PAY TO: 1

0301 011032 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SR- 8) CALC. TO: 0.10, PAY TO: 1

0301 011077 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS- 3) CALC. TO: 0.10, PAY TO: 1

0301 011079 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS- 5) CALC. TO: 0.10, PAY TO: 1

0301 011094 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS- 7 OR SS-8) CALC. TO: 0.10, PAY TO: 1

0301 011081 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS- 7) CALC. TO: 0.10, PAY TO: 1

0301 011093 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS- 8 OR SS-9) CALC. TO: 0.10, PAY TO: 1

0301 011082 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS- 8) CALC. TO: 0.10, PAY TO: 1

0301 011083 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS- 9) CALC. TO: 0.10, PAY TO: 1

0301 011084 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS-10) CALC. TO: 0.10, PAY TO: 1

0301 011088 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (SS-14) CALC. TO: 0.10, PAY TO: 1

0109 000014 LS AGGREGATE PRICE ADJUSTMENT CALC. TO: 1, PAY TO: 1

0305 013522 SQYD AGGREGATE SHOULDER (AB-1) ( 6") CALC. TO: 0.10, PAY TO: 1

0305 013556 SQYD AGGREGATE SHOULDER (AB-3) ( 6") CALC. TO: 0.10, PAY TO: 1

0305 013543 SQYD AGGREGATE SHOULDER (AB-3) ( 9") CALC. TO: 0.10, PAY TO: 1

0305 013535 SQYD AGGREGATE SHOULDER (AS-1) ( 4") CALC. TO: 0.10, PAY TO: 1

0305 013576 SQYD AGGREGATE SHOULDER (AS-1) ( 5") CALC. TO: 0.10, PAY TO: 1

0305 013573 SQYD AGGREGATE SHOULDER (AS-1) ( 6") CALC. TO: 0.10, PAY TO: 1

0305 082082 SQYD AGGREGATE SHOULDER (AS-1) ( 8") CALC. TO: 0.10, PAY TO: 1

0305 013533 SQYD AGGREGATE SHOULDER (AS-1) ( 9") CALC. TO: 0.10, PAY TO: 1

0305 038060 SQYD AGGREGATE SHOULDER (AS-1) (11") CALC. TO: 0.10, PAY TO: 1

0902 080320 TON AGRICULTURAL LIMESTONE CALC. TO: 0.10, PAY TO: 1

0731 025522 SQYD AREA PREPARED FOR PATCHING CALC. TO: 0.10, PAY TO: 1

0731 025524 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) CALC. TO: 0.10, PAY TO: 1

0731 025510 SQYD AREA PREPARED FOR PATCHING (POURED WITH OVERLAY) CALC. TO: 0.10, PAY TO: 1

0805 025364 EADA ARROW DISPLAY CALC. TO: 1, PAY TO: 10

0600 000030 LS ASPHALT AIR VOID PAY ADJUSTMENT CALC. TO: 1, PAY TO: 1

0600 000048 LS ASPHALT BINDER PAY ADJUSTMENT CALC. TO: 1, PAY TO: 1

0600 013250 TON ASPHALT CEMENT (AC-10-2TR) CALC. TO: 0.10, PAY TO: 1

0600 013251 TON ASPHALT CEMENT (AC-10-XP) CALC. TO: 0.10, PAY TO: 1

0600 012038 TON ASPHALT CEMENT (AC-15-5TR) CALC. TO: 0.10, PAY TO: 1

0600 013347 TON ASPHALT CEMENT (AC-20-5TR) CALC. TO: 0.10, PAY TO: 1

0600 013341 TON ASPHALT CEMENT (AC-20-XP) CALC. TO: 0.10, PAY TO: 1

0600 086601 TON ASPHALT CEMENT (PG 52-28) CALC. TO: 0.10, PAY TO: 1

0600 086606 TON ASPHALT CEMENT (PG 52-34) CALC. TO: 0.10, PAY TO: 1

0600 086602 TON ASPHALT CEMENT (PG 58-22) CALC. TO: 0.10, PAY TO: 1

0600 086598 TON ASPHALT CEMENT (PG 58-28) CALC. TO: 0.10, PAY TO: 1

0600 036607 TON ASPHALT CEMENT (PG 58-34) CALC. TO: 0.10, PAY TO: 1

0600 086603 TON ASPHALT CEMENT (PG 64-16) CALC. TO: 0.10, PAY TO: 1

0600 086604 TON ASPHALT CEMENT (PG 64-22) CALC. TO: 0.10, PAY TO: 1

0600 086605 TON ASPHALT CEMENT (PG 64-28) CALC. TO: 0.10, PAY TO: 1

0600 081693 TON ASPHALT CEMENT (PG 64-34) CALC. TO: 0.10, PAY TO: 1

0600 072304 TON ASPHALT CEMENT (PG 70-16) CALC. TO: 0.10, PAY TO: 1

0600 082150 TON ASPHALT CEMENT (PG 70-22) CALC. TO: 0.10, PAY TO: 1

0600 081135 TON ASPHALT CEMENT (PG 70-28) CALC. TO: 0.10, PAY TO: 1

0600 072169 TON ASPHALT CEMENT (PG 76-22) CALC. TO: 0.10, PAY TO: 1

0600 072272 TON ASPHALT CEMENT (PG 76-28) CALC. TO: 0.10, PAY TO: 1

0600 011750 EACH ASPHALT CORE (SET PRICE) CALC. TO: 1, PAY TO: 1

0600 000029 LS ASPHALT DENSITY PAY ADJUSTMENT CALC. TO: 1, PAY TO: 1

0600 000040 LS ASPHALT PAVEMENT AREA PAY ADJUSTMENT CALC. TO: 1, PAY TO: 1

0833 013353 TON ASPHALT PAVEMENT PATCHING OF PCCP CALC. TO: 0.10, PAY TO: 1

0603 000013 LS ASPHALT PAVEMENT SMOOTHNESS CALC. TO: 1, PAY TO: 1

0600 000027 LS ASPHALT PAVEMENT THICKNESS ADJUSTMENT CALC. TO: 1, PAY TO: 1

0600 000005 LS ASPHALT PRICE ADJUSTMENT CALC. TO: 1, PAY TO: 1

0605 083220 TON ASPHALT REJUVENATING AGENT CALC. TO: 0.10, PAY TO: 1

0602 013826 SQYD ASPHALT TREATED BASE CALC. TO: 0.10, PAY TO: 1

0805 026075 EACH BARRICADE (TYPE III) (FIXED) CALC. TO: 1, PAY TO: 1

0706 070383 EACH BEARING (DISC) CALC. TO: 1, PAY TO: 1

0706 012257 EACH BEARING (ELASTOMERIC) ( 1 1/8") CALC. TO: 1, PAY TO: 1

0706 012258 EACH BEARING (ELASTOMERIC) ( 3 1/2") CALC. TO: 1, PAY TO: 1

0706 012259 EACH BEARING (ELASTOMERIC) ( 3") CALC. TO: 1, PAY TO: 1

0706 012268 EACH BEARING (ELASTOMERIC) (17.5" X 17.5") CALC. TO: 1, PAY TO: 1

0706 012247 EACH BEARING (EXPANSION) CALC. TO: 1, PAY TO: 1

0706 013745 EACH BEARING (POT) CALC. TO: 1, PAY TO: 1

0706 071225 EACH BEARING (POT) (10" X 14" X 4") CALC. TO: 1, PAY TO: 1

0706 071229 EACH BEARING (POT) (12" X 12" X 3.5") CALC. TO: 1, PAY TO: 1

0706 071226 EACH BEARING (POT) (12" X 15" X 4.5") CALC. TO: 1, PAY TO: 1

0706 071227 EACH BEARING (POT) (16" X 20" X 5") CALC. TO: 1, PAY TO: 1

0706 071228 EACH BEARING (POT) (18" X 18" X 4") CALC. TO: 1, PAY TO: 1

0706 012260 EACH BEARING (SPHERICAL) CALC. TO: 1, PAY TO: 1

0706 070869 EACH BEARING (STEEL REINFORCED ELASTOMERIC) CALC. TO: 1, PAY TO: 1

0706 013516 EACH BEARING (STEEL REINFORCED ELASTOMERIC) ( 4" X 14.4" X 27.6") CALC. TO: 1, PAY TO: 1

0706 013515 EACH BEARING (STEEL REINFORCED ELASTOMERIC) ( 6.7" X 26" X 27.6") CALC. TO: 1, PAY TO: 1

0706 070891 EACH BEARING (STEEL REINFORCED ELASTOMERIC) ( 9" X 1'-3") CALC. TO: 1, PAY TO: 1

0706 070890 EACH BEARING (STEEL REINFORCED ELASTOMERIC) (1'-0" X 1'-3") CALC. TO: 1, PAY TO: 1

0706 070892 EACH BEARING (STEEL REINFORCED ELASTOMERIC) (15" X 15") CALC. TO: 1, PAY TO: 1

0706 070897 EACH BEARING (STEEL REINFORCED ELASTOMERIC) (23" X 12") CALC. TO: 1, PAY TO: 1

0706 070899 EACH BEARING (STEEL REINFORCED ELASTOMERIC) (25" X 24") CALC. TO: 1, PAY TO: 1

0706 070898 EACH BEARING (STEEL REINFORCED ELASTOMERIC) (28" X 24") CALC. TO: 1, PAY TO: 1

0706 012242 EACH BEARING (STEEL) CALC. TO: 1, PAY TO: 1

0706 070683 EACH BEARING (TFE/ELASTOMERIC) CALC. TO: 1, PAY TO: 1

0706 012264 EACH BEARING (TFE/ELASTOMERIC) ( 9.17" X 12.0") CALC. TO: 1, PAY TO: 1

0706 012265 EACH BEARING (TFE/ELASTOMERIC) (14.7" X 14.7") CALC. TO: 1, PAY TO: 1

0706 012266 EACH BEARING (TFE/ELASTOMERIC) (17.5" X 17.5") CALC. TO: 1, PAY TO: 1

0706 012267 EACH BEARING (TFE/ELASTOMERIC) (20.0" X 20.0") CALC. TO: 1, PAY TO: 1

0830 070982 CUYD BEDDING FOR SLOPE PROTECTION CALC. TO: 1, PAY TO: 1

0911 030036 EACH BENCH CALC. TO: 1, PAY TO: 1

0800 070924 EACH BIORETENTION CELL (L1) CALC. TO: 1, PAY TO: 1

0800 070925 EACH BIORETENTION CELL (L2) CALC. TO: 1, PAY TO: 1

0702 014202 LNFT BLACK CORRUGATED METAL SHEET PILING CALC. TO: 0.10, PAY TO: 1

0604 010858 CUYD BLOTTER SAND CALC. TO: 1, PAY TO: 1

0604 010863 CUYD BLOTTER SAND (SET PRICE) CALC. TO: 1, PAY TO: 1

0800 071439 EACH BOLLARD (PERMANENT) CALC. TO: 1, PAY TO: 1

0602 000051 LS BOND STRENGTH ADJUSTMENT CALC. TO: 1, PAY TO: 1

0504 013499 SQYD BONDED CONCRETE PAVEMENT ( 2" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0504 072379 SQYD BONDED CONCRETE PAVEMENT ( 3" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0504 013495 CUYD BONDED CONCRETE PAVEMENT ( 4" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0504 013498 CUYD BONDED CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0504 013496 SQYD BONDED CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0800 025509 CUYD BRIDGE APPROACH SLAB FOOTING CALC. TO: 0.10, PAY TO: 0.1

0724 071021 SQYD BRIDGE BACKWALL PROTECTION SYSTEM CALC. TO: 0.10, PAY TO: 1

0728 014290 LNFT BRIDGE CURB REPAIR CALC. TO: 0.10, PAY TO: 1

0700 070994 EACH BRIDGE DECK DRAIN EXTENSION CALC. TO: 1, PAY TO: 1

0710 013333 SQYD BRIDGE DECK GROOVING CALC. TO: 0.10, PAY TO: 1

0717 025545 SQYD BRIDGE DECK OVERLAY CALC. TO: 0.10, PAY TO: 1

0717 071795 CUYD BRIDGE DECK OVERLAY MATERIAL (SET PRICE) CALC. TO: 0.10, PAY TO: 1

0700 014045 LBS. BRIDGE DRAINAGE SYSTEM CALC. TO: 0.10, PAY TO: 1

0700 014241 LS BRIDGE DRAINAGE SYSTEM CALC. TO: 1, PAY TO: 1

0712 070920 LS BRIDGE DRAINAGE SYSTEM (FIBERGLASS) CALC. TO: 1, PAY TO: 1

0712 070921 LS BRIDGE DRAINAGE SYSTEM (STEEL) CALC. TO: 1, PAY TO: 1

0721 023999 LNFT BRIDGE HANDRAIL CALC. TO: 0.10, PAY TO: 1

0721 024010 LNFT BRIDGE HANDRAIL (ALUMINUM) CALC. TO: 0.10, PAY TO: 1

0721 071743 LNFT BRIDGE HANDRAIL (METAL) (0'- 6") CALC. TO: 0.10, PAY TO: 1

0721 070467 LNFT BRIDGE HANDRAIL (METAL) (0'-10") CALC. TO: 0.10, PAY TO: 1

0721 023996 LNFT BRIDGE HANDRAIL (METAL) (1'- 0") CALC. TO: 0.10, PAY TO: 1

0721 071799 LNFT BRIDGE HANDRAIL (METAL) (1'- 4") CALC. TO: 0.10, PAY TO: 1

0721 071162 LNFT BRIDGE HANDRAIL (METAL) (1'-10") CALC. TO: 0.10, PAY TO: 1

0721 070737 LNFT BRIDGE HANDRAIL (METAL) (2'- 0") CALC. TO: 0.10, PAY TO: 1

0721 071247 LNFT BRIDGE HANDRAIL (METAL) (2'- 4") CALC. TO: 0.10, PAY TO: 1

0721 023995 LNFT BRIDGE HANDRAIL (METAL) (3'- 6") CALC. TO: 0.10, PAY TO: 1

0721 070686 LNFT BRIDGE HANDRAIL (METAL) (4'- 6") CALC. TO: 0.10, PAY TO: 1

0721 070736 LNFT BRIDGE HANDRAIL (METAL) (6'- 0") CALC. TO: 0.10, PAY TO: 1

0721 024022 LNFT BRIDGE HANDRAIL (WOODEN) CALC. TO: 0.10, PAY TO: 1

0722 027101 EACH BRIDGE MOUNTED SIGN ATTACHMENT (10.1'-15.0') (STEEL) CALC. TO: 1, PAY TO: 1

0722 070430 EACH BRIDGE MOUNTED SIGN ATTACHMENT (11'-0") (STEEL) CALC. TO: 1, PAY TO: 1

0722 027126 EACH BRIDGE MOUNTED SIGN ATTACHMENT (15.1'-20.0') (STEEL) CALC. TO: 1, PAY TO: 1

0722 027102 EACH BRIDGE MOUNTED SIGN ATTACHMENT (25.1'-30.0') (STEEL) CALC. TO: 1, PAY TO: 1

0714 071510 LS BRIDGE PAINTING (AL EPOXY MASTIC W/ ACRYLIC OR POLYURETHANE SYS) CALC. TO: 1, PAY TO: 1

0714 014411 LS BRIDGE PAINTING (CALCIUM SULFONATE / ALKYD SYSTEM) CALC. TO: 1, PAY TO: 1

0714 071509 LS BRIDGE PAINTING (INORGANIC ZINC W/ ACRYLIC SYSTEM) CALC. TO: 1, PAY TO: 1

0714 072364 LS BRIDGE PAINTING (MOISTURE-CURE URETHANE SYSTEM) CALC. TO: 1, PAY TO: 1

0714 014403 LS BRIDGE PAINTING (ORGANIC ZINC VINYL SYSTEM) CALC. TO: 1, PAY TO: 1

0714 071495 LS BRIDGE PAINTING (ORGANIC ZINC W/ ACRYLIC SYSTEM) CALC. TO: 1, PAY TO: 1

0714 070280 LS BRIDGE PAINTING (SPECIAL) CALC. TO: 1, PAY TO: 1

0700 012468 EACH BRIDGE PROJECT MARKER CALC. TO: 1, PAY TO: 1

0727 014260 LS BRIDGE REPAIR CALC. TO: 1, PAY TO: 1

0722 016334 EACH BUTTERFLY OVERHEAD SIGN STRUCTURE (10.1'-15.0') (STEEL) CALC. TO: 1, PAY TO: 1

0722 026905 EACH BUTTERFLY OVERHEAD SIGN STRUCTURE (15.1'-20.0') (STEEL) CALC. TO: 1, PAY TO: 1

0301 081800 TON CALCIUM CHLORIDE CALC. TO: 0.10, PAY TO: 1

0722 026248 EACH CANTILEVER SIGN STRUCTURE (20.1'-25.0') (STEEL) CALC. TO: 1, PAY TO: 1

0722 026252 EACH CANTILEVER SIGN STRUCTURE (25.1'-30.0') (STEEL) CALC. TO: 1, PAY TO: 1

0722 026272 EACH CANTILEVER SIGN STRUCTURE (30.1'-35.0') (STEEL) CALC. TO: 1, PAY TO: 1

0722 026201 EACH CANTILEVER SIGN STRUCTURE (35.1'-40.0') (ALUMINUM OR STEEL) CALC. TO: 1, PAY TO: 1

0722 026203 EACH CANTILEVER SIGN STRUCTURE (35.1'-40.0') (STEEL) CALC. TO: 1, PAY TO: 1

0704 014094 EACH CAST STEEL PILE POINTS CALC. TO: 1, PAY TO: 1

0815 012880 EACH CATCH BASIN CALC. TO: 1, PAY TO: 1

0800 025521 EACH CATTLEGUARD UNIT CALC. TO: 1, PAY TO: 1

0301 081821 TON CEMENT CALC. TO: 0.10, PAY TO: 1

0800 081823 TON CEMENT (MUDJACKING) CALC. TO: 0.10, PAY TO: 1

0306 025177 SQYD CEMENT TREATED BASE CALC. TO: 0.10, PAY TO: 1

0306 000038 LS CEMENT TREATED BASE COMPRESSIVE STRENGTH PAY ADJUSTMENT CALC. TO: 1, PAY TO: 1

0805 011491 EADA CHANNELIZER (FIXED) CALC. TO: 1, PAY TO: 10

0805 011492 EADA CHANNELIZER (PORTABLE) CALC. TO: 1, PAY TO: 10

0100 000018 LS CLAIMS SETTLEMENT CALC. TO: 1, PAY TO: 1

0204 012400 CUYD CLASS I EXCAVATION CALC. TO: 0.10, PAY TO: 1

0204 012401 CUYD CLASS II EXCAVATION CALC. TO: 0.10, PAY TO: 1

0204 012402 CUYD CLASS III EXCAVATION CALC. TO: 0.10, PAY TO: 1

0204 012404 CUYD CLASS III EXCAVATION (MISC) CALC. TO: 0.10, PAY TO: 1

0204 012403 CUYD CLASS III EXCAVATION (RCB) CALC. TO: 0.10, PAY TO: 1

0845 060359 LS CLEANING EXISTING STRUCTURE CALC. TO: 1, PAY TO: 1

0201 025361 LS CLEARING AND GRUBBING CALC. TO: 1, PAY TO: 1

0604 012953 STA. COLD RECYCLED ASPHALT MATERIAL CALC. TO: 0.01, PAY TO: 0.1

0911 030021 EACH COMFORT STATION (MODIFICATION) CALC. TO: 1, PAY TO: 1

0205 012413 CUYD COMMON EXCAVATION (BASE) CALC. TO: 1, PAY TO: 1

0205 012415 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) CALC. TO: 1, PAY TO: 1

0205 012411 CUYD COMMON EXCAVATION (RURAL LARGE) CALC. TO: 1, PAY TO: 1

0205 012410 CUYD COMMON EXCAVATION (RURAL SMALL) CALC. TO: 1, PAY TO: 1

0205 000042 CUYD COMMON EXCAVATION (UNSTABLE) CALC. TO: 1, PAY TO: 1

0205 000041 CUYD COMMON EXCAVATION (UNSUITABLE) CALC. TO: 1, PAY TO: 1

0205 012412 CUYD COMMON EXCAVATION (URB) CALC. TO: 1, PAY TO: 1

0205 012316 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-0-5) CALC. TO: 1, PAY TO: 1

0205 012333 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-3-3) CALC. TO: 1, PAY TO: 1

0205 012152 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-0) CALC. TO: 1, PAY TO: 1

0205 012317 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) CALC. TO: 1, PAY TO: 1

0205 012328 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-90) CALC. TO: 1, PAY TO: 1

0205 012314 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-0-5) CALC. TO: 1, PAY TO: 1

0205 012336 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-3-3) CALC. TO: 1, PAY TO: 1

0205 012315 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-5-5) CALC. TO: 1, PAY TO: 1

0205 012332 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) CALC. TO: 1, PAY TO: 1

0205 012308 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-3) CALC. TO: 0.10, PAY TO: 1

0205 012318 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) CALC. TO: 1, PAY TO: 1

0205 012310 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-1-3) CALC. TO: 0.10, PAY TO: 1

0205 012309 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-2-2) CALC. TO: 0.10, PAY TO: 1

0205 012334 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-3-3) CALC. TO: 1, PAY TO: 1

0205 012153 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-0) CALC. TO: 1, PAY TO: 1

0205 012319 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) CALC. TO: 1, PAY TO: 1

0205 012323 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-90) CALC. TO: 1, PAY TO: 1

0205 071000 CUYD COMPACTION OF EARTHWORK (TYPE AAA) (MR-0-5) CALC. TO: 1, PAY TO: 1

0205 012326 CUYD COMPACTION OF EARTHWORK (TYPE AAA) (MR-3-3) CALC. TO: 1, PAY TO: 1

0710 012069 CUYD CONCRETE (COMMERCIAL GRADE) CALC. TO: 0.10, PAY TO: 0.1

0710 012072 CUYD CONCRETE (COMMERCIAL GRADE) (AE) CALC. TO: 0.10, PAY TO: 0.1

0710 013293 CUYD CONCRETE (GRADE 2.5) CALC. TO: 0.10, PAY TO: 0.1

0710 013397 CUYD CONCRETE (GRADE 3.0) CALC. TO: 0.10, PAY TO: 0.1

0710 013398 CUYD CONCRETE (GRADE 3.0) (AE) CALC. TO: 0.10, PAY TO: 0.1

0710 023455 CUYD CONCRETE (GRADE 3.0) (AE) (AI) CALC. TO: 0.10, PAY TO: 0.1

0710 013392 CUYD CONCRETE (GRADE 3.5) (AE) CALC. TO: 0.10, PAY TO: 0.1

0710 030079 CUYD CONCRETE (GRADE 3.5) (AE) (LOW CRACKING-HIGH PERFORMANCE) CALC. TO: 0.10, PAY TO: 0.1

0710 011919 CUYD CONCRETE (GRADE 4.0) CALC. TO: 0.10, PAY TO: 0.1

0710 072350 CUYD CONCRETE (GRADE 4.0) (AE) CALC. TO: 0.10, PAY TO: 0.1

0710 023461 CUYD CONCRETE (GRADE 4.0) (AE) (AI) CALC. TO: 0.10, PAY TO: 0.1

0710 013911 CUYD CONCRETE (GRADE 4.0) (AE) (LIGHTWEIGHT AGGREGATE) CALC. TO: 0.10, PAY TO: 0.1

0710 011960 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR) CALC. TO: 0.10, PAY TO: 0.1

0710 011899 CUYD CONCRETE (GRADE 4.0) (AE) (RCB) CALC. TO: 0.10, PAY TO: 0.1

0710 032813 CUYD CONCRETE (GRADE 4.0) (AE) (SA) CALC. TO: 0.10, PAY TO: 0.1

0710 012073 CUYD CONCRETE (GRADE 4.0) (AE) (SW) CALC. TO: 0.10, PAY TO: 0.1

0710 011990 CUYD CONCRETE (GRADE 4.0) (RCB BR) CALC. TO: 0.10, PAY TO: 0.1

0710 012083 CUYD CONCRETE (GRADE 4.0) (RCB) CALC. TO: 0.10, PAY TO: 0.1

0710 013390 CUYD CONCRETE (GRADE 4.5) CALC. TO: 0.10, PAY TO: 0.1

0710 013389 CUYD CONCRETE (GRADE 4.5) (AE) CALC. TO: 0.10, PAY TO: 0.1

0710 013388 CUYD CONCRETE (GRADE 4.5) (AE) (AI) CALC. TO: 0.10, PAY TO: 0.1

0710 013387 CUYD CONCRETE (GRADE 4.5) (AE) (SA) CALC. TO: 0.10, PAY TO: 0.1

0710 013385 CUYD CONCRETE (GRADE 4.5) (AE) (SF) (SA) CALC. TO: 0.10, PAY TO: 0.1

0710 013386 CUYD CONCRETE (GRADE 4.5) (AE) (SW) CALC. TO: 0.10, PAY TO: 0.1

0710 030437 CUYD CONCRETE (GRADE 5.0) CALC. TO: 0.10, PAY TO: 0.1

0701 072038 CUYD CONCRETE (GRADE 5.0) (AE) CALC. TO: 0.10, PAY TO: 0.1

0710 011972 CUYD CONCRETE (GRADE 5.0) (AE) (SA) CALC. TO: 0.10, PAY TO: 0.1

0710 072039 CUYD CONCRETE (GRADE 5.0) (AE) (SW) CALC. TO: 0.10, PAY TO: 0.1

0710 013599 CUYD CONCRETE (GRADE 6.0) (AE) (SA) CALC. TO: 0.01, PAY TO: 0.1

0831 012756 SQYD CONCRETE BACKSLOPE DITCH LINING CALC. TO: 0.10, PAY TO: 1

0501 011748 EACH CONCRETE CORE (SET PRICE) CALC. TO: 1, PAY TO: 1

0831 012750 SQYD CONCRETE DITCH LINING CALC. TO: 0.10, PAY TO: 1

0204 071554 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) CALC. TO: 1, PAY TO: 1

0817 012896 EACH CONCRETE HEADWALL CALC. TO: 1, PAY TO: 1

0726 071592 SQYD CONCRETE MASONRY COATING CALC. TO: 0.10, PAY TO: 1

0800 057197 SQYD CONCRETE MOW STRIP CALC. TO: 0.10, PAY TO: 1

0800 061415 EACH CONCRETE PARKING BLOCK CALC. TO: 1, PAY TO: 1

0500 013500 SQYD CONCRETE PAVEMENT ( 4" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013501 SQYD CONCRETE PAVEMENT ( 4" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013511 SQYD CONCRETE PAVEMENT ( 4" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013510 SQYD CONCRETE PAVEMENT ( 4" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013520 SQYD CONCRETE PAVEMENT ( 5" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013521 SQYD CONCRETE PAVEMENT ( 5" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013530 SQYD CONCRETE PAVEMENT ( 5" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013540 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013541 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070451 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013551 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013550 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013558 SQYD CONCRETE PAVEMENT ( 6" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013560 SQYD CONCRETE PAVEMENT ( 7" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013561 SQYD CONCRETE PAVEMENT ( 7" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013562 SQYD CONCRETE PAVEMENT ( 7" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013571 SQYD CONCRETE PAVEMENT ( 7" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013570 SQYD CONCRETE PAVEMENT ( 7" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013563 SQYD CONCRETE PAVEMENT ( 7" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013580 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013581 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070446 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013591 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013590 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013586 SQYD CONCRETE PAVEMENT ( 8" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 071999 SQYD CONCRETE PAVEMENT ( 8.5" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 071265 SQYD CONCRETE PAVEMENT ( 8.5" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013592 SQYD CONCRETE PAVEMENT ( 8.5" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 071266 SQYD CONCRETE PAVEMENT ( 8.5" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013600 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013604 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013601 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070431 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013611 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013610 SQYD CONCRETE PAVEMENT ( 9" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 070435 SQYD CONCRETE PAVEMENT ( 9" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 071416 SQYD CONCRETE PAVEMENT ( 9.5" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 071417 SQYD CONCRETE PAVEMENT ( 9.5" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013620 SQYD CONCRETE PAVEMENT (10" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013606 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013621 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070432 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013631 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013630 SQYD CONCRETE PAVEMENT (10" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 070436 SQYD CONCRETE PAVEMENT (10" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013623 SQYD CONCRETE PAVEMENT (10.5" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013672 SQYD CONCRETE PAVEMENT (10.5" UNIFORM) (AE) (BR APP) CALC. TO: 0.10, PAY TO: 1

0500 013607 SQYD CONCRETE PAVEMENT (10.5" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013673 SQYD CONCRETE PAVEMENT (10.5" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013622 SQYD CONCRETE PAVEMENT (11" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013642 SQYD CONCRETE PAVEMENT (11" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070433 SQYD CONCRETE PAVEMENT (11" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013633 SQYD CONCRETE PAVEMENT (11" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 070616 SQYD CONCRETE PAVEMENT (11" VARIABLE) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070437 SQYD CONCRETE PAVEMENT (11" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 071284 SQYD CONCRETE PAVEMENT (11.5" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 071281 SQYD CONCRETE PAVEMENT (11.5" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013632 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013605 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070434 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013635 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 070438 SQYD CONCRETE PAVEMENT (12" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013764 SQYD CONCRETE PAVEMENT (13" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013765 SQYD CONCRETE PAVEMENT (13" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 071683 SQYD CONCRETE PAVEMENT (13" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013767 SQYD CONCRETE PAVEMENT (13" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013734 SQYD CONCRETE PAVEMENT (13" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 025379 SQYD CONCRETE PAVEMENT (13") (AE) (NRDJ) (2-LIFT CONVENTIONAL) CALC. TO: 0.10, PAY TO: 1

0500 031509 SQYD CONCRETE PAVEMENT (13") (AE) (NRDJ) (2-LIFT DIAMOND GRIND) CALC. TO: 0.10, PAY TO: 1

0500 013579 SQYD CONCRETE PAVEMENT (14" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013634 SQYD CONCRETE PAVEMENT (14" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 011479 SQYD CONCRETE PAVEMENT (15" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013744 SQYD CONCRETE PAVEMENT (15" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013514 SQYD CONCRETE PAVEMENT (15" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 070735 SQYD CONCRETE PAVEMENT (16" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013557 SQYD CONCRETE PAVEMENT (16" VARIABLE) (AE) CALC. TO: 0.10, PAY TO: 1

0500 000031 LS CONCRETE PAVEMENT COMPOSITE PAY ADJUSTMENT CALC. TO: 1, PAY TO: 1

0503 000012 LS CONCRETE PAVEMENT SMOOTHNESS CALC. TO: 1, PAY TO: 1

0500 000021 LS CONCRETE PAVEMENT THICKNESS DEFICIENCY CALC. TO: 1, PAY TO: 1

0504 071133 SQYD CONCRETE PLACEMENT CALC. TO: 0.10, PAY TO: 1

0809 012580 LNFT CONCRETE SAFETY BARRIER CALC. TO: 0.10, PAY TO: 1

0809 012472 LNFT CONCRETE SAFETY BARRIER (INSTALLATION ONLY) CALC. TO: 0.10, PAY TO: 1

0809 072098 LNFT CONCRETE SAFETY BARRIER (REMOVE & RECONSTRUCT) CALC. TO: 0.10, PAY TO: 1

0809 071224 LNFT CONCRETE SAFETY BARRIER (REMOVE & RELOCATE) CALC. TO: 0.10, PAY TO: 1

0809 012488 LNFT CONCRETE SAFETY BARRIER (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 013508 LNFT CONCRETE SAFETY BARRIER (SPECIAL) (32") CALC. TO: 0.10, PAY TO: 1

0809 013509 LNFT CONCRETE SAFETY BARRIER (SPECIAL) (42") CALC. TO: 0.10, PAY TO: 1

0809 070341 LNFT CONCRETE SAFETY BARRIER (SPECIAL) (AE) CALC. TO: 0.10, PAY TO: 1

0809 013311 LNFT CONCRETE SAFETY BARRIER (SPECIAL) (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0809 012481 LNFT CONCRETE SAFETY BARRIER (TEMPORARY MAINTENANCE) CALC. TO: 0.10, PAY TO: 1

0809 012487 LNFT CONCRETE SAFETY BARRIER (TRANSITION) CALC. TO: 0.10, PAY TO: 1

0809 011928 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0809 011929 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) CALC. TO: 0.10, PAY TO: 1

0809 011927 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) CALC. TO: 0.10, PAY TO: 1

0809 012491 LNFT CONCRETE SAFETY BARRIER (TYPE I) CALC. TO: 0.10, PAY TO: 1

0809 071178 LNFT CONCRETE SAFETY BARRIER (TYPE I) (32") CALC. TO: 0.10, PAY TO: 1

0809 010096 LNFT CONCRETE SAFETY BARRIER (TYPE I) (32") (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0809 070879 LNFT CONCRETE SAFETY BARRIER (TYPE I) (32") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 012467 LNFT CONCRETE SAFETY BARRIER (TYPE I) (51") CALC. TO: 0.10, PAY TO: 1

0809 012595 LNFT CONCRETE SAFETY BARRIER (TYPE I) (51") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 070345 LNFT CONCRETE SAFETY BARRIER (TYPE I) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 070401 LNFT CONCRETE SAFETY BARRIER (TYPE I-A) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 071732 LNFT CONCRETE SAFETY BARRIER (TYPE I-F) CALC. TO: 0.10, PAY TO: 1

0809 072099 LNFT CONCRETE SAFETY BARRIER (TYPE I-F) (32") CALC. TO: 0.10, PAY TO: 1

0809 072007 LNFT CONCRETE SAFETY BARRIER (TYPE I-F) (51") CALC. TO: 0.10, PAY TO: 1

0809 011059 LNFT CONCRETE SAFETY BARRIER (TYPE I-F) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 012492 LNFT CONCRETE SAFETY BARRIER (TYPE II) CALC. TO: 0.10, PAY TO: 1

0809 071222 LNFT CONCRETE SAFETY BARRIER (TYPE II) (32") CALC. TO: 0.10, PAY TO: 1

0809 071179 LNFT CONCRETE SAFETY BARRIER (TYPE II) (32") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 013309 LNFT CONCRETE SAFETY BARRIER (TYPE II) (35") CALC. TO: 0.10, PAY TO: 1

0809 010095 LNFT CONCRETE SAFETY BARRIER (TYPE II) (42") (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0809 072388 LNFT CONCRETE SAFETY BARRIER (TYPE II) (42") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 013504 LNFT CONCRETE SAFETY BARRIER (TYPE II) (51") CALC. TO: 0.10, PAY TO: 1

0828 013545 LNFT CONCRETE SAFETY BARRIER (TYPE II) (51") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 013505 LNFT CONCRETE SAFETY BARRIER (TYPE II) (54") CALC. TO: 0.10, PAY TO: 1

0809 010094 LNFT CONCRETE SAFETY BARRIER (TYPE II) (54") (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0809 013310 LNFT CONCRETE SAFETY BARRIER (TYPE II) (54") (MODIFIED) (REINF) CALC. TO: 0.10, PAY TO: 1

0809 013506 LNFT CONCRETE SAFETY BARRIER (TYPE II) (54") (REINF) CALC. TO: 0.10, PAY TO: 1

0809 010093 LNFT CONCRETE SAFETY BARRIER (TYPE II) (54") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 013507 LNFT CONCRETE SAFETY BARRIER (TYPE II) (60") (SPECIAL) (REINF) CALC. TO: 0.10, PAY TO: 1

0809 070680 LNFT CONCRETE SAFETY BARRIER (TYPE II) (INSTALLATION ONLY) CALC. TO: 0.10, PAY TO: 1

0809 013308 LNFT CONCRETE SAFETY BARRIER (TYPE II) (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0809 013502 LNFT CONCRETE SAFETY BARRIER (TYPE II) (REINF) CALC. TO: 0.10, PAY TO: 1

0809 013503 LNFT CONCRETE SAFETY BARRIER (TYPE II) (SPECIAL) (REINF) CALC. TO: 0.10, PAY TO: 1

0809 070454 LNFT CONCRETE SAFETY BARRIER (TYPE II-C) CALC. TO: 0.10, PAY TO: 1

0809 071744 LNFT CONCRETE SAFETY BARRIER (TYPE II-F) CALC. TO: 0.10, PAY TO: 1

0809 072008 LNFT CONCRETE SAFETY BARRIER (TYPE II-F) (51") CALC. TO: 0.10, PAY TO: 1

0809 071733 LNFT CONCRETE SAFETY BARRIER (TYPE II-F) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 012391 LNFT CONCRETE SAFETY BARRIER (TYPE III) CALC. TO: 0.10, PAY TO: 1

0809 010092 LNFT CONCRETE SAFETY BARRIER (TYPE III) (32") (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0809 012484 LNFT CONCRETE SAFETY BARRIER (TYPE III) (51") CALC. TO: 0.10, PAY TO: 1

0809 010091 LNFT CONCRETE SAFETY BARRIER (TYPE III) (51") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 010054 LNFT CONCRETE SAFETY BARRIER (TYPE III) (54") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 070347 LNFT CONCRETE SAFETY BARRIER (TYPE III) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 071734 LNFT CONCRETE SAFETY BARRIER (TYPE III-F) CALC. TO: 0.10, PAY TO: 1

0809 072009 LNFT CONCRETE SAFETY BARRIER (TYPE III-F) (51") CALC. TO: 0.10, PAY TO: 1

0809 012433 LNFT CONCRETE SAFETY BARRIER (TYPE IV) CALC. TO: 0.10, PAY TO: 1

0809 071221 LNFT CONCRETE SAFETY BARRIER (TYPE IV) (32") CALC. TO: 0.10, PAY TO: 1

0809 012474 LNFT CONCRETE SAFETY BARRIER (TYPE IV) (51") CALC. TO: 0.10, PAY TO: 1

0809 071616 LNFT CONCRETE SAFETY BARRIER (TYPE IV) (INSTALLATION ONLY) CALC. TO: 0.10, PAY TO: 1

0809 070348 LNFT CONCRETE SAFETY BARRIER (TYPE IV) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 071755 LNFT CONCRETE SAFETY BARRIER (TYPE IV) (TEMPORARY - RELOCATE) CALC. TO: 0.10, PAY TO: 1

0809 012453 LNFT CONCRETE SAFETY BARRIER (TYPE IV) (TEMPORARY) CALC. TO: 0.10, PAY TO: 1

0809 071735 LNFT CONCRETE SAFETY BARRIER (TYPE IV-F) CALC. TO: 0.10, PAY TO: 1

0809 070422 LNFT CONCRETE SAFETY BARRIER (TYPE IV-F) (51") CALC. TO: 0.10, PAY TO: 1

0809 072109 LNFT CONCRETE SAFETY BARRIER (TYPE IV-F) (51") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 071080 LNFT CONCRETE SAFETY BARRIER (TYPE V) CALC. TO: 0.10, PAY TO: 1

0809 012443 LNFT CONCRETE SAFETY BARRIER (TYPE V) (51") CALC. TO: 0.10, PAY TO: 1

0809 071079 LNFT CONCRETE SAFETY BARRIER (TYPE V) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0809 071796 LNFT CONCRETE SAFETY BARRIER (TYPE VI) CALC. TO: 0.10, PAY TO: 1

0809 012477 LNFT CONCRETE SAFETY BARRIER (TYPE VI) (51") CALC. TO: 0.10, PAY TO: 1

0826 011374 SQFT CONCRETE SURFACE REPAIR CALC. TO: 1, PAY TO: 1

0109 000015 LS CONTRACT BOND CALC. TO: 1, PAY TO: 1

0104 000035 LS CONTRACT DEDUCT CALC. TO: 1, PAY TO: 1

0802 020100 LS CONTRACTOR CONSTRUCTION STAKING CALC. TO: 1, PAY TO: 1

0700 016332 EACH CONTRACTOR FURNISHED PDA CALC. TO: 1, PAY TO: 1

0703 010337 LNFT CORE HOLE (INVESTIGATIVE) CALC. TO: 0.10, PAY TO: 1

0109 000020 LS COST REDUCTION PROPOSAL CALC. TO: 1, PAY TO: 1

0600 010825 CUYD COVER MATERIAL (CM-A) CALC. TO: 0.10, PAY TO: 1

0600 010826 CUYD COVER MATERIAL (CM-B) CALC. TO: 0.10, PAY TO: 1

0600 010827 CUYD COVER MATERIAL (CM-C) CALC. TO: 0.10, PAY TO: 1

0600 010828 CUYD COVER MATERIAL (CM-D) CALC. TO: 0.10, PAY TO: 1

0600 010832 CUYD COVER MATERIAL (CM-H) CALC. TO: 0.10, PAY TO: 1

0600 010856 CUYD COVER MATERIAL (CM-J) CALC. TO: 0.10, PAY TO: 1

0600 010839 CUYD COVER MATERIAL (CM-K) CALC. TO: 0.10, PAY TO: 1

0600 010821 CUYD COVER MATERIAL (CM-L) CALC. TO: 0.10, PAY TO: 1

0600 029999 CUYD COVER MATERIAL (CM-P) CALC. TO: 0.10, PAY TO: 1

0800 011780 LNFT CRACK FILLING CALC. TO: 0.10, PAY TO: 1

0800 030316 EACH CRANE CALC. TO: 1, PAY TO: 1

0817 050000 LNFT CROSS ROAD PIPE ( 6") CALC. TO: 0.10, PAY TO: 1

0817 050007 LNFT CROSS ROAD PIPE ( 6") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050002 LNFT CROSS ROAD PIPE ( 6") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 050100 LNFT CROSS ROAD PIPE ( 8") CALC. TO: 0.10, PAY TO: 1

0817 050107 LNFT CROSS ROAD PIPE ( 8") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050102 LNFT CROSS ROAD PIPE ( 8") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 017951 LNFT CROSS ROAD PIPE ( 8") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 017957 LNFT CROSS ROAD PIPE ( 8") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016251 LNFT CROSS ROAD PIPE ( 8") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016257 LNFT CROSS ROAD PIPE ( 8") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 052500 LNFT CROSS ROAD PIPE ( 1.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 052507 LNFT CROSS ROAD PIPE ( 1.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 052501 LNFT CROSS ROAD PIPE ( 1.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 052600 LNFT CROSS ROAD PIPE ( 1.5 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 052611 LNFT CROSS ROAD PIPE ( 1.5 SQ.FT.) (ACSMAC) CALC. TO: 0.10, PAY TO: 1

0817 052607 LNFT CROSS ROAD PIPE ( 1.5 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 052610 LNFT CROSS ROAD PIPE ( 1.5 SQ.FT.) (CSMAC) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 052601 LNFT CROSS ROAD PIPE ( 1.5 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 050200 LNFT CROSS ROAD PIPE ( 10") CALC. TO: 0.10, PAY TO: 1

0817 050201 LNFT CROSS ROAD PIPE ( 10") (CIP) CALC. TO: 0.10, PAY TO: 1

0817 050207 LNFT CROSS ROAD PIPE ( 10") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050202 LNFT CROSS ROAD PIPE ( 10") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 017971 LNFT CROSS ROAD PIPE ( 10") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 017977 LNFT CROSS ROAD PIPE ( 10") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016271 LNFT CROSS ROAD PIPE ( 10") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016277 LNFT CROSS ROAD PIPE ( 10") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 050300 LNFT CROSS ROAD PIPE ( 12") CALC. TO: 0.10, PAY TO: 1

0817 010257 LNFT CROSS ROAD PIPE ( 12") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 050309 LNFT CROSS ROAD PIPE ( 12") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050302 LNFT CROSS ROAD PIPE ( 12") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 017991 LNFT CROSS ROAD PIPE ( 12") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 017997 LNFT CROSS ROAD PIPE ( 12") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016291 LNFT CROSS ROAD PIPE ( 12") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016297 LNFT CROSS ROAD PIPE ( 12") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 017990 LNFT CROSS ROAD PIPE ( 12") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016290 LNFT CROSS ROAD PIPE ( 12") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050301 LNFT CROSS ROAD PIPE ( 12") (RCP) CALC. TO: 0.10, PAY TO: 1

0817 050400 LNFT CROSS ROAD PIPE ( 15") CALC. TO: 0.10, PAY TO: 1

0817 050205 LNFT CROSS ROAD PIPE ( 15") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 050407 LNFT CROSS ROAD PIPE ( 15") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050402 LNFT CROSS ROAD PIPE ( 15") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018011 LNFT CROSS ROAD PIPE ( 15") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018017 LNFT CROSS ROAD PIPE ( 15") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016311 LNFT CROSS ROAD PIPE ( 15") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016317 LNFT CROSS ROAD PIPE ( 15") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018010 LNFT CROSS ROAD PIPE ( 15") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016310 LNFT CROSS ROAD PIPE ( 15") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050401 LNFT CROSS ROAD PIPE ( 15") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 071192 LNFT CROSS ROAD PIPE ( 15") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 050416 LNFT CROSS ROAD PIPE ( 16") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050500 LNFT CROSS ROAD PIPE ( 18") CALC. TO: 0.10, PAY TO: 1

0817 050206 LNFT CROSS ROAD PIPE ( 18") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 050509 LNFT CROSS ROAD PIPE ( 18") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050502 LNFT CROSS ROAD PIPE ( 18") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018031 LNFT CROSS ROAD PIPE ( 18") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018037 LNFT CROSS ROAD PIPE ( 18") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016331 LNFT CROSS ROAD PIPE ( 18") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016337 LNFT CROSS ROAD PIPE ( 18") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018030 LNFT CROSS ROAD PIPE ( 18") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016330 LNFT CROSS ROAD PIPE ( 18") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050501 LNFT CROSS ROAD PIPE ( 18") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 071220 LNFT CROSS ROAD PIPE ( 18") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 052700 LNFT CROSS ROAD PIPE ( 2.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 052707 LNFT CROSS ROAD PIPE ( 2.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 052701 LNFT CROSS ROAD PIPE ( 2.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 052800 LNFT CROSS ROAD PIPE ( 2.5 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 052807 LNFT CROSS ROAD PIPE ( 2.5 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 052810 LNFT CROSS ROAD PIPE ( 2.5 SQ.FT.) (CSMAC) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 052801 LNFT CROSS ROAD PIPE ( 2.5 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 050600 LNFT CROSS ROAD PIPE ( 21") CALC. TO: 0.10, PAY TO: 1

0817 050607 LNFT CROSS ROAD PIPE ( 21") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050602 LNFT CROSS ROAD PIPE ( 21") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018051 LNFT CROSS ROAD PIPE ( 21") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018057 LNFT CROSS ROAD PIPE ( 21") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016351 LNFT CROSS ROAD PIPE ( 21") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016357 LNFT CROSS ROAD PIPE ( 21") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018050 LNFT CROSS ROAD PIPE ( 21") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016350 LNFT CROSS ROAD PIPE ( 21") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050601 LNFT CROSS ROAD PIPE ( 21") (RCP) CALC. TO: 0.10, PAY TO: 1

0817 050700 LNFT CROSS ROAD PIPE ( 24") CALC. TO: 0.10, PAY TO: 1

0817 011064 LNFT CROSS ROAD PIPE ( 24") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 050709 LNFT CROSS ROAD PIPE ( 24") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050702 LNFT CROSS ROAD PIPE ( 24") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018071 LNFT CROSS ROAD PIPE ( 24") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018077 LNFT CROSS ROAD PIPE ( 24") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016371 LNFT CROSS ROAD PIPE ( 24") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016377 LNFT CROSS ROAD PIPE ( 24") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018070 LNFT CROSS ROAD PIPE ( 24") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 071156 LNFT CROSS ROAD PIPE ( 24") (PEP) CALC. TO: 0.10, PAY TO: 1

0817 016370 LNFT CROSS ROAD PIPE ( 24") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050701 LNFT CROSS ROAD PIPE ( 24") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 050699 LNFT CROSS ROAD PIPE ( 24") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 050800 LNFT CROSS ROAD PIPE ( 27") CALC. TO: 0.10, PAY TO: 1

0817 050807 LNFT CROSS ROAD PIPE ( 27") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050802 LNFT CROSS ROAD PIPE ( 27") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018091 LNFT CROSS ROAD PIPE ( 27") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018097 LNFT CROSS ROAD PIPE ( 27") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016391 LNFT CROSS ROAD PIPE ( 27") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016397 LNFT CROSS ROAD PIPE ( 27") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018090 LNFT CROSS ROAD PIPE ( 27") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016390 LNFT CROSS ROAD PIPE ( 27") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050801 LNFT CROSS ROAD PIPE ( 27") (RCP) CALC. TO: 0.10, PAY TO: 1

0817 052900 LNFT CROSS ROAD PIPE ( 3.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 052907 LNFT CROSS ROAD PIPE ( 3.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 052901 LNFT CROSS ROAD PIPE ( 3.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 052822 LNFT CROSS ROAD PIPE ( 3.0 SQ.FT.) (RCPHE) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050900 LNFT CROSS ROAD PIPE ( 30") CALC. TO: 0.10, PAY TO: 1

0817 050907 LNFT CROSS ROAD PIPE ( 30") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050902 LNFT CROSS ROAD PIPE ( 30") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018111 LNFT CROSS ROAD PIPE ( 30") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018117 LNFT CROSS ROAD PIPE ( 30") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016411 LNFT CROSS ROAD PIPE ( 30") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016417 LNFT CROSS ROAD PIPE ( 30") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018110 LNFT CROSS ROAD PIPE ( 30") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 071157 LNFT CROSS ROAD PIPE ( 30") (PEP) CALC. TO: 0.10, PAY TO: 1

0817 016410 LNFT CROSS ROAD PIPE ( 30") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050901 LNFT CROSS ROAD PIPE ( 30") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 050914 LNFT CROSS ROAD PIPE ( 30") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 050913 LNFT CROSS ROAD PIPE ( 30") (RCP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051000 LNFT CROSS ROAD PIPE ( 33") CALC. TO: 0.10, PAY TO: 1

0817 051007 LNFT CROSS ROAD PIPE ( 33") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051002 LNFT CROSS ROAD PIPE ( 33") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018131 LNFT CROSS ROAD PIPE ( 33") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018137 LNFT CROSS ROAD PIPE ( 33") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016431 LNFT CROSS ROAD PIPE ( 33") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016437 LNFT CROSS ROAD PIPE ( 33") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018130 LNFT CROSS ROAD PIPE ( 33") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016430 LNFT CROSS ROAD PIPE ( 33") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051001 LNFT CROSS ROAD PIPE ( 33") (RCP) CALC. TO: 0.10, PAY TO: 1

0817 051100 LNFT CROSS ROAD PIPE ( 36") CALC. TO: 0.10, PAY TO: 1

0817 013294 LNFT CROSS ROAD PIPE ( 36") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 051109 LNFT CROSS ROAD PIPE ( 36") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051102 LNFT CROSS ROAD PIPE ( 36") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018151 LNFT CROSS ROAD PIPE ( 36") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018157 LNFT CROSS ROAD PIPE ( 36") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016451 LNFT CROSS ROAD PIPE ( 36") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016457 LNFT CROSS ROAD PIPE ( 36") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018150 LNFT CROSS ROAD PIPE ( 36") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 050911 LNFT CROSS ROAD PIPE ( 36") (PEP) CALC. TO: 0.10, PAY TO: 1

0817 016450 LNFT CROSS ROAD PIPE ( 36") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051101 LNFT CROSS ROAD PIPE ( 36") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 051185 LNFT CROSS ROAD PIPE ( 36") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 018153 LNFT CROSS ROAD PIPE ( 36") (RCP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016458 LNFT CROSS ROAD PIPE ( 36") (RCP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 053000 LNFT CROSS ROAD PIPE ( 4.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053003 LNFT CROSS ROAD PIPE ( 4.0 SQ.FT.) (ACSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053007 LNFT CROSS ROAD PIPE ( 4.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053001 LNFT CROSS ROAD PIPE ( 4.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 051200 LNFT CROSS ROAD PIPE ( 42") CALC. TO: 0.10, PAY TO: 1

0817 051207 LNFT CROSS ROAD PIPE ( 42") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051202 LNFT CROSS ROAD PIPE ( 42") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018171 LNFT CROSS ROAD PIPE ( 42") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018177 LNFT CROSS ROAD PIPE ( 42") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016471 LNFT CROSS ROAD PIPE ( 42") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016477 LNFT CROSS ROAD PIPE ( 42") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018170 LNFT CROSS ROAD PIPE ( 42") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016470 LNFT CROSS ROAD PIPE ( 42") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051201 LNFT CROSS ROAD PIPE ( 42") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 051219 LNFT CROSS ROAD PIPE ( 42") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 018173 LNFT CROSS ROAD PIPE ( 42") (RCP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016478 LNFT CROSS ROAD PIPE ( 42") (RCP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051300 LNFT CROSS ROAD PIPE ( 48") CALC. TO: 0.10, PAY TO: 1

0817 011063 LNFT CROSS ROAD PIPE ( 48") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 051309 LNFT CROSS ROAD PIPE ( 48") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051302 LNFT CROSS ROAD PIPE ( 48") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018191 LNFT CROSS ROAD PIPE ( 48") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018197 LNFT CROSS ROAD PIPE ( 48") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016491 LNFT CROSS ROAD PIPE ( 48") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016497 LNFT CROSS ROAD PIPE ( 48") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018190 LNFT CROSS ROAD PIPE ( 48") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016490 LNFT CROSS ROAD PIPE ( 48") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051301 LNFT CROSS ROAD PIPE ( 48") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 051382 LNFT CROSS ROAD PIPE ( 48") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 018193 LNFT CROSS ROAD PIPE ( 48") (RCP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016498 LNFT CROSS ROAD PIPE ( 48") (RCP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 053100 LNFT CROSS ROAD PIPE ( 5.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053107 LNFT CROSS ROAD PIPE ( 5.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053101 LNFT CROSS ROAD PIPE ( 5.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 051400 LNFT CROSS ROAD PIPE ( 54") CALC. TO: 0.10, PAY TO: 1

0817 051407 LNFT CROSS ROAD PIPE ( 54") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051402 LNFT CROSS ROAD PIPE ( 54") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018211 LNFT CROSS ROAD PIPE ( 54") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018217 LNFT CROSS ROAD PIPE ( 54") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016511 LNFT CROSS ROAD PIPE ( 54") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016517 LNFT CROSS ROAD PIPE ( 54") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018210 LNFT CROSS ROAD PIPE ( 54") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016510 LNFT CROSS ROAD PIPE ( 54") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051401 LNFT CROSS ROAD PIPE ( 54") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 051410 LNFT CROSS ROAD PIPE ( 54") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 053200 LNFT CROSS ROAD PIPE ( 6.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053207 LNFT CROSS ROAD PIPE ( 6.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053213 LNFT CROSS ROAD PIPE ( 6.0 SQ.FT.) (RCPA) CALC. TO: 0.10, PAY TO: 1

0817 053201 LNFT CROSS ROAD PIPE ( 6.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 051500 LNFT CROSS ROAD PIPE ( 60") CALC. TO: 0.10, PAY TO: 1

0817 051509 LNFT CROSS ROAD PIPE ( 60") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051502 LNFT CROSS ROAD PIPE ( 60") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018231 LNFT CROSS ROAD PIPE ( 60") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018237 LNFT CROSS ROAD PIPE ( 60") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016531 LNFT CROSS ROAD PIPE ( 60") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016537 LNFT CROSS ROAD PIPE ( 60") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018230 LNFT CROSS ROAD PIPE ( 60") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016530 LNFT CROSS ROAD PIPE ( 60") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051501 LNFT CROSS ROAD PIPE ( 60") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 051582 LNFT CROSS ROAD PIPE ( 60") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 051600 LNFT CROSS ROAD PIPE ( 66") CALC. TO: 0.10, PAY TO: 1

0817 051607 LNFT CROSS ROAD PIPE ( 66") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051602 LNFT CROSS ROAD PIPE ( 66") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018251 LNFT CROSS ROAD PIPE ( 66") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018257 LNFT CROSS ROAD PIPE ( 66") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016551 LNFT CROSS ROAD PIPE ( 66") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016557 LNFT CROSS ROAD PIPE ( 66") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018250 LNFT CROSS ROAD PIPE ( 66") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016550 LNFT CROSS ROAD PIPE ( 66") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051601 LNFT CROSS ROAD PIPE ( 66") (RCP) CALC. TO: 0.10, PAY TO: 1

0817 053300 LNFT CROSS ROAD PIPE ( 7.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 051991 LNFT CROSS ROAD PIPE ( 7.0 SQ.FT.) (ACSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053307 LNFT CROSS ROAD PIPE ( 7.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053310 LNFT CROSS ROAD PIPE ( 7.0 SQ.FT.) (CSMAC) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 053301 LNFT CROSS ROAD PIPE ( 7.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 051700 LNFT CROSS ROAD PIPE ( 72") CALC. TO: 0.10, PAY TO: 1

0817 051710 LNFT CROSS ROAD PIPE ( 72") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 051707 LNFT CROSS ROAD PIPE ( 72") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051702 LNFT CROSS ROAD PIPE ( 72") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018271 LNFT CROSS ROAD PIPE ( 72") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018277 LNFT CROSS ROAD PIPE ( 72") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016571 LNFT CROSS ROAD PIPE ( 72") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016577 LNFT CROSS ROAD PIPE ( 72") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016572 LNFT CROSS ROAD PIPE ( 72") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016570 LNFT CROSS ROAD PIPE ( 72") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051701 LNFT CROSS ROAD PIPE ( 72") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 056107 LNFT CROSS ROAD PIPE ( 72") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 051800 LNFT CROSS ROAD PIPE ( 78") CALC. TO: 0.10, PAY TO: 1

0817 051807 LNFT CROSS ROAD PIPE ( 78") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051802 LNFT CROSS ROAD PIPE ( 78") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018291 LNFT CROSS ROAD PIPE ( 78") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018297 LNFT CROSS ROAD PIPE ( 78") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016591 LNFT CROSS ROAD PIPE ( 78") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016597 LNFT CROSS ROAD PIPE ( 78") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018290 LNFT CROSS ROAD PIPE ( 78") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016590 LNFT CROSS ROAD PIPE ( 78") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051801 LNFT CROSS ROAD PIPE ( 78") (RCP) CALC. TO: 0.10, PAY TO: 1

0817 053400 LNFT CROSS ROAD PIPE ( 8.5 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053407 LNFT CROSS ROAD PIPE ( 8.5 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053215 LNFT CROSS ROAD PIPE ( 8.5 SQ.FT.) (RCPA) CALC. TO: 0.10, PAY TO: 1

0817 053401 LNFT CROSS ROAD PIPE ( 8.5 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 053214 LNFT CROSS ROAD PIPE ( 8.8 SQ.FT.) (RCPA) CALC. TO: 0.10, PAY TO: 1

0817 051900 LNFT CROSS ROAD PIPE ( 84") CALC. TO: 0.10, PAY TO: 1

0817 011485 LNFT CROSS ROAD PIPE ( 84") (ACSP) CALC. TO: 0.10, PAY TO: 1

0817 051907 LNFT CROSS ROAD PIPE ( 84") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 051902 LNFT CROSS ROAD PIPE ( 84") (CSP) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018311 LNFT CROSS ROAD PIPE ( 84") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 018317 LNFT CROSS ROAD PIPE ( 84") (CSP) (INSTALL ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 016611 LNFT CROSS ROAD PIPE ( 84") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016617 LNFT CROSS ROAD PIPE ( 84") (CSP) (PROVIDE ONLY) (BC) CALC. TO: 0.10, PAY TO: 1

0817 018310 LNFT CROSS ROAD PIPE ( 84") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016610 LNFT CROSS ROAD PIPE ( 84") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 051901 LNFT CROSS ROAD PIPE ( 84") (RCP) CALC. TO: 0.10, PAY TO: 1

0819 056255 LNFT CROSS ROAD PIPE ( 84") (RCP) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0817 072002 LNFT CROSS ROAD PIPE ( 90") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 060470 LNFT CROSS ROAD PIPE ( 96") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 060477 LNFT CROSS ROAD PIPE ( 96") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 053500 LNFT CROSS ROAD PIPE (10.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053512 LNFT CROSS ROAD PIPE (10.0 SQ.FT.) (ACSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053507 LNFT CROSS ROAD PIPE (10.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053501 LNFT CROSS ROAD PIPE (10.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 053511 LNFT CROSS ROAD PIPE (10.0 SQ.FT.) (RCPHE) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 053515 LNFT CROSS ROAD PIPE (10.0 SQ.FT.) (RCPHE) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 052100 LNFT CROSS ROAD PIPE (108") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 053600 LNFT CROSS ROAD PIPE (11.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053607 LNFT CROSS ROAD PIPE (11.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053601 LNFT CROSS ROAD PIPE (11.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 053700 LNFT CROSS ROAD PIPE (12.5 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053707 LNFT CROSS ROAD PIPE (12.5 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053701 LNFT CROSS ROAD PIPE (12.5 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 053711 LNFT CROSS ROAD PIPE (12.5 SQ.FT.) (RCPHE) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 053715 LNFT CROSS ROAD PIPE (12.5 SQ.FT.) (RCPHE) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 052110 LNFT CROSS ROAD PIPE (120") CALC. TO: 0.10, PAY TO: 1

0817 052119 LNFT CROSS ROAD PIPE (120") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 053800 LNFT CROSS ROAD PIPE (14.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053810 LNFT CROSS ROAD PIPE (14.0 SQ.FT.) (ACSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053807 LNFT CROSS ROAD PIPE (14.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053801 LNFT CROSS ROAD PIPE (14.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 053900 LNFT CROSS ROAD PIPE (16.5 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 053811 LNFT CROSS ROAD PIPE (16.5 SQ.FT.) (ACSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053907 LNFT CROSS ROAD PIPE (16.5 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053901 LNFT CROSS ROAD PIPE (16.5 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 071130 LNFT CROSS ROAD PIPE (18.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053924 LNFT CROSS ROAD PIPE (21.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053923 LNFT CROSS ROAD PIPE (21.0 SQ.FT.) (RCPHE) CALC. TO: 0.10, PAY TO: 1

0817 053910 LNFT CROSS ROAD PIPE (25.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 051121 LNFT CROSS ROAD PIPE (36.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053983 LNFT CROSS ROAD PIPE (47.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 053954 LNFT CROSS ROAD PIPE (74.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 071649 LNFT CROSS ROAD PIPE (87.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0304 025161 SQYD CRUSHED STONE SUBGRADE ( 2") CALC. TO: 0.10, PAY TO: 1

0304 072355 SQYD CRUSHED STONE SUBGRADE ( 3") CALC. TO: 0.10, PAY TO: 1

0304 025175 SQYD CRUSHED STONE SUBGRADE ( 4") CALC. TO: 0.10, PAY TO: 1

0304 025174 SQYD CRUSHED STONE SUBGRADE ( 5") CALC. TO: 0.10, PAY TO: 1

0304 025160 SQYD CRUSHED STONE SUBGRADE ( 6") CALC. TO: 0.10, PAY TO: 1

0304 071520 SQYD CRUSHED STONE SUBGRADE ( 7") CALC. TO: 0.10, PAY TO: 1

0304 025162 SQYD CRUSHED STONE SUBGRADE ( 8") CALC. TO: 0.10, PAY TO: 1

0304 023991 SQYD CRUSHED STONE SUBGRADE ( 9") CALC. TO: 0.10, PAY TO: 1

0304 025153 SQYD CRUSHED STONE SUBGRADE (10") CALC. TO: 0.10, PAY TO: 1

0304 025163 SQYD CRUSHED STONE SUBGRADE (12") CALC. TO: 0.10, PAY TO: 1

0304 025164 SQYD CRUSHED STONE SUBGRADE (18") CALC. TO: 0.10, PAY TO: 1

0825 061732 LNFT CURB AND GUTTER, ASPHALTIC CONCRETE CALC. TO: 0.10, PAY TO: 1

0825 061575 LNFT CURB AND GUTTER, COMBINED CALC. TO: 0.10, PAY TO: 1

0825 061547 LNFT CURB AND GUTTER, COMBINED (1'-9") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061645 LNFT CURB AND GUTTER, COMBINED (1'-9") (AE) (MOUNTABLE) CALC. TO: 0.10, PAY TO: 1

0825 061653 LNFT CURB AND GUTTER, COMBINED (1'-9") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061650 LNFT CURB AND GUTTER, COMBINED (2'-0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061651 LNFT CURB AND GUTTER, COMBINED (2'-0") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061597 LNFT CURB AND GUTTER, COMBINED (AE) CALC. TO: 0.10, PAY TO: 1

0825 061576 LNFT CURB AND GUTTER, COMBINED (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061577 LNFT CURB AND GUTTER, COMBINED (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0901 080449 LNFT CURB INLET PROTECTION CALC. TO: 0.10, PAY TO: 1

0825 082500 LNFT CURB REPAIR CALC. TO: 0.10, PAY TO: 1

0825 061715 LNFT CURB, ASPHALTIC CONCRETE CALC. TO: 0.10, PAY TO: 1

0825 061714 LNFT CURB, ASPHALTIC CONCRETE (1.5") CALC. TO: 0.10, PAY TO: 1

0825 061716 LNFT CURB, ASPHALTIC CONCRETE (3.0") CALC. TO: 0.10, PAY TO: 1

0825 061718 LNFT CURB, ASPHALTIC CONCRETE (6.0") CALC. TO: 0.10, PAY TO: 1

0825 061719 LNFT CURB, ASPHALTIC CONCRETE (7.5") CALC. TO: 0.10, PAY TO: 1

0825 061720 LNFT CURB, ASPHALTIC CONCRETE (8.0") CALC. TO: 0.10, PAY TO: 1

0825 061721 LNFT CURB, ASPHALTIC CONCRETE (9.0") CALC. TO: 0.10, PAY TO: 1

0825 061000 LNFT CURB, EDGE ( 1.5") CALC. TO: 0.10, PAY TO: 1

0825 061001 LNFT CURB, EDGE ( 1.5") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061002 LNFT CURB, EDGE ( 1.5") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061050 LNFT CURB, EDGE ( 3.0") CALC. TO: 0.10, PAY TO: 1

0825 061051 LNFT CURB, EDGE ( 3.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061053 LNFT CURB, EDGE ( 3.0") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061052 LNFT CURB, EDGE ( 3.25") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061100 LNFT CURB, EDGE ( 4.0") CALC. TO: 0.10, PAY TO: 1

0825 061101 LNFT CURB, EDGE ( 4.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061102 LNFT CURB, EDGE ( 4.0") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061125 LNFT CURB, EDGE ( 4.5") CALC. TO: 0.10, PAY TO: 1

0825 061126 LNFT CURB, EDGE ( 4.5") CALC. TO: 0.10, PAY TO: 1

0825 061150 LNFT CURB, EDGE ( 5.0") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061155 LNFT CURB, EDGE ( 6 5/8") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061175 LNFT CURB, EDGE ( 6.0") CALC. TO: 0.10, PAY TO: 1

0825 061176 LNFT CURB, EDGE ( 6.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061181 LNFT CURB, EDGE ( 6.0") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061178 LNFT CURB, EDGE ( 6.0") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061179 LNFT CURB, EDGE ( 6.0") (AE) (SPECIAL) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061180 LNFT CURB, EDGE ( 6.0") (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061261 LNFT CURB, EDGE ( 7.0") CALC. TO: 0.10, PAY TO: 1

0825 061156 LNFT CURB, EDGE ( 7.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061262 LNFT CURB, EDGE ( 7.0") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061260 LNFT CURB, EDGE ( 7.0") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061263 LNFT CURB, EDGE ( 7.125") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061376 LNFT CURB, EDGE ( 7.5" & 1.5") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061225 LNFT CURB, EDGE ( 8.0") CALC. TO: 0.10, PAY TO: 1

0825 061226 LNFT CURB, EDGE ( 8.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061253 LNFT CURB, EDGE ( 8.0") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061228 LNFT CURB, EDGE ( 8.0") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061184 LNFT CURB, EDGE ( 8.0") (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061183 LNFT CURB, EDGE ( 8.0") (SPECIAL) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061250 LNFT CURB, EDGE ( 8.5") CALC. TO: 0.10, PAY TO: 1

0825 061251 LNFT CURB, EDGE ( 8.5") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061252 LNFT CURB, EDGE ( 8.5") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061275 LNFT CURB, EDGE ( 9.0") CALC. TO: 0.10, PAY TO: 1

0825 061276 LNFT CURB, EDGE ( 9.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061282 LNFT CURB, EDGE ( 9.0") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061277 LNFT CURB, EDGE ( 9.25") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061278 LNFT CURB, EDGE ( 9.5") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061325 LNFT CURB, EDGE (10.0") CALC. TO: 0.10, PAY TO: 1

0825 061326 LNFT CURB, EDGE (10.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061330 LNFT CURB, EDGE (10.0") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061329 LNFT CURB, EDGE (10.0") (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061350 LNFT CURB, EDGE (10.5") CALC. TO: 0.10, PAY TO: 1

0825 061351 LNFT CURB, EDGE (10.5") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061375 LNFT CURB, EDGE (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061374 LNFT CURB, EDGE (SPECIAL) (AE) CALC. TO: 0.10, PAY TO: 1

0825 061379 LNFT CURB, EDGE (SPECIAL) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061333 LNFT CURB, EDGE (VARIABLE) (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061334 LNFT CURB, EDGE (VARIABLE) (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061730 LNFT CURB, HEADER CALC. TO: 0.10, PAY TO: 1

0825 061731 LNFT CURB, HEADER (AE) CALC. TO: 0.10, PAY TO: 1

0825 061400 LNFT CURB, PROTECTION CALC. TO: 0.10, PAY TO: 1

0825 071535 LNFT CURB, PROTECTION ( 1' - 0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 071299 LNFT CURB, PROTECTION ( 1.5") (AE) CALC. TO: 0.10, PAY TO: 1

0825 071081 LNFT CURB, PROTECTION ( 2' - 0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061443 LNFT CURB, PROTECTION ( 5.5") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061445 LNFT CURB, PROTECTION ( 6.0") CALC. TO: 0.10, PAY TO: 1

0825 061446 LNFT CURB, PROTECTION ( 6.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061444 LNFT CURB, PROTECTION ( 6.0") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061447 LNFT CURB, PROTECTION ( 7.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061490 LNFT CURB, PROTECTION ( 8.0") CALC. TO: 0.10, PAY TO: 1

0825 061491 LNFT CURB, PROTECTION ( 8.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061492 LNFT CURB, PROTECTION ( 8.0") (AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061498 LNFT CURB, PROTECTION ( 8.0") (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061535 LNFT CURB, PROTECTION ( 9.0") CALC. TO: 0.10, PAY TO: 1

0825 061401 LNFT CURB, PROTECTION ( AE) CALC. TO: 0.10, PAY TO: 1

0825 061408 LNFT CURB, PROTECTION ( AE) (DOWELED) CALC. TO: 0.10, PAY TO: 1

0825 061406 LNFT CURB, PROTECTION ( SPECIAL) CALC. TO: 0.10, PAY TO: 1

0825 061407 LNFT CURB, PROTECTION ( SPECIAL) (AE) CALC. TO: 0.10, PAY TO: 1

0825 061402 LNFT CURB, PROTECTION ( TYPE I) CALC. TO: 0.10, PAY TO: 1

0825 061403 LNFT CURB, PROTECTION ( TYPE I) (AE) CALC. TO: 0.10, PAY TO: 1

0825 061404 LNFT CURB, PROTECTION ( TYPE II) CALC. TO: 0.10, PAY TO: 1

0825 061405 LNFT CURB, PROTECTION ( TYPE II) (AE) CALC. TO: 0.10, PAY TO: 1

0825 061537 LNFT CURB, PROTECTION (10.0") (AE) CALC. TO: 0.10, PAY TO: 1

0825 061536 LNFT CURB, PROTECTION (10.0") (AE) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0600 070658 SQYD CUTBACK ASPHALT (DUST CONTROL) CALC. TO: 0.10, PAY TO: 1

0600 013351 TON CUTBACK ASPHALT (MC- 30) (PRIME) CALC. TO: 0.10, PAY TO: 1

0600 083352 TON CUTBACK ASPHALT (MC- 70) (PRIME) CALC. TO: 0.10, PAY TO: 1

0600 083334 TON CUTBACK ASPHALT (MC- 800) CALC. TO: 0.10, PAY TO: 1

0600 083299 TON CUTBACK ASPHALT (RC- 70) (SEAL) CALC. TO: 0.10, PAY TO: 1

0600 013292 TON CUTBACK ASPHALT (RC- 250) (PRIME) CALC. TO: 0.10, PAY TO: 1

0109 000008 LS DISINCENTIVE DEDUCTION CALC. TO: 1, PAY TO: 1

0800 071036 EACH DOWEL BAR RETROFIT (1.5" X 18") CALC. TO: 1, PAY TO: 1

0300 070564 SQYD DRAINABLE BASE (BOUND) (4") CALC. TO: 0.10, PAY TO: 1

0703 014172 LNFT DRILLED SHAFT ( 16") CALC. TO: 0.10, PAY TO: 1

0703 070265 LNFT DRILLED SHAFT ( 16") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014160 LNFT DRILLED SHAFT ( 18") CALC. TO: 0.10, PAY TO: 1

0703 070253 LNFT DRILLED SHAFT ( 18") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014161 LNFT DRILLED SHAFT ( 24") CALC. TO: 0.10, PAY TO: 1

0703 070254 LNFT DRILLED SHAFT ( 24") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 070255 LNFT DRILLED SHAFT ( 30") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014163 LNFT DRILLED SHAFT ( 36") CALC. TO: 0.10, PAY TO: 1

0703 070256 LNFT DRILLED SHAFT ( 36") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014164 LNFT DRILLED SHAFT ( 42") CALC. TO: 0.10, PAY TO: 1

0703 070257 LNFT DRILLED SHAFT ( 42") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014165 LNFT DRILLED SHAFT ( 48") CALC. TO: 0.10, PAY TO: 1

0703 070258 LNFT DRILLED SHAFT ( 48") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014166 LNFT DRILLED SHAFT ( 54") CALC. TO: 0.10, PAY TO: 1

0703 070259 LNFT DRILLED SHAFT ( 54") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014167 LNFT DRILLED SHAFT ( 60") CALC. TO: 0.10, PAY TO: 1

0703 070260 LNFT DRILLED SHAFT ( 60") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014149 LNFT DRILLED SHAFT ( 66") CALC. TO: 0.10, PAY TO: 1

0703 070261 LNFT DRILLED SHAFT ( 66") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014134 LNFT DRILLED SHAFT ( 72") CALC. TO: 0.10, PAY TO: 1

0703 070262 LNFT DRILLED SHAFT ( 72") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014152 LNFT DRILLED SHAFT ( 78") CALC. TO: 0.10, PAY TO: 1

0703 070263 LNFT DRILLED SHAFT ( 78") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 071756 LNFT DRILLED SHAFT ( 84") CALC. TO: 0.10, PAY TO: 1

0703 014153 LNFT DRILLED SHAFT ( 84") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014116 LNFT DRILLED SHAFT ( 90") CALC. TO: 0.10, PAY TO: 1

0703 072302 LNFT DRILLED SHAFT ( 90") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 071211 LNFT DRILLED SHAFT ( 96") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 072303 LNFT DRILLED SHAFT (102") (CASED) CALC. TO: 0.10, PAY TO: 1

0703 014173 LNFT DRILLED SHAFT (108") CALC. TO: 0.10, PAY TO: 1

0703 070264 LNFT DRILLED SHAFT (108") (CASED) CALC. TO: 0.10, PAY TO: 1

0842 025479 EACH DRILLING AND GROUTING CALC. TO: 1, PAY TO: 1

0842 025471 EACH DRILLING AND GROUTING (REPAIR) (SET PRICE) CALC. TO: 1, PAY TO: 1

0800 030317 EACH DROP TABLE CALC. TO: 1, PAY TO: 1

0500 013700 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 4" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013701 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 4" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013710 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 5" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013711 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 5" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013720 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 6" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013722 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 6" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013723 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013721 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 6" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013815 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 7" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013836 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 7" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013733 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 7" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013731 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 7" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013740 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 8" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013742 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 8" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013771 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013743 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013741 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 8" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013534 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 8") (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013749 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 9" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013752 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 9" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 070952 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 9" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013753 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 9" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013751 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 9" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013748 SQYD EARLY STRENGTH CONCRETE PAVEMENT ( 9" VARIABLE) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013760 SQYD EARLY STRENGTH CONCRETE PAVEMENT (10" UNIFORM) CALC. TO: 0.10, PAY TO: 1

0500 013762 SQYD EARLY STRENGTH CONCRETE PAVEMENT (10" UNIFORM) (AE) CALC. TO: 0.10, PAY TO: 1

0500 013769 SQYD EARLY STRENGTH CONCRETE PAVEMENT (10" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013763 SQYD EARLY STRENGTH CONCRETE PAVEMENT (10" UNIFORM) (AE) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013761 SQYD EARLY STRENGTH CONCRETE PAVEMENT (10" UNIFORM) (PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013755 SQYD EARLY STRENGTH CONCRETE PAVEMENT (10" VARIABLE)(AE)(PLAIN) CALC. TO: 0.10, PAY TO: 1

0500 013849 SQYD EARLY STRENGTH CONCRETE PAVEMENT (11" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0500 013759 SQYD EARLY STRENGTH CONCRETE PAVEMENT (15" UNIFORM) (AE) (NRDJ) CALC. TO: 0.10, PAY TO: 1

0800 012946 EACH EDGE DRAIN OUTLETS CALC. TO: 1, PAY TO: 1

0800 013071 LNFT EDGE DRAIN PIPE CALC. TO: 0.10, PAY TO: 1

0706 012246 EACH ELASTOMERIC BEARING PAD CALC. TO: 1, PAY TO: 1

0706 012252 EACH ELASTOMERIC BEARING PAD (10" X 14" X 4 3/8") CALC. TO: 1, PAY TO: 1

0706 012254 EACH ELASTOMERIC BEARING PAD (12" X 18" X 2 1/16") CALC. TO: 1, PAY TO: 1

0706 012255 EACH ELASTOMERIC BEARING PAD (12" X 18" X 3 9/16") CALC. TO: 1, PAY TO: 1

0706 012253 EACH ELASTOMERIC BEARING PAD (12" X 18" X 3/4") CALC. TO: 1, PAY TO: 1

0706 012256 EACH ELASTOMERIC BEARING PAD (12" X 18" X 5 1/16") CALC. TO: 1, PAY TO: 1

0814 023098 LNFT ELECTRIC CONDUIT ( .75") (METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023088 LNFT ELECTRIC CONDUIT ( 1.0") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023102 LNFT ELECTRIC CONDUIT ( 1.25") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023101 LNFT ELECTRIC CONDUIT ( 1.5") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023130 LNFT ELECTRIC CONDUIT ( 2.0") CALC. TO: 0.10, PAY TO: 1

0814 023131 LNFT ELECTRIC CONDUIT ( 2.0") (METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023135 LNFT ELECTRIC CONDUIT ( 2.0") (METALLIC-PVC) CALC. TO: 0.10, PAY TO: 1

0814 023132 LNFT ELECTRIC CONDUIT ( 2.0") (METALLIC/NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023133 LNFT ELECTRIC CONDUIT ( 2.0") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023136 LNFT ELECTRIC CONDUIT ( 2.0") (NON-METALLIC) (INSTALLATION ONLY) CALC. TO: 0.10, PAY TO: 1

0814 023182 LNFT ELECTRIC CONDUIT ( 2.5") (METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023145 LNFT ELECTRIC CONDUIT ( 2.5") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023414 LNFT ELECTRIC CONDUIT ( 3.0") (METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023179 LNFT ELECTRIC CONDUIT ( 3.0") (METALLIC) (INSTALLATION ONLY) CALC. TO: 0.10, PAY TO: 1

0814 023172 LNFT ELECTRIC CONDUIT ( 3.0") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023173 LNFT ELECTRIC CONDUIT ( 3.0") (NON-METALLIC) (INSTALLATION ONLY) CALC. TO: 0.10, PAY TO: 1

0814 023185 LNFT ELECTRIC CONDUIT ( 3.5") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023180 LNFT ELECTRIC CONDUIT ( 4.0") CALC. TO: 0.10, PAY TO: 1

0814 023186 LNFT ELECTRIC CONDUIT ( 4.0") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023184 LNFT ELECTRIC CONDUIT ( 4.0") (NON-METALLIC) (INSTALLATION ONLY) CALC. TO: 0.10, PAY TO: 1

0814 023189 LNFT ELECTRIC CONDUIT ( 6.0") (METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023187 LNFT ELECTRIC CONDUIT ( 6.0") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023175 LNFT ELECTRIC CONDUIT ( 8.0") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0814 023190 LS ELECTRIC CONDUIT (INSTALLATION ONLY) CALC. TO: 1, PAY TO: 1

0814 025300 LS ELECTRIC LIGHTING SYSTEM CALC. TO: 1, PAY TO: 1

0814 023085 EACH ELECTRIC SERVICE BOX CALC. TO: 1, PAY TO: 1

0205 012350 CUYD EMBANKMENT CALC. TO: 1, PAY TO: 1

0205 012354 CUYD EMBANKMENT (CONTRACTOR FURNISHED) CALC. TO: 1, PAY TO: 1

0700 070922 SQFT EMBEDDED GALVANIC ANODE CALC. TO: 0.10, PAY TO: 1

0700 011044 EACH EMBEDDED GALVANIC ANODE CALC. TO: 1, PAY TO: 1

0800 000025 LS EMERGENCY REPAIR CALC. TO: 1, PAY TO: 1

0814 025311 LS EMERGENCY VEHICLE SYSTEM CALC. TO: 1, PAY TO: 1

0602 060282 SQYD EMULSIFIED ASPHALT CALC. TO: 0.10, PAY TO: 1

0600 083424 TON EMULSIFIED ASPHALT (CRS-1H) (SEAL) CALC. TO: 0.10, PAY TO: 1

0600 080672 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) CALC. TO: 0.10, PAY TO: 1

0604 011591 TON EMULSIFIED ASPHALT (CSS) (SPECIAL) CALC. TO: 0.10, PAY TO: 1

0604 083425 TON EMULSIFIED ASPHALT (CSS-1H OR SS-1H) (CURE) (SET PRICE) CALC. TO: 0.10, PAY TO: 1

0606 083462 TON EMULSIFIED ASPHALT (CSS-1H) (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0600 040703 TON EMULSIFIED ASPHALT (CSS-1HF) (MODIFIED) CALC. TO: 0.10, PAY TO: 1

0613 010819 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) CALC. TO: 0.10, PAY TO: 1

0600 060286 SQYD EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) CALC. TO: 0.10, PAY TO: 1

0600 083447 TON EMULSIFIED ASPHALT (SS-1H OR CSS-1H) CALC. TO: 0.10, PAY TO: 1

0600 081513 TON EMULSIFIED ASPHALT (SS-1H OR CSS-1H) (PRIME) CALC. TO: 0.10, PAY TO: 1

0600 010256 TON EMULSIFIED ASPHALT (SS-1HP) CALC. TO: 0.10, PAY TO: 1

0600 000050 LS EMULSIFIED ASPHALT PRICE ADJUSTMENT CALC. TO: 1, PAY TO: 1

0818 023065 LNFT ENCASEMENT PIPE ( 2") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023310 LNFT ENCASEMENT PIPE ( 3") (PVC) CALC. TO: 0.10, PAY TO: 1

0818 023075 LNFT ENCASEMENT PIPE ( 4") CALC. TO: 0.10, PAY TO: 1

0818 070445 LNFT ENCASEMENT PIPE ( 4") (NON-METALLIC) CALC. TO: 0.10, PAY TO: 1

0818 023311 LNFT ENCASEMENT PIPE ( 4") (PVC) CALC. TO: 0.10, PAY TO: 1

0819 023103 LNFT ENCASEMENT PIPE ( 4") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0819 071553 LNFT ENCASEMENT PIPE ( 4.5") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0818 023069 LNFT ENCASEMENT PIPE ( 6") CALC. TO: 0.10, PAY TO: 1

0818 071173 LNFT ENCASEMENT PIPE ( 6") (CPP) CALC. TO: 0.10, PAY TO: 1

0818 071574 LNFT ENCASEMENT PIPE ( 6") (STEEL) CALC. TO: 0.10, PAY TO: 1

0819 023104 LNFT ENCASEMENT PIPE ( 6") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0818 023068 LNFT ENCASEMENT PIPE ( 8") CALC. TO: 0.10, PAY TO: 1

0818 071174 LNFT ENCASEMENT PIPE ( 8") (CPP) CALC. TO: 0.10, PAY TO: 1

0818 070459 LNFT ENCASEMENT PIPE ( 8") (PVP) CALC. TO: 0.10, PAY TO: 1

0818 011489 LNFT ENCASEMENT PIPE ( 8") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023067 LNFT ENCASEMENT PIPE (10") CALC. TO: 0.10, PAY TO: 1

0818 023084 LNFT ENCASEMENT PIPE (10") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023066 LNFT ENCASEMENT PIPE (12") CALC. TO: 0.10, PAY TO: 1

0818 023137 LNFT ENCASEMENT PIPE (12") (STEEL) CALC. TO: 0.10, PAY TO: 1

0819 070647 LNFT ENCASEMENT PIPE (12") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0818 023083 LNFT ENCASEMENT PIPE (12.75") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023087 LNFT ENCASEMENT PIPE (14") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023077 LNFT ENCASEMENT PIPE (15") CALC. TO: 0.10, PAY TO: 1

0818 023080 LNFT ENCASEMENT PIPE (16") (STEEL) CALC. TO: 0.10, PAY TO: 1

0819 072001 LNFT ENCASEMENT PIPE (16") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0818 023078 LNFT ENCASEMENT PIPE (18") CALC. TO: 0.10, PAY TO: 1

0818 071762 LNFT ENCASEMENT PIPE (18") (RCP) CALC. TO: 0.10, PAY TO: 1

0818 023082 LNFT ENCASEMENT PIPE (18") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023081 LNFT ENCASEMENT PIPE (20") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023079 LNFT ENCASEMENT PIPE (24") (CMP) CALC. TO: 0.10, PAY TO: 1

0818 023089 LNFT ENCASEMENT PIPE (24") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023071 LNFT ENCASEMENT PIPE (30") CALC. TO: 0.10, PAY TO: 1

0818 023004 LNFT ENCASEMENT PIPE (30") (STEEL) CALC. TO: 0.10, PAY TO: 1

0819 023307 LNFT ENCASEMENT PIPE (30") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0819 023308 LNFT ENCASEMENT PIPE (32") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0818 023074 LNFT ENCASEMENT PIPE (36") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023076 LNFT ENCASEMENT PIPE (40") (STEEL) CALC. TO: 0.10, PAY TO: 1

0818 023072 LNFT ENCASEMENT PIPE (42") CALC. TO: 0.10, PAY TO: 1

0818 023309 LNFT ENCASEMENT PIPE (42") (CMP) CALC. TO: 0.10, PAY TO: 1

0818 023005 LNFT ENCASEMENT PIPE (42") (STEEL) CALC. TO: 0.10, PAY TO: 1

0819 071573 LNFT ENCASEMENT PIPE (48") (STEEL) (BORED, JACKED OR TUNNELED) CALC. TO: 0.10, PAY TO: 1

0818 023073 LNFT ENCASEMENT PIPE (54") CALC. TO: 0.10, PAY TO: 1

0818 011859 LNFT ENCASEMENT PIPE (54") (STEEL) CALC. TO: 0.10, PAY TO: 1

0800 057196 EACH END ANCHORS CALC. TO: 1, PAY TO: 1

0817 055000 EACH END SECTION ( 1.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055004 EACH END SECTION ( 1.0 SQ.FT.) (CAMA) CALC. TO: 1, PAY TO: 1

0817 055003 EACH END SECTION ( 1.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055235 EACH END SECTION ( 1.0 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 055001 EACH END SECTION ( 1.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055025 EACH END SECTION ( 1.5 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055028 EACH END SECTION ( 1.5 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055238 EACH END SECTION ( 1.5 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 055026 EACH END SECTION ( 1.5 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055032 EACH END SECTION ( 1.5 SQ.FT.) (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 055240 EACH END SECTION ( 11.0 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 054500 EACH END SECTION ( 12") CALC. TO: 1, PAY TO: 1

0817 054508 EACH END SECTION ( 12") (ACS) CALC. TO: 1, PAY TO: 1

0817 054502 EACH END SECTION ( 12") (CS) CALC. TO: 1, PAY TO: 1

0817 054501 EACH END SECTION ( 12") (RC) CALC. TO: 1, PAY TO: 1

0817 054525 EACH END SECTION ( 15") CALC. TO: 1, PAY TO: 1

0817 054544 EACH END SECTION ( 15") (ACS) CALC. TO: 1, PAY TO: 1

0817 054528 EACH END SECTION ( 15") (CS) CALC. TO: 1, PAY TO: 1

0817 054541 EACH END SECTION ( 15") (CS) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054526 EACH END SECTION ( 15") (RC) CALC. TO: 1, PAY TO: 1

0817 054524 EACH END SECTION ( 15") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 055379 EACH END SECTION ( 16.5 SQ. FT.) (ACSMA) CALC. TO: 1, PAY TO: 1

0817 054550 EACH END SECTION ( 18") CALC. TO: 1, PAY TO: 1

0817 054549 EACH END SECTION ( 18") (ACS) CALC. TO: 1, PAY TO: 1

0817 054552 EACH END SECTION ( 18") (CS) CALC. TO: 1, PAY TO: 1

0817 054557 EACH END SECTION ( 18") (CS) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 054551 EACH END SECTION ( 18") (RC) CALC. TO: 1, PAY TO: 1

0817 054563 EACH END SECTION ( 18") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 055050 EACH END SECTION ( 2.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055053 EACH END SECTION ( 2.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055051 EACH END SECTION ( 2.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055075 EACH END SECTION ( 2.5 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055078 EACH END SECTION ( 2.5 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055083 EACH END SECTION ( 2.5 SQ.FT.) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 055060 EACH END SECTION ( 2.5 SQ.FT.) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 055236 EACH END SECTION ( 2.5 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 055076 EACH END SECTION ( 2.5 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055084 EACH END SECTION ( 2.5 SQ.FT.) (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 054575 EACH END SECTION ( 21") CALC. TO: 1, PAY TO: 1

0817 054578 EACH END SECTION ( 21") (CS) CALC. TO: 1, PAY TO: 1

0817 054576 EACH END SECTION ( 21") (RC) CALC. TO: 1, PAY TO: 1

0817 054600 EACH END SECTION ( 24") CALC. TO: 1, PAY TO: 1

0817 011488 EACH END SECTION ( 24") (ACS) CALC. TO: 1, PAY TO: 1

0817 054602 EACH END SECTION ( 24") (CS) CALC. TO: 1, PAY TO: 1

0817 054615 EACH END SECTION ( 24") (CS) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054613 EACH END SECTION ( 24") (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054601 EACH END SECTION ( 24") (RC) CALC. TO: 1, PAY TO: 1

0817 054614 EACH END SECTION ( 24") (RC) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054609 EACH END SECTION ( 24") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 054625 EACH END SECTION ( 27") CALC. TO: 1, PAY TO: 1

0817 054628 EACH END SECTION ( 27") (CS) CALC. TO: 1, PAY TO: 1

0817 054626 EACH END SECTION ( 27") (RC) CALC. TO: 1, PAY TO: 1

0817 055100 EACH END SECTION ( 3.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055103 EACH END SECTION ( 3.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055101 EACH END SECTION ( 3.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055107 EACH END SECTION ( 3.0 SQ.FT.) (RCHE)(INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054650 EACH END SECTION ( 30") CALC. TO: 1, PAY TO: 1

0817 054652 EACH END SECTION ( 30") (CS) CALC. TO: 1, PAY TO: 1

0817 054662 EACH END SECTION ( 30") (CS) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 054657 EACH END SECTION ( 30") (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054651 EACH END SECTION ( 30") (RC) CALC. TO: 1, PAY TO: 1

0817 054646 EACH END SECTION ( 30") (RC) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054661 EACH END SECTION ( 30") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 054675 EACH END SECTION ( 33") CALC. TO: 1, PAY TO: 1

0817 054678 EACH END SECTION ( 33") (CS) CALC. TO: 1, PAY TO: 1

0817 054676 EACH END SECTION ( 33") (RC) CALC. TO: 1, PAY TO: 1

0817 054700 EACH END SECTION ( 36") CALC. TO: 1, PAY TO: 1

0817 054546 EACH END SECTION ( 36") (ACS) CALC. TO: 1, PAY TO: 1

0817 054702 EACH END SECTION ( 36") (CS) CALC. TO: 1, PAY TO: 1

0817 054709 EACH END SECTION ( 36") (CS) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054701 EACH END SECTION ( 36") (RC) CALC. TO: 1, PAY TO: 1

0817 054714 EACH END SECTION ( 36") (RC) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054715 EACH END SECTION ( 36") (RC) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 054711 EACH END SECTION ( 36") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 055125 EACH END SECTION ( 4.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 052103 EACH END SECTION ( 4.0 SQ.FT.) (ACSMA) CALC. TO: 1, PAY TO: 1

0817 055128 EACH END SECTION ( 4.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055126 EACH END SECTION ( 4.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055185 EACH END SECTION ( 4.4 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 054725 EACH END SECTION ( 42") CALC. TO: 1, PAY TO: 1

0817 054728 EACH END SECTION ( 42") (CS) CALC. TO: 1, PAY TO: 1

0817 054740 EACH END SECTION ( 42") (CS) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054732 EACH END SECTION ( 42") (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054742 EACH END SECTION ( 42") (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 054726 EACH END SECTION ( 42") (RC) CALC. TO: 1, PAY TO: 1

0817 054739 EACH END SECTION ( 42") (RC) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054745 EACH END SECTION ( 42") (RC) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 054735 EACH END SECTION ( 42") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 054750 EACH END SECTION ( 48") CALC. TO: 1, PAY TO: 1

0817 054754 EACH END SECTION ( 48") (ACS) CALC. TO: 1, PAY TO: 1

0817 054752 EACH END SECTION ( 48") (CS) CALC. TO: 1, PAY TO: 1

0817 054751 EACH END SECTION ( 48") (RC) CALC. TO: 1, PAY TO: 1

0817 054764 EACH END SECTION ( 48") (RC) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 054770 EACH END SECTION ( 48") (RC) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 051771 EACH END SECTION ( 48") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 055150 EACH END SECTION ( 5.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 052101 EACH END SECTION ( 5.0 SQ.FT.) (ACSMA) CALC. TO: 1, PAY TO: 1

0817 055153 EACH END SECTION ( 5.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055151 EACH END SECTION ( 5.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055157 EACH END SECTION ( 5.0 SQ.FT.) (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 054775 EACH END SECTION ( 54") CALC. TO: 1, PAY TO: 1

0817 054778 EACH END SECTION ( 54") (CS) CALC. TO: 1, PAY TO: 1

0817 054776 EACH END SECTION ( 54") (RC) CALC. TO: 1, PAY TO: 1

0817 054783 EACH END SECTION ( 54") (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 055175 EACH END SECTION ( 6.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055178 EACH END SECTION ( 6.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055182 EACH END SECTION ( 6.0 SQ.FT.) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 055184 EACH END SECTION ( 6.0 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 055176 EACH END SECTION ( 6.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055183 EACH END SECTION ( 6.0 SQ.FT.) (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 054800 EACH END SECTION ( 60") CALC. TO: 1, PAY TO: 1

0817 054802 EACH END SECTION ( 60") (CS) CALC. TO: 1, PAY TO: 1

0817 054801 EACH END SECTION ( 60") (RC) CALC. TO: 1, PAY TO: 1

0817 054825 EACH END SECTION ( 66") CALC. TO: 1, PAY TO: 1

0817 054828 EACH END SECTION ( 66") (CS) CALC. TO: 1, PAY TO: 1

0817 054826 EACH END SECTION ( 66") (RC) CALC. TO: 1, PAY TO: 1

0817 055200 EACH END SECTION ( 7.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055203 EACH END SECTION ( 7.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055207 EACH END SECTION ( 7.0 SQ.FT.) (CSMA) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 055208 EACH END SECTION ( 7.0 SQ.FT.) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 055201 EACH END SECTION ( 7.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 054850 EACH END SECTION ( 72") CALC. TO: 1, PAY TO: 1

0817 054853 EACH END SECTION ( 72") (CS) CALC. TO: 1, PAY TO: 1

0817 054851 EACH END SECTION ( 72") (RC) CALC. TO: 1, PAY TO: 1

0817 055225 EACH END SECTION ( 8.5 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055228 EACH END SECTION ( 8.5 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055237 EACH END SECTION ( 8.5 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 055226 EACH END SECTION ( 8.5 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055232 EACH END SECTION ( 8.5 SQ.FT.) (TYPE IV) CALC. TO: 1, PAY TO: 1

0817 055234 EACH END SECTION ( 8.8 SQ.FT.) (RCA) CALC. TO: 1, PAY TO: 1

0817 054858 EACH END SECTION ( 84") (CS) CALC. TO: 1, PAY TO: 1

0817 054859 EACH END SECTION ( 84") (RC) CALC. TO: 1, PAY TO: 1

0817 071269 EACH END SECTION ( 96") (CS) CALC. TO: 1, PAY TO: 1

0817 054860 EACH END SECTION ( 96") (RC) CALC. TO: 1, PAY TO: 1

0817 055250 EACH END SECTION (10.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055253 EACH END SECTION (10.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055251 EACH END SECTION (10.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055260 EACH END SECTION (10.0 SQ.FT.) (RCHE) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 055270 EACH END SECTION (10.0 SQ.FT.) (RCHE) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 055377 EACH END SECTION (10.5 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055275 EACH END SECTION (11.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055278 EACH END SECTION (11.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055276 EACH END SECTION (11.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055300 EACH END SECTION (12.5 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055303 EACH END SECTION (12.5 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055301 EACH END SECTION (12.5 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055320 EACH END SECTION (12.5 SQ.FT.) (RCHE) (INSTALL ONLY) CALC. TO: 1, PAY TO: 1

0817 055310 EACH END SECTION (12.5 SQ.FT.) (RCHE) (PROVIDE ONLY) CALC. TO: 1, PAY TO: 1

0817 055325 EACH END SECTION (14.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055324 EACH END SECTION (14.0 SQ.FT.) (ACSMA) CALC. TO: 1, PAY TO: 1

0817 055328 EACH END SECTION (14.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055326 EACH END SECTION (14.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055350 EACH END SECTION (16.5 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055353 EACH END SECTION (16.5 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055351 EACH END SECTION (16.5 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 071680 EACH END SECTION (19.5 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055376 EACH END SECTION (20.5 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 055390 EACH END SECTION (21.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055380 EACH END SECTION (21.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055381 EACH END SECTION (21.0 SQ.FT.) (RCHE) CALC. TO: 1, PAY TO: 1

0817 023993 EACH END SECTION (25.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 055396 EACH END SECTION (25.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 055395 EACH END SECTION (26.0 SQ.FT.) CALC. TO: 1, PAY TO: 1

0817 071749 EACH END SECTION (32.0 SQ.FT.) (CSMA) CALC. TO: 1, PAY TO: 1

0817 050075 LNFT ENTRANCE PIPE ( 6") CALC. TO: 0.10, PAY TO: 1

0817 050077 LNFT ENTRANCE PIPE ( 6") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 050175 LNFT ENTRANCE PIPE ( 8") CALC. TO: 0.10, PAY TO: 1

0817 050178 LNFT ENTRANCE PIPE ( 8") (CAP) CALC. TO: 0.10, PAY TO: 1

0817 050177 LNFT ENTRANCE PIPE ( 8") (CSP) CALC. TO: 0.10, PAY TO: 1

0817 017701 LNFT ENTRANCE PIPE ( 8") (CSP) (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016001 LNFT ENTRANCE PIPE ( 8") (CSP) (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 017700 LNFT ENTRANCE PIPE ( 8") (INSTALL ONLY) CALC. TO: 0.10, PAY TO: 1

0817 016000 LNFT ENTRANCE PIPE ( 8") (PROVIDE ONLY) CALC. TO: 0.10, PAY TO: 1

0817 052575 LNFT ENTRANCE PIPE ( 1.0 SQ.FT.) CALC. TO: 0.10, PAY TO: 1

0817 052577 LNFT ENTRANCE PIPE ( 1.0 SQ.FT.) (CSMAC) CALC. TO: 0.10, PAY TO: 1

0817 052582 LNFT ENTRANCE PIPE ( 1.0 SQ.FT.) (RCPA) CALC. TO: 0.10, PAY TO: 1

0817 052576 LNFT ENTRANCE PIPE ( 1.0 SQ.FT.) (RCPHE)