May a mover exceed the maximum permissible standards?
|
Yes
However, in these cases, the combination will be processed as a "superload" (even though the GVW is below 150,000 pounds). Movers should plan for an extra amount of time to receive their permit(s). Generally, a "superload" analysis takes only a few days. Shorter routes and requests for routes that have been analyzed recently generally get turned around sooner than longer and older routes. |
|
|
|