|
Amelia Earhart Bridge Study
PROJECT DETAILS Scheduled for Fiscal Year 2003 Location U-59, Atchison County, Northeast KS Corridor: Amelia Earhart bridge (US-59 bridge) over Missouri River. Work Type Preliminary Engineering Scope of Work This a study project to determine a location and design concept for the bridge. See the link below under "Associated Projects" for information on the related project that will build the improvements based on the study results. Project Length 3.7 Miles Associated Projects
Project Description One of two projects to study and reconstruct and/or rehabilitate the Amelia Earhart Bridge (US-59 bridge over the Missouri River). See "Associated Projects" above for a link to the other project. To view the Environmental Impact Statement (EIS) , click on "Additional Information." Project Purpose To provide a structurally sound, operationally efficient, economically feasible, and safe Missouri River crossing for US Route 59 in the vicinity of Atchison and Buchanan County, Missouri; to provide a facility that is consistent with current design standards; and to accommodate and sustain economic development within the area and region. Project Need The Amelia Earhart Memorial Bridge is structuraly deficient and functionally obsolete (does not have shoulders). The existing bridge is congested during peak periods of flow, and the level of service is expected to degrade, based on forecasted traffic growth rates. Project Categories Category: System Enhancement Program Subcategory: System Enh. - Corridors |
KDOT Project No. K-8238-01
Please include the above project number on all correspondence