rev. 01/08/19

2015 SPECIAL PROVISION

 

  ALL   LATEST   100   150   200   300   400   500   600   700   800   900   MATERIALS   HELP

SECTION 800


 SPECIFICATION NUMBERTITLESECTION
    
 15-08001WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 402's)805
 15-08001-R01WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 402's)805
 15-08001-R02WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 402's)805
15-08001-R03WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 402's)805
 15-08003TIE BAR INSERTION (CROSS-STITCHING)800
 15-08004TAPERED PAVEMENT EDGE800
 15-08004-R01TAPERED PAVEMENT EDGE800
 15-08005DITCH LINING831
 15-08006COMPACTION GROUTING800
 15-08007COURTESY TOWING800
 15-08008RETAINING WALL SYSTEM853
 15-08009RESEALING JOINTS AND SEALING CRACKS IN EXISTING PCCP AND HMA PAVEMNTS835
15-08010PERMANENT SIGNING812
15-08010-R01PERMANENT SIGNING812
15-08011PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE837
15-08011-R01PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE837
15-08012UNDERDRAINS822
15-08013BASEDRAINS860
15-08014CONCRETE SAFETY BARRIER809
15-08015CONTRACTOR CONSTRUCTION STAKING802
15-08016PAVEMENT PATCHING833
15-08018MAINTENANCE AND RESTORATION OF HAUL ROADS804
15-08019WORK ZONE TRAFFIC CONTROL & SAFETY805