Kansas Department of Transportation "...to provide a statewide transportation system to meet the needs of Kansas."
    
 

KDOT SUMMARY OF QUANTITIES

                      KANSAS DEPARTMENT OF TRANSPORTATION          PAGE:   1                                                                                                                                                                                                                           
                           SUMMARY OF QUANTITIES               DATE: 05/15/13                                                                                                                                                                                                                               
                                                               TIME: 11:46 AM                                                                                                                                                                                                                               
LETTING DATE:       May 22, 2013                                                                                                                                                                                                                                                                            
                                                                                                                                                                                                                                                                                                            
            ************************************************************                                                                                                                                                                                                                                    
            *      PRIME CONTRACTORS SHALL NOTIFY KDOT OF THEIR        *                                                                                                                                                                                                                                    
            * INTENT TO BID BY IDENTIFYING THEMSELVES AS A BID HOLDER  *                                                                                                                                                                                                                                    
            ************************************************************                                                                                                                                                                                                                                    
                                                                                                                                                                                                                                                                                                            
QUANTITY    UNIT   ITEM DESCRIPTION                                                                                                                                                                                                                                                                         
----------------------------------------------------------------------------------------                                                                                                                                                                                                                    
                                                                                                                                                                                                                                                                                                            
                                                                                                                                                                                                                                                                                                            
            PROPOSAL NO: 513051111  STATE PROJECT NO: I070-105 KA 1003-05                                                                                                                                                                                                                                   
            WORKING DAYS: CCD  COMPLETION DATE: DECEMBER 23 2014 DBE GOAL: $1,500,000                                                                                                                                                                                                                       
            COUNTY: WYANDOTTE                                                                                                                                                                                                                                                                               
            GRADE, BRIDGE & SURFACING                                                                                                                                                                                                                                                                       
            WEST HALF OF THE I-70/K-7 INTERCHANGE                                                                                                                                                                                                                                                           
                                                                                                                                                                                                                                                                                                            
      1.00  LSUM   CONTRACTOR CONSTRUCTION STAKING                                                                                                                                                                                                                                                          
      1.00  EACH   FIELD OFFICE AND LABORATORY (TYPE A)                                                                                                                                                                                                                                                     
      1.00  CUYD   FOUNDATION STABILIZATION (SET PRICE)                                                                                                                                                                                                                                                     
      1.00  LSUM   MOBILIZATION                                                                                                                                                                                                                                                                             
      1.00  LSUM   MOBILIZATION (DBE)                                                                                                                                                                                                                                                                       
      1.00  LSUM   REMOVAL OF EXISTING STRUCTURES                                                                                                                                                                                                                                                           
      1.00  LSUM   MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE)                                                                                                                                                                                                                                    
   2720.00  HOUR   TRAINEES HIGHWAY CONSTRUCTION (SET PRICE)                                                                                                                                                                                                                                                
      1.00  CUYD   CONCRETE FOR SEAL COURSE (SET PRICE)                                                                                                                                                                                                                                                     
      1.00  HOUR   FLAGGER (SET PRICE)                                                                                                                                                                                                                                                                      
      1.00  LSUM   CLEANING EXISTING STRUCTURE                                                                                                                                                                                                                                                              
      1.00  LSUM   CLEARING AND GRUBBING                                                                                                                                                                                                                                                                    
 257719.00  SQYD   SALVAGED TOPSOIL                                                                                                                                                                                                                                                                         
 100298.00  CUYD   COMMON EXCAVATION (RURAL SMALL)                                                                                                                                                                                                                                                          
 438656.00  CUYD   COMMON EXCAVATION (CONTRACTOR FURNISHED)                                                                                                                                                                                                                                                 
  42582.00  CUYD   ROCK EXCAVATION                                                                                                                                                                                                                                                                          
      1.00  EACH   RESETTING END SECTION                                                                                                                                                                                                                                                                    
  26270.00  CUYD   COMPACTION OF EARTHWORK (TYPE  AA) (MR-0-5)                                                                                                                                                                                                                                              
 429710.00  CUYD   COMPACTION OF EARTHWORK (TYPE   A) (MR-5-5)                                                                                                                                                                                                                                              
      1.00  MGAL   WATER (GRADING) (SET PRICE)                                                                                                                                                                                                                                                              
  34446.00  CUYD   SPECIAL FILL (RETAINED SOIL)                                                                                                                                                                                                                                                             
    191.00  CUYD   FOUNDATION STABILIZATION                                                                                                                                                                                                                                                                 
     60.00  CUYD   GRANULAR BACKFILL (WINGWALLS)                                                                                                                                                                                                                                                            
    569.50  CUYD   CONCRETE (GRADE 4.0) (AE) (RCB)                                                                                                                                                                                                                                                          
  69850.00  LBS.   REINFORCING STEEL (GRADE 60)                                                                                                                                                                                                                                                             
     92.00  LNFT   CROSS ROAD PIPE ( 12") (RCP)                                                                                                                                                                                                                                                             
    216.00  LNFT   CROSS ROAD PIPE ( 15") (RCP)                                                                                                                                                                                                                                                             
    199.00  LNFT   CROSS ROAD PIPE ( 15")                                                                                                                                                                                                                                                                   
     84.00  LNFT   CROSS ROAD PIPE ( 18") (RCP)                                                                                                                                                                                                                                                             
    132.00  LNFT   CROSS ROAD PIPE ( 24") (RCP)                                                                                                                                                                                                                                                             
    308.00  LNFT   CROSS ROAD PIPE ( 30") (RCP)                                                                                                                                                                                                                                                             
    236.00  LNFT   CROSS ROAD PIPE ( 30")                                                                                                                                                                                                                                                                   
    196.00  LNFT   CROSS ROAD PIPE ( 36") (RCP)                                                                                                                                                                                                                                                             
     93.00  LNFT   CROSS ROAD PIPE ( 36")                                                                                                                                                                                                                                                                   
    174.00  LNFT   CROSS ROAD PIPE ( 42") (RCP)                                                                                                                                                                                                                                                             

KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 2 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 22.00 LNFT CROSS ROAD PIPE ( 42") (ACSP) 168.00 LNFT LINER PIPE ( 36") 59.00 LNFT LINER PIPE ( 15") 4.00 EACH END SECTION ( 12") (RC) 1.00 EACH END SECTION ( 15") (RC) 2.00 EACH END SECTION ( 15") 1.00 EACH END SECTION ( 18") (RC) 2.00 EACH END SECTION ( 24") (RC) 3.00 EACH END SECTION ( 30") (RC) 3.00 EACH END SECTION ( 30") 7.00 EACH END SECTION ( 36") (RC) 1.00 EACH END SECTION ( 36") 2.00 EACH END SECTION ( 42") (RC) 784.00 LNFT STORM SEWER (12") (RCP) 70.00 LNFT STORM SEWER (36") (RCP) 2.00 EACH MANHOLE (REINFORCED CONCRETE) 6.00 EACH INLET (MANHOLE) (SPECIAL) 3.00 EACH INLET (GUTTER) 5.00 EACH INLET (TYPE 12 CURB) 1.00 LSUM TEMPORARY SHORING 97.90 CUYD FLOWABLE FILL (LOW STRENGTH) 1025.00 LNFT GUARDRAIL, STEEL PLATE (MGS) 188.00 SQYD CONCRETE DITCH LINING 2856.00 TON AGGREGATE DITCH LINING ( 6") 3623.00 CUYD SLOPE PROTECTION (AGGREGATE) 1314.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 1436.00 CUYD BEDDING FOR SLOPE PROTECTION 371.00 LNFT SLOPE DRAIN (STONE) 5.00 EACH FLUME INLET (CONCRETE) 1.00 LSUM TRANSPORTING SALVAGEABLE MATERIAL 41.00 EACH RIGHT-OF-WAY SURVEY MONUMENT 1.00 EACH MONUMENT BOX 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 1.00 EACH GUARDRAIL END TERMINAL (MGS-ET-PLUS) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 1.00 EACH GUARDRAIL END TERMINAL (MGS-SKT) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 6.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 3 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 6.00 EACH GUARDRAIL END TERMINAL (MGS-SRT) -------------------------------------------------------------------------------- 29544.00 SQFT RETAINING WALL (MBW) 10100.00 LBS. TEMPORARY FERTILIZER (15-30-15) 1515.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 2525.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 49.30 LBS. SOIL EROSION MIX 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 7070.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 9907.00 SQYD EROSION CONTROL (CLASS 2) (TYPE E) 50.00 ACRE MULCHING (TACKING SLURRY) 101.00 ACRE MULCHING (TEMPORARY) 239.00 CUYD CLASS III EXCAVATION 104.70 CUYD CONCRETE (GRADE 4.0) (AE) 319.30 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 97330.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 790.00 LNFT PRESTRESSED CONCRETE BEAM (K4) 300.00 LNFT PILES (STEEL) (HP12X53) 35.00 LNFT TEST PILES (SPECIAL) (HP12X53) 64.00 LNFT DRILLED SHAFT ( 48") (CASED) 1.00 EACH SONIC TEST (DRILLED SHAFT) (SET PRICE) 87.00 CUYD ABUTMENT AGGREGATE DRAIN 106.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 772.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 46.00 LNFT CORE HOLE (INVESTIGATIVE) 334.00 CUYD SLOPE PROTECTION (AGGREGATE) 1.00 LSUM FALSEWORK INSPECTION 259.00 CUYD CLASS III EXCAVATION 248.20 CUYD CONCRETE (GRADE 4.0) (AE) 670.10 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 257930.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 40962.00 LBS. STRUCTURAL STEEL (A709) (GR 50W) 549217.00 LBS. STRUCTURAL STEEL (M270) (GR 50WT3) 8460.00 EACH WELDED STUD SHEAR CONNECTORS 18.00 EACH BEARING (STEEL REINFORCED ELASTOMERIC) 390.00 LNFT PILES (STEEL) (HP12X53) 193.00 LNFT DRILLED SHAFT ( 66") (CASED) 1.00 EACH SONIC TEST (DRILLED SHAFT) (SET PRICE) 60.00 LNFT CORE HOLE (INVESTIGATIVE) 2004.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 4 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 121.00 CUYD ABUTMENT AGGREGATE DRAIN 98.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 413.00 CUYD SLOPE PROTECTION (AGGREGATE) 1.00 LSUM FALSEWORK INSPECTION -------------------------------------------------------------------------------- ALTERNATE SECTION: CC1 63603.00 SQYD CEMENT TREATED BASE 63603.00 SQYD QUALITY CONTROL TESTING (CTB) -------------------------------------------------------------------------------- ALTERNATE SECTION: CC2 63603.00 SQYD ASPHALT TREATED BASE 13833.00 TON QUALITY CONTROL TESTING (HMA) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 EACH ASPHALT CORE (SET PRICE) 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT -------------------------------------------------------------------------------- 2619.00 LNFT CURB AND GUTTER, COMBINED (AE) 427.00 LNFT GUTTERS (AE) 344.00 LNFT CONCRETE SAFETY BARRIER (TYPE I-F) 1497.00 LNFT CONCRETE SAFETY BARRIER (TYPE II-F) 21.00 LNFT CONCRETE SAFETY BARRIER (TRANSITION) 22251.00 SQYD CONCRETE PAVEMENT (11" UNIFORM) (AE) (NRDJ) 3923.00 SQYD CONCRETE PAVEMENT (11" VARIABLE) (AE) (PLAIN) 736.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 24251.00 SQYD CONCRETE PAVEMENT ( 9.5" UNIFORM) (AE) (NRDJ) 7673.00 SQYD CONCRETE PAVEMENT ( 9.5" VARIABLE) (AE) (PLAIN) 1324.00 SQYD CONCRETE PAVEMENT ( 4" UNIFORM) (AE) (PLAIN) 109.60 CUYD BRIDGE APPROACH SLAB FOOTING 58827.00 SQYD QUALITY CONTROL TESTING (PCCP) 1.00 EACH CONCRETE CORE (SET PRICE) 1.00 LSUM CONCRETE PAVEMENT SMOOTHNESS 1.00 LSUM CONCRETE PAVEMENT COMPOSITE PAY ADJUSTMENT 730.00 TON LIME 1.00 MGAL WATER (LIME TREATED SUBGRADE) (SET PRICE) 55498.00 SQYD MANIPULATION (LIME TREATED SUBGRADE) 6289.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 3013.00 TON HMA SURFACE (SR-12.5A) (PG 70-28) 6114.00 TON HMA BASE (SR-12.5A) (PG 64-22) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 10.00 TON EMULSIFIED ASPHALT (SS-1HP) 9127.00 TON QUALITY CONTROL TESTING (HMA) 2961.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 EACH ASPHALT CORE (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 5 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 3884.00 SQYD AGGREGATE BASE (AB-3) ( 6") 2841.00 SQYD AGGREGATE BASE (AB-3) ( 4") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 169.00 TON SURFACING MATERIAL (AB-3) 456.00 TON FLY ASH 11240.00 SQYD MANIPULATION FOR IN-PLACE SUBGRADE MODIFICATION (FLY ASH) 1.00 MGAL WATER (SUBGRADE MODIFICATION) (SET PRICE) 3239.00 CUYD AGGREGATE FOR SUBGRADE MODIFICATION (MILLINGS) 1915.00 TON MILLING 15532.00 SQYD DRAINABLE BASE (UNBOUND) ( 4") 1.00 MGAL WATER (BASE) (SET PRICE) 8892.00 LNFT FENCE (WOVEN WIRE) (TYPE B) 2.00 EACH GATE (WOVEN WIRE FENCE) (16') 30.00 EACH POSTS (CORNER) (WOVEN WIRE TYPE B) 22.00 EACH POSTS (END) (WOVEN WIRE TYPE B) 9.00 EACH POSTS (PULL) (WOVEN WIRE TYPE B) 955.90 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 4792.80 SQFT SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) 1298.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 273.00 LNFT SIGN POST (4" X 6" WOOD) (REINFORCED PANEL SIGN) 13.00 LNFT SIGN POST (3 LB/FT "U" STEEL) 48.00 LNFT SIGN POST (3 I 2.25 ALUMINUM) 457.00 LNFT SIGN POST (W 6 X 9 STEEL BEAM) 153.00 LNFT SIGN POST (W10X12 STEEL BEAM) 697.00 LNFT SIGN POST (W10X22 STEEL BEAM) 28.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W 6 X 9) 8.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X12) 29.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X22) 28.00 EACH SIGN POST BREAKAWAY BASE PLATE (W 6 X 9) 8.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X12) 29.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X22) 232.00 LNFT SIGN POST FOOTING (24" STEEL BEAM POST CONCRETE) 319.00 LNFT SIGN POST FOOTING (30" STEEL BEAM POST CONCRETE) 93.00 LNFT SIGN POST FOOTING (18" WOOD POST CONCRETE) 4.00 EACH SIGNING OBJECT MARKER (TYPE 2) 93.00 EACH SIGNING DELINEATOR (TYPE A) (WHITE RIGID "U" POST) 57.00 EACH SIGNING DELINEATOR (TYPE B) (WHITE RIGID "U" POST) 2.00 EACH SIGNING DELINEATOR (TYPE A) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) 1.00 EACH BRIDGE MOUNTED SIGN ATTACHMENT (20.1'-25.0') (STEEL) 1.00 EACH OVHD SN STR (MAST ARM TYPE) (45.1'-50.0') (STEEL) 1.00 EACH OVHD SN STR (MAST ARM TYPE) (50.1'-55.0') (STEEL) 1.00 EACH OVERHEAD SIGN STRUCTURE ( 90.1'-100.0') (ALUMINUM) 1.00 LSUM SIGN (REMOVE AND RESET) 42012.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 4413.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 391.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 6 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 10506.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 27886.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 2390.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 180.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 3.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (THRU ARROW) 32.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 13.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 4.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (ONLY) 1.00 LSUM ELECTRIC LIGHTING SYSTEM 4.00 EACH HIGH MAST LIGHT TOWER (100') (36" CONCRETE BASE) 1.00 LSUM TRAFFIC SIGNAL INTERCONNECT 1.00 LSUM TRAFFIC SIGNAL 1.00 LSUM VIDEO DETECTION SYSTEM 17600.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 25200.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 2800.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 20400.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 39600.00 EADA CHANNELIZER (FIXED) 87200.00 EADA CHANNELIZER (PORTABLE) 8800.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 400.00 EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) 800.00 EADA ARROW DISPLAY 805.20 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 66.10 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 9.90 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE I TAPE OR PAINT) 24249.00 LNFT PAVEMENT MARKING REMOVAL 8950.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 32238.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 4.00 EACH INERTIAL BARRIER SYSTEM 50.00 EACH REPLACEMENT MODULES 2.00 EACH WORK ZONE SIGN (SPECIAL) (16.25 SQ.FT. & LESS) 50.00 EACH TEMPORARY RAISED PAVEMENT MARKER (TYPE II) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 4.00 EACH TWORKS SIGN ASSEMBLY (LARGE) PROPOSAL NO: 513052071 STATE PROJECT NO: I035-046 KA 1002-07 WORKING DAYS: 5 COMPLETION DATE: DBE GOAL: $0 COUNTY: JOHNSON SEEDING I-35 FROM 119TH ST N TO I-435/I-35/K-10 INTER 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 2292.00 LBS. FERTILIZER (15-30-15) 4126.00 LBS. SEED (FESCUE) (TALL TURF TYPE BLEND) 54.50 LBS. SEED (NATIVE WILDFLOWER MIX 4) 1.00 ACRE MULCHING (PERMANENT) (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 7 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 513052091 STATE PROJECT NO: U169-046 KA 3290-01 WORKING DAYS: 30 COMPLETION DATE: DBE GOAL: $0 COUNTY: JOHNSON PAVEMENT MARKING US-169:175TH ST N TO S I-35 INTERCHANGE 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 41795.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 30321.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 39.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 20.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 70.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 312.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 72498.00 LNFT PAVEMENT MARKING REMOVAL 1.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (ONLY) PROPOSAL NO: 513052151 STATE PROJECT NO: I435-105 KA 2831-01 WORKING DAYS: 35 COMPLETION DATE: DBE GOAL: $0 COUNTY: WYANDOTTE LIGHTING I-435 & K-5 IN WYANDOTTE CO 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM ELECTRIC LIGHTING SYSTEM 4.00 EACH HIGH MAST LIGHT TOWER (100') PROPOSAL NO: 513052212 STATE PROJECT NO: U081-015 KA 3283-01 WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: $0 COUNTY: CLOUD PAVEMENT MARKING, STATE TIE: 81-79 KA 3284-01 US-81: CONCORDIA SCL N TO RP CO L 1.00 LSUM MOBILIZATION 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 61592.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 26451.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 38726.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 566.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 1763.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (12") 860.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24")
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 8 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 12.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 81.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (ONLY) 129958.00 LNFT PAVEMENT MARKING REMOVAL PROPOSAL NO: 513052232 STATE PROJECT NO: U081-079 KA 3284-01 WORKING DAYS: 45 COMPLETION DATE: DBE GOAL: $0 COUNTY: REPUBLIC PAVEMENT MARKING, STATE TIE: 81-15 KA 3283-01 US-81: CD CO L N TO NE STATE L 185217.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 15444.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 4") 131625.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 843.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 240.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 27.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 5.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 40.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 2443.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 335839.00 LNFT PAVEMENT MARKING REMOVAL PROPOSAL NO: 513052252 STATE PROJECT NO: K028-045 KA 0022-01 WORKING DAYS: 75 COMPLETION DATE: DBE GOAL: $4,000 COUNTY: JEWELL GRADE, BRIDGE & SURFACING BUFFALO CR DRAINAGE BR (037), 2.5 M W OF JW/CD CO L 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 317.00 CUYD TRANSPORTING SALVAGEABLE MATERIAL 1.00 LSUM CLEARING AND GRUBBING 1484.00 CUYD COMMON EXCAVATION (RURAL SMALL) 769.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 205.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 4605.00 SQYD SALVAGED TOPSOIL 49.00 TON AGGREGATE DITCH LINING ( 4") 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 8.00 EACH RIGHT-OF-WAY SURVEY MONUMENT 0.10 PMPS MOWING 1.00 LSUM TEMPORARY SEEDING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 9 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 52.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 359.00 CUYD CLASS III EXCAVATION (RCB) 282.90 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR) 2520.00 LBS. REINFORCING STEEL (GRADE 60) 58140.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 83.00 CUYD FOUNDATION STABILIZATION 57.00 CUYD GRANULAR BACKFILL (WINGWALLS) 140.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 339.00 TON HMA-COMMERCIAL GRADE (CLASS A) 77.00 TON SURFACING MATERIAL (AB-3) 205.00 TON MILLING 205.00 TON TRANSPORTING SALVAGEABLE MATERIAL (5-8MI) 1.00 LSUM SEEDING 14410.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 1650.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 2420.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 3300.00 EADA CHANNELIZER (PORTABLE) 2860.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) PROPOSAL NO: 513052272 STATE PROJECT NO: K143-085 KA 0036-01 WORKING DAYS: 90 COMPLETION DATE: DBE GOAL: $44,000 COUNTY: SALINE GRADE, BRIDGE & SURFACING MULBERRY CRK DRAINAGE BR (100); 0.5 MI N of JCT US-40/K-143 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 7876.00 CUYD COMMON EXCAVATION (RURAL SMALL) 3452.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 608.00 CUYD ROCK EXCAVATION 802.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 7389.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 6880.00 SQYD SALVAGED TOPSOIL
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 10 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 34.00 LNFT CROSS ROAD PIPE ( 18") 2.00 EACH END SECTION ( 18") 4.00 EACH END SECTION ( 24") 2.00 EACH END SECTION ( 24") (ACS) 137.00 LNFT ENTRANCE PIPE ( 24") 50.00 LNFT ENTRANCE PIPE ( 24") (CSP) 668.00 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE 92.00 TON AGGREGATE DITCH LINING ( 6") 492.00 CUYD SLOPE PROTECTION (SHOT ROCK) 80.00 CUYD GABIONS 250.00 LBS. TEMPORARY FERTILIZER (15-30-15) 38.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 63.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 175.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 2.50 ACRE MULCHING (TACKING SLURRY) 2.50 ACRE MULCHING (TEMPORARY) 285.00 CUYD CLASS III EXCAVATION (RCB) 718.50 CUYD CONCRETE (GRADE 4.0) (RCB BR) 107790.00 LBS. REINFORCING STEEL (GRADE 60) 136.00 CUYD FOUNDATION STABILIZATION 388.00 CUYD GRANULAR BACKFILL (WINGWALLS) 1.00 LSUM TEMPORARY SHORING 943.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1397.00 SQYD AGGREGATE BASE (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 73.00 CUYD LIGHT TYPE SURFACING (SA-1 OR SA-X) 26.00 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 54.00 LNFT SIGN POST (2" PERFORATED SQUARE STEEL TUBE) 8.00 EACH SIGN POST FOOTING ( 2" PERFORATED SQUARE STEEL TUBE) 2.00 EACH BARRICADE (TYPE III) (FIXED) 129.00 LBS. FERTILIZER (15-30-15) 2.10 LBS. SEED (BUFFALO GRASS) (TREATED) 0.10 LBS. SEED (BLUE GRAMA GRASS) (LOVINGTON) 6.30 LBS. SEED (CANADA WILD-RYE) 0.20 LBS. SEED (SAND DROPSEED) 6.80 LBS. SEED (SAND BLUESTEM GRASS) (GARDEN COUNTY) 0.30 LBS. SEED (SAND LOVEGRASS) (BEND) 3.50 LBS. SEED (SIDE OATS GRAMA) (EL RENO) 1.50 LBS. SEED (SWITCHGRASS) (BLACKWELL) 12.10 LBS. SEED (STERILE WHEATGRASS) 5.90 LBS. SEED (WESTERN WHEATGRASS) (BARTON) 16.80 LBS. SEED (NATIVE WILDFLOWER MIX 2)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 11 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 ACRE MULCHING (PERMANENT) (SET PRICE) 1200.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 4200.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 6000.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 1200.00 EADA CHANNELIZER (FIXED) 33600.00 EADA CHANNELIZER (PORTABLE) 6600.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 120.00 EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) 120.00 EADA ARROW DISPLAY 196.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 8.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE I TAPE OR PAINT) 10940.00 LNFT PAVEMENT MARKING REMOVAL 875.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 475.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 2.00 EACH INERTIAL BARRIER SYSTEM 14.00 EACH REPLACEMENT MODULES 24.00 EACH TEMPORARY RAISED PAVEMENT MARKER (TYPE II) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) PROPOSAL NO: 513052292 STATE PROJECT NO: I070-106 KA 1893-01 WORKING DAYS: 80 COMPLETION DATE: DBE GOAL: $40,000 COUNTY: DICKINSON ELLSWORTH GEARY SIGNING I-70: DISTRICT 2: ELLSWORTH, LINCOLN, SALINE, DICKINSON AND GEARY COUNTIES 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM MOBILIZATION 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM TRAFFIC CONTROL 525.00 LNFT GUARDRAIL, STEEL PLATE (MGS) 163.00 TON SURFACING MATERIAL (AB-3) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 3.00 EACH GUARDRAIL END TERMINAL (MGS-SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 3.00 EACH GUARDRAIL END TERMINAL (MGS-FLEAT) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 2.00 EACH GUARDRAIL END TERMINAL (MGS-ET-PLUS)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 12 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 2.00 EACH GUARDRAIL END TERMINAL (MGS-SKT) -------------------------------------------------------------------------------- 4036.18 SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) 15983.50 SQFT SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) 5511.00 LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) 1249.00 LNFT SIGN POST (4" X 6" WOOD) (REINFORCED PANEL SIGN) 162.00 LNFT SIGN POST (3 LB/FT "U" STEEL) 1526.00 LNFT SIGN POST (W 6 X 9 STEEL BEAM) 1144.00 LNFT SIGN POST (W10X12 STEEL BEAM) 1834.00 LNFT SIGN POST (W10X22 STEEL BEAM) 90.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W 6 X 9) 60.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X12) 76.00 EACH SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X22) 90.00 EACH SIGN POST BREAKAWAY BASE PLATE (W 6 X 9) 60.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X12) 76.00 EACH SIGN POST BREAKAWAY BASE PLATE (W10X22) 1020.00 LNFT SIGN POST FOOTING (24" STEEL BEAM POST CONCRETE) 836.00 LNFT SIGN POST FOOTING (30" STEEL BEAM POST CONCRETE) 843.00 LNFT SIGN POST FOOTING (18" WOOD POST CONCRETE) 1.00 LSUM SIGN (REMOVE AND RESET) 1.00 EACH OVERHEAD SIGN STRUCTURE ( 80.1'- 90.0') (ALUMINUM) 3.00 EACH CANTILEVER SIGN STRUCTURE (25.1'-30.0') (STEEL) 1.00 EACH CANTILEVER SIGN STRUCTURE (30.1'-35.0') (STEEL) PROPOSAL NO: 513054091 STATE PROJECT NO: 052 C 0327-01 WORKING DAYS: 100 COMPLETION DATE: DBE GOAL: $45,000 COUNTY: LEAVENWORTH GRADE, BRIDGE & SURFACING 178TH ST OVER HOG CR 2.8 MI W & .4 MI S OF BASEHOR 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 793.00 CUYD COMMON EXCAVATION (RURAL SMALL) 23.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 13 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 253.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 64.00 LNFT CROSS ROAD PIPE ( 30") 32.00 LNFT ENTRANCE PIPE ( 18") 2.00 EACH END SECTION ( 30") 2.00 EACH END SECTION ( 18") 100.00 LNFT GUARDRAIL, STEEL PLATE 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) 126.00 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 4.00 EACH GUARDRAIL END TERMINAL (SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 4.00 EACH GUARDRAIL END TERMINAL (FLEAT) -------------------------------------------------------------------------------- 1.00 LSUM TEMPORARY SEEDING 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 4.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 222.00 CUYD CLASS I EXCAVATION 245.00 CUYD CLASS II EXCAVATION 94.20 CUYD CONCRETE (GRADE 4.0) (AE) 258.20 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 70490.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 12030.00 LBS. REINFORCING STEEL (GRADE 60) 168.00 LNFT PILES (STEEL) (HP10X42) 18.00 CUYD ABUTMENT AGGREGATE DRAIN 40.00 SQYD BRIDGE BACKWALL PROTECTION SYSTEM 720.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 8.00 EACH CAST STEEL PILE POINTS 125.00 LNFT PRE-DRILLED PILE HOLES 84.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 263.00 TON SURFACING MATERIAL (SA-1) 2235.00 SQYD CRUSHED STONE SUBGRADE ( 6") 2235.00 SQYD AGGREGATE BASE (AB-3) ( 4") 1.00 MGAL WATER (CRUSHED STONE SUBGRADE) (SET PRICE) 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 1.00 LSUM SEEDING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 14 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 513054111 STATE PROJECT NO: 081 C 0314-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: $10,000 COUNTY: RILEY GUARDRAIL REPLACE GUARDRAIL & BRIDGE RAILS AT VARIOUS LOC 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 99.00 CUYD COMMON EXCAVATION (RURAL SMALL) 1035.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 907.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) 1.00 MGAL WATER (GRADING) (SET PRICE) 1600.00 LNFT GUARDRAIL, STEEL PLATE 1164.75 LNFT GUARDRAIL, REMOVAL OF STEEL PLATE 1389.00 SQYD AGGREGATE SHOULDER (AB-3) ( 6") 1.00 MGAL WATER (AGGREGATE SHOULDERS) (SET PRICE) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 7.00 EACH GUARDRAIL END TERMINAL (SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 7.00 EACH GUARDRAIL END TERMINAL (FLEAT) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB1 1.00 EACH GUARDRAIL END TERMINAL (ET-PLUS) -------------------------------------------------------------------------------- ALTERNATE SECTION: BB2 1.00 EACH GUARDRAIL END TERMINAL (SKT) -------------------------------------------------------------------------------- 1.00 LSUM TEMPORARY SEEDING 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 70.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 1.00 LSUM SEEDING 490.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 15 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 385.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 2730.00 EADA CHANNELIZER (PORTABLE) 1.00 EACH INERTIAL BARRIER SYSTEM 5.00 EACH REPLACEMENT MODULES 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) PROPOSAL NO: 513054171 STATE PROJECT NO: 105 N 0556-01 WORKING DAYS: 100 COMPLETION DATE: DBE GOAL: $70,000 COUNTY: WYANDOTTE GRADE, BRIDGE & SURFACING WY CO, N 55TH ST, REPLACE TWO BOX BRIDGES 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 1189.00 CUYD COMMON EXCAVATION (RURAL SMALL) 319.00 CUYD ROCK EXCAVATION 220.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 15.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 2.00 EACH END SECTION ( 1.0 SQ.FT.) 18.00 LNFT ENTRANCE PIPE ( 1.0 SQ.FT.) 36.00 LNFT SLOPE DRAIN (STONE) 300.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 92.00 CUYD SLOPE PROTECTION (GABION) 8.00 EACH SIGNING OBJECT MARKER (TYPE 3) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 1.00 LSUM TEMPORARY SEEDING 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 28.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 99.30 CUYD CONCRETE (GRADE 4.0) (RCB BR) 53.40 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR) 3510.00 LBS. REINFORCING STEEL (GRADE 60) 28060.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 375.00 CUYD CLASS III EXCAVATION (RCB) 39.00 CUYD FOUNDATION STABILIZATION 49.00 CUYD GRANULAR BACKFILL (WINGWALLS) 121.00 LNFT FENCE (CHAIN LINK) ( 4'-0") (SPECIAL) 1.00 LSUM TEMPORARY SHORING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 16 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 117.90 CUYD CONCRETE (GRADE 4.0) (RCB BR) 60.50 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR) 3890.00 LBS. REINFORCING STEEL (GRADE 60) 37290.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 530.00 CUYD CLASS III EXCAVATION (RCB) 50.00 CUYD FOUNDATION STABILIZATION 96.00 CUYD GRANULAR BACKFILL (WINGWALLS) 132.00 LNFT FENCE (CHAIN LINK) ( 4'-0") (SPECIAL) 1.00 LSUM TEMPORARY SHORING 1599.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (NRDJ) 187.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 77.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (PLAIN) 62.60 CUYD CONCRETE (GRADE 4.0) (AE) 1900.00 SQYD AGGREGATE BASE (AB-3) ( 4") 95.00 SQYD AGGREGATE SHOULDER (AS-1) ( 6") 39.00 CUYD BRIDGE APPROACH SLAB FOOTING 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 1.00 MGAL WATER (AGGREGATE SHOULDERS) (SET PRICE) 38.00 TON HMA-COMMERCIAL GRADE (CLASS A) 116.00 SQYD AGGREGATE BASE (AB-3) ( 4") 624.00 LNFT FENCE (WOVEN WIRE) (TYPE B) 6.00 EACH POSTS (END) (WOVEN WIRE TYPE B) 11.00 EACH POSTS (CORNER) (WOVEN WIRE TYPE B) 1.00 LSUM SEEDING 2550.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 1950.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 12300.00 EADA CHANNELIZER (PORTABLE) 16.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1600.00 LNFT PAVEMENT MARKING REMOVAL 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) PROPOSAL NO: 513054515 STATE PROJECT NO: 005 C 4198-01 WORKING DAYS: 120 COMPLETION DATE: DBE GOAL: $7,000 COUNTY: BARTON GRADE & BRIDGE 0.3 MI S & 1.5 MI E OF GREAT BEND 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 17 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM CLEARING AND GRUBBING 5151.00 CUYD COMMON EXCAVATION (RURAL SMALL) 1225.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) 1.00 MGAL WATER (GRADING) (SET PRICE) 100.00 LNFT GUARDRAIL, STEEL PLATE 144.00 LNFT ENTRANCE PIPE ( 2.5 SQ.FT.) 8.00 EACH END SECTION ( 2.5 SQ.FT.) 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 4.00 EACH GUARDRAIL END TERMINAL (SRT) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 4.00 EACH GUARDRAIL END TERMINAL (FLEAT) -------------------------------------------------------------------------------- 210.00 LBS. TEMPORARY FERTILIZER (16-20- 0) 32.00 LBS. TEMPORARY SEED (CANADA WILDRYE) 53.00 LBS. TEMPORARY SEED (STERILE WHEATGRASS) 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 220.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 2.10 ACRE MULCHING (TEMPORARY) 98.00 CUYD CLASS I EXCAVATION 114.00 CUYD CLASS II EXCAVATION 250.30 CUYD CONCRETE (GRADE 4.0) (AE) (SW) 73.60 CUYD CONCRETE (GRADE 4.0) (AE) 73400.00 LBS. REINFORCING STEEL (GRADE 60) 1440.00 LNFT PILES (STEEL) (HP10X42) 4.00 EACH CONTRACTOR FURNISHED PDA 492.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 168.00 LBS. FERTILIZER (16-20- 0) 4.40 LBS. SEED (BIG BLUESTEM GRASS) (KAW) 2.30 LBS. SEED (CANADA WILD-RYE) 3.20 LBS. SEED (INDIANGRASS) (OSAGE) 2.10 LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS) 2.90 LBS. SEED (SIDE OATS GRAMA) (EL RENO) 1.10 LBS. SEED (SWITCHGRASS) (BLACKWELL) 0.20 LBS. SEED (TALL DROP) 10.00 LBS. SEED (STERILE WHEATGRASS) 3.40 LBS. SEED (WESTERN WHEATGRASS) (BARTON) 16.10 LBS. SEED (NATIVE WILDFLOWER MIX 2)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 18 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 ACRE MULCHING (PERMANENT) (SET PRICE) PROPOSAL NO: 513054555 STATE PROJECT NO: 087 C 0293-01 WORKING DAYS: 60 COMPLETION DATE: DBE GOAL: $7,000 COUNTY: SEDGWICK GRADE, BRIDGE & SURFACING 3.3 MI E & 1 MI S OF CLEARWATER OVER TRIB TO NINNESCAH RIVER 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE C) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 1056.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 450.00 CUYD COMMON EXCAVATION (RURAL SMALL) 979.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 184.00 TON SURFACING MATERIAL (AB-3) 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) 1.00 LSUM TEMPORARY SEEDING 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 56.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 99.00 SQYD EROSION CONTROL (CLASS 1) (TYPE B) 121.70 CUYD CONCRETE (GRADE 4.0) (AE) (RCB BR) 23920.00 LBS. REINFORCING STEEL (GRADE 60) 138.00 CUYD CLASS III EXCAVATION (RCB) 36.00 CUYD FOUNDATION STABILIZATION 44.00 CUYD GRANULAR BACKFILL (WINGWALLS) 1.00 LSUM SEEDING PROPOSAL NO: 513054575 STATE PROJECT NO: 087 C 0409-01 WORKING DAYS: 90 COMPLETION DATE: DBE GOAL: $20,000 COUNTY: SEDGWICK GRADE, BRIDGE & SURFACING BR AT 9800 S 239TH ST W 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 19 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 3908.00 CUYD COMMON EXCAVATION (RURAL SMALL) 1720.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) 1.00 MGAL WATER (GRADING) (SET PRICE) 36.00 LNFT ENTRANCE PIPE ( 18") 2.00 EACH END SECTION ( 18") 100.00 LNFT GUARDRAIL, STEEL PLATE 4.00 EACH SIGNING OBJECT MARKER (TYPE 3) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 715.00 TON SURFACING MATERIAL (AB-3) 2.00 EACH TWORKS SIGN ASSEMBLY (BLP) 4.00 EACH GUARDRAIL END TERMINAL (SRT) 4.00 EACH GUARDRAIL END TERMINAL (FLEAT) 1.00 LSUM TEMPORARY SEEDING 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 63.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 114.00 CUYD CLASS I EXCAVATION 103.00 CUYD CLASS II EXCAVATION 35.60 CUYD CONCRETE (GRADE 4.0) (AE) 211.70 CUYD CONCRETE (GRADE 4.0) (AE) (SA) 1490.00 LBS. REINFORCING STEEL (GRADE 60) 55670.00 LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) 649.00 LNFT PILES (STEEL) (HP12X53) 555.00 CUYD SLOPE PROTECTION (RIPRAP STONE) 1.00 LSUM SEEDING PROPOSAL NO: 513056131 STATE PROJECT NO: I435-105 KA 3260-01 WORKING DAYS: 30 COMPLETION DATE: DBE GOAL: COUNTY: WYANDOTTE PIPE LINING & REPAIR I-435: NEAR DONAHOO RD BETWEEN RP 16.5 & RP 17.2 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 103.00 LNFT CROSS ROAD PIPE ( 18") (RCP) 312.00 LNFT LINER PIPE ( 18") 101.00 LNFT STORM SEWER (18") 3.00 EACH END SECTION ( 18") 3.00 EACH INLET (TYPE II DITCH)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 20 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 430.00 LNFT LINER PIPE ( 72") 1.00 EACH CONCRETE HEADWALL 39.00 SQYD RIPRAP (LIGHT STONE) 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 164.00 SQYD PCCP PATCHING (FULL DEPTH) ( 9") (SOUND) 91.00 SQYD PCCP PATCHING (FULL DEPTH) ( 9") (UNSOUND) 1.00 LNFT EXTRA WORK SAW CUTS (SET PRICE) 55.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 38.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 1.00 LSUM SEEDING 205.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 605.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 80.00 EADA WORK ZONE SIGNS (16.26 SQ.FT. & OVER) 80.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 2125.00 EADA CHANNELIZER (PORTABLE) 70.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 15.00 EADA PORTABLE CHANGEABLE MESSAGE SIGN 33.60 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 33.60 STAL PAVEMENT MARKING (TEMP) (BROKEN) (LINE MASKING TAPE) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) PROPOSAL NO: 513056151 STATE PROJECT NO: I070-105 KA 3282-01 WORKING DAYS: 60 COMPLETION DATE: DBE GOAL: COUNTY: WYANDOTTE HMA OVERLAY I-70: 78TH ST TO QUARRY RD BRIDGE & I-670 SPLIT TO 10TH ST B RIDGE 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM ASPHALT AIR VOID PAY ADJUSTMENT 1.00 LSUM ASPHALT DENSITY PAY ADJUSTMENT 1.00 EACH ASPHALT CORE (SET PRICE) 55560.00 TON QUALITY CONTROL TESTING (HMA) 615.00 LNFT EXPANSION JOINT (MEMBRANE SEALANT POLY-TITE) 55560.00 TON HMA OVERLAY (SR-12.5A) (PG 76-22) 11385.00 TON HMA SURFACE (ULTRATHIN BONDED) (TYPE B) (PG 70-28) 291.00 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) 74.00 TON EMULSIFIED ASPHALT (SS-1HP) 110.00 TON HMA-COMMERCIAL GRADE (CLASS A) (PATCHING) 14033.00 SQYD MILLING 3450.00 TON PAVEMENT EDGE WEDGE (ROCK) 1.00 MGAL WATER FOR EARTHWORK COMPACTION (SET PRICE) 23.00 EACH ADJUSTMENT OF MANHOLES
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 21 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 111182.00 LNFT SAW AND SEAL JOINT (HMA) 282.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE II TAPE OR PAINT 195.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 564.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE I TAPE OR PAINT) 390.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) 103151.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") 20611.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") 3391.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") 75058.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") 225.00 LNFT PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) (12") 68.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 3.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 3.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (RT ARROW) 2.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (ONLY) 1.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) THRU-LT ARROW PROPOSAL NO: 513056232 STATE PROJECT NO: U077-031 KA 2776-01 WORKING DAYS: 70 COMPLETION DATE: DBE GOAL: COUNTY: GEARY BRIDGE REPAIR & SILICA FUME OVERLAY US-77:BR.NO.(044) 3.77 MI N OF N K-57 JCT OVER FARNUM CREEK 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 44.00 LNFT EXPANSION JOINT (MEMBRANE SEALANT POLY-TITE) 400.00 SQYD AREA PREPARED FOR PATCHING 100.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 1.00 CUYD MATERIAL FOR SILICA FUME OVERLAY (SET PRICE) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (EPOXY) (SET PRICE) 2092.00 SQYD SILICA FUME OVERLAY (2.25") 2092.00 SQYD MACHINE PREPARATION (2.25") 1300.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 1300.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 540.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.) 11300.00 EADA CHANNELIZER (PORTABLE) 675.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 225.00 EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) 138.30 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 3479.00 LNFT PAVEMENT MARKING REMOVAL 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 22 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 513056252 STATE PROJECT NO: I070-085 KA 3201-01 WORKING DAYS: 35 COMPLETION DATE: DBE GOAL: COUNTY: SALINE MILL & HMA OVERLAY I-70:BROOKVILLE ROAD UNDER I-70 (EXIT 238) 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 277.00 CUYD ROCK EXCAVATION 207.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5) 80.00 LNFT 4" PIPE UNDERDRAINS (AEGK) 120.00 TON AGGREGATE DITCH LINING ( 4") 471.00 LNFT 4" PIPE UNDERDRAINS (BFHL) 265.00 SQYD GEOTEXTILE FABRIC 545.00 SQYD SEPARATION GEOTEXTILE 21.00 CUYD AGGREGATE FOR BLANKET UNDERDRAINS 4.00 EACH GUIDEPOSTS 675.00 LNFT GUARDRAIL, REMOVAL AND RECONSTRUCTION OF STEEL PLATE 30.00 CUYD SLOPE PROTECTION (AGGREGATE) 550.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 455.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 525.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 315.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 1750.00 EADA CHANNELIZER (PORTABLE) 338.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 338.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 2.00 EACH INERTIAL BARRIER SYSTEM 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 44.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 44.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II TAPE OR PAINT) 11.00 EACH REPLACEMENT MODULES 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) PROPOSAL NO: 513056272 STATE PROJECT NO: K009-101 KA 2808-01 WORKING DAYS: 70 COMPLETION DATE: DBE GOAL: COUNTY: WASHINGTON BRIDGE REPAIR & OVERLAY K-9:BR.NOS.(042)&(039) 0.55 & 2.87 MI E OF CD CO L OVER DRY CREEK & SCRIBNER CREEK 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 97.00 SQFT CONCRETE SURFACE REPAIR 74.00 SQYD AREA PREPARED FOR PATCHING
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 23 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 10.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 1.00 CUYD MATERIAL FOR SILICA FUME OVERLAY (SET PRICE) 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 632.00 SQYD SILICA FUME OVERLAY (1.50") 610.00 SQYD MACHINE PREPARATION (0.50") 66.00 TON HMA-COMMERCIAL GRADE (CLASS A) 10.00 SQYD AREA PREPARED FOR PATCHING 5.00 SQYD AREA PREPARED FOR PATCHING (FULL DEPTH) 549.00 SQYD MULTI-LAYER POLYMER CONCRETE OVERLAY 1.00 LBS. REINFORCING STEEL (REPAIR) (GRADE 60) (SET PRICE) 4950.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 5550.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 7200.00 EADA CHANNELIZER (FIXED) 2400.00 EADA CHANNELIZER (PORTABLE) 1050.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 180.00 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1006.00 LNFT PAVEMENT MARKING REMOVAL 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) PROPOSAL NO: 513056313 STATE PROJECT NO: K255-026 KA 3285-01 WORKING DAYS: 5 COMPLETION DATE: DBE GOAL: COUNTY: ELLIS CHIP SEAL K-255:VICTORIA NCL N TO K-255 END 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 139.00 CUYD COVER MATERIAL (CM-L-2) 63.10 STA. MANIPULATION (CHIP SEAL) 63.10 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 27.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 22.00 TON ASPHALT CEMENT (AC-20-5TR) --------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 24 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 513056333 STATE PROJECT NO: K025-055 KA 3289-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: LOGAN CHIP SEAL K-25:APPROX MM 145.88 N TO RUSSELL SPRINGS NCL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1319.00 CUYD COVER MATERIAL (CM-L-2) 603.40 STA. MANIPULATION (CHIP SEAL) 603.40 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 255.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 208.00 TON ASPHALT CEMENT (AC-20-5TR) -------------------------------------------------------------------------------- PROPOSAL NO: 513056353 STATE PROJECT NO: U036-074 KA 3287-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: PHILLIPS CHIP SEAL US-36:NT CO L E TO PHILLIPSBURG WCL 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 2876.00 CUYD COVER MATERIAL (CM-L-2) 903.60 STA. MANIPULATION (CHIP SEAL) 903.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 557.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 454.00 TON ASPHALT CEMENT (AC-20-5TR) --------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 25 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 513056373 STATE PROJECT NO: U183-082 KA 3286-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: ROOKS CHIP SEAL US-183: END OF PCCP N TO PL CO L 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) 1255.00 CUYD COVER MATERIAL (CM-L-2) 449.00 STA. MANIPULATION (CHIP SEAL) 449.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 243.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 198.00 TON ASPHALT CEMENT (AC-20-5TR) -------------------------------------------------------------------------------- PROPOSAL NO: 513056393 STATE PROJECT NO: U083-097 KA 3288-01 WORKING DAYS: 10 COMPLETION DATE: DBE GOAL: COUNTY: THOMAS CHIP SEAL US-83:US-24 JCT N TO SD CO L 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1670.00 CUYD COVER MATERIAL (CM-L-2) 607.60 STA. MANIPULATION (CHIP SEAL) 607.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 323.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 264.00 TON ASPHALT CEMENT (AC-20-5TR) --------------------------------------------------------------------------------
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 26 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- PROPOSAL NO: 513056434 STATE PROJECT NO: U059-050 KA 2811-01 WORKING DAYS: 25 COMPLETION DATE: DBE GOAL: COUNTY: LABETTE WINGWALL REPLACEMENT US-59:CULVERT (521) 4.35 MI E OF US-160 JCT 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 40.00 CUYD GRANULAR BACKFILL (WINGWALLS) 4.00 CUYD FOUNDATION STABILIZATION 21.00 EACH DRILLING AND GROUTING 13.00 CUYD CONCRETE (GRADE 4.0) 1300.00 LBS. REINFORCING STEEL (GRADE 60) 1.00 LSUM TEMPORARY SHORING 75.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 75.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 900.00 EADA CHANNELIZER (PORTABLE) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) PROPOSAL NO: 513056454 STATE PROJECT NO: U400-050 KA 3134-01 WORKING DAYS: 40 COMPLETION DATE: DBE GOAL: COUNTY: LABETTE BRIDGE APPROACH REPAIR US-400:BR.NO.(065)8.26 MI E OF US-59 JCT OVER THE NEOSHO RIV ER 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM MOBILIZATION 10.00 CUYD UNCLASSIFIED EXCAVATION 106.00 CUYD ROCK EXCAVATION 50.00 SQYD AGGREGATE BASE (AB-3) ( 4") 1.00 MGAL WATER (AGGREGATE BASE) (SET PRICE) 372.00 LNFT PILES (STEEL) (HP10X42) 323.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 58.70 CUYD BRIDGE APPROACH SLAB FOOTING 52.00 TON HMA-COMMERCIAL GRADE (CLASS A) 780.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 900.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 3300.00 EADA CHANNELIZER (PORTABLE) 420.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 143.90 STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I TAPE OR PAINT) 1135.00 LNFT PAVEMENT MARKING REMOVAL 1113.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) 1113.00 LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) 2.00 EACH INERTIAL BARRIER SYSTEM
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 27 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LSUM TRAFFIC SIGNAL INSTALLATION (TEMPORARY) 15.00 EACH REPLACEMENT MODULES 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 2.00 EACH TWORKS SIGN ASSEMBLY (INSTALL ONLY) PROPOSAL NO: 513056555 STATE PROJECT NO: I135-087 KA 2804-01 WORKING DAYS: 15 COMPLETION DATE: DBE GOAL: COUNTY: SEDGWICK BRIDGE REPAIR BR.NOS.(339),(341)&(349) 0.58,0.89 & 1.99 MI N OF US-54 JCT, 1ST TO SB I-135, SB I-135 TO 2ND & 13TH TO SB I-135 RAMPS 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 1.00 LSUM REMOVAL OF EXISTING STRUCTURES 22.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY) 22.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY) 25.00 LNFT EXPANSION JOINT (STRIP SEAL ASSEMBLY) PROPOSAL NO: 513056636 STATE PROJECT NO: U050-035 KA 0423-03 WORKING DAYS: 30 COMPLETION DATE: DBE GOAL: COUNTY: GRAY GRADE & SURFACING US-50: INT OF US-50/RS-286/RS-1452 AT INGALLS 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD GRANULAR BACKFILL (WINGWALLS) (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 CUYD CONCRETE FOR SEAL COURSE (SET PRICE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 5.00 CUYD FOUNDATION STABILIZATION 1.00 LSUM CLEARING AND GRUBBING 594.00 CUYD COMMON EXCAVATION (RURAL SMALL) 2495.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 151.00 CUYD ROCK EXCAVATION 1809.00 CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) 545.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) 1.00 MGAL WATER (GRADING) (SET PRICE) 10.20 CUYD CONCRETE (GRADE 4.0) (RCB) 880.00 LBS. REINFORCING STEEL (GRADE 60) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 2.00 EACH TWORKS SIGN ASSEMBLY (SMALL) 1.00 LSUM TEMPORARY SEEDING 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 70.00 LNFT TEMPORARY DITCH CHECK
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 28 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 1240.00 TON HMA-COMMERCIAL GRADE (CLASS A) 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 LSUM SEEDING PROPOSAL NO: 513056656 STATE PROJECT NO: K156-042 KA 3291-01 WORKING DAYS: 20 COMPLETION DATE: DBE GOAL: COUNTY: HODGEMAN CHIP SEAL K-156:FI CO L E TO 0.6 MI E OF US-283 JCT 1.00 LSUM MOBILIZATION 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM TRAFFIC CONTROL 2676.00 CUYD COVER MATERIAL (CM-L-2) 1030.00 STA. MANIPULATION (CHIP SEAL) 1030.00 STAL PAVEMENT MARKING (TEMP) 4" BROKEN(3')(FLEX RAISED) 1.00 MGAL WATER (FLEXIBLE PAVEMENT) (SET PRICE) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA1 518.00 TON EMULSIFIED ASPHALT (CRS-1HP) (SEAL) -------------------------------------------------------------------------------- ALTERNATE SECTION: AA2 420.00 TON ASPHALT CEMENT (AC-20-5TR) -------------------------------------------------------------------------------- PROPOSAL NO: 513056676 STATE PROJECT NO: U054-088 K 9809-01 WORKING DAYS: 90 COMPLETION DATE: DBE GOAL: COUNTY: SEWARD GRADE & SURFACING LIBERAL: N & NE LEGS OF US-54/US-83/2ND ST/BLUEBELL JCT AND US-83 & 5TH ST. 1.00 LSUM CONTRACTOR CONSTRUCTION STAKING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 1.00 CUYD FOUNDATION STABILIZATION (SET PRICE) 1.00 LSUM MOBILIZATION 1.00 LSUM MOBILIZATION (DBE) 1.00 HOUR FLAGGER (SET PRICE) 1.00 LSUM CLEARING AND GRUBBING 4393.00 CUYD COMMON EXCAVATION (URB) 1718.00 CUYD ROCK EXCAVATION 1100.00 CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-0-5)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 29 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 263.00 CUYD COMPACTION OF EARTHWORK (TYPE B) (MR-90) 1.00 MGAL WATER (GRADING) (SET PRICE) 58.00 LNFT CROSS ROAD PIPE ( 24") 2.00 EACH END SECTION ( 24") 8.00 EACH BARRICADE (TYPE III) (FIXED) 1.00 EACH ADJUSTMENT OF MANHOLES 2.00 EACH FLUME INLET (CONCRETE) 31.00 LNFT SLOPE DRAIN (CONCRETE) 29.00 CUYD FLOWABLE FILL (HIGH STRENGTH) 1.00 EACH ADJUSTMENT OF VALVE BOX (WATER) 1.00 CUYD TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) 166.00 LNFT STORM SEWER ( 1.5 SQ.FT.) 172.00 LNFT STORM SEWER (18") 2.00 EACH END SECTION ( 18") 2.00 EACH INLET (TYPE 22 CURB) 1.00 EACH MANHOLE (REINFORCED CONCRETE) 209.00 CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) 1.00 LSUM TEMPORARY SEEDING 1.00 CUYD TEMPORARY DITCH CHECK (ROCK) (SET PRICE) 100.00 LNFT TEMPORARY DITCH CHECK 1.00 LNFT TEMPORARY SLOPE BARRIER (SET PRICE) 1.00 CUYD SEDIMENT REMOVAL (SET PRICE) 1.00 EACH MOBILIZATION (EMERGENCY EROSION CONTROL) (SET PRICE) 15027.00 SQYD MANIPULATION FOR TREATED SUBGRADE (FLY ASH) 1.00 MGAL WATER (TREATED SUBGRADE) (SET PRICE) 443.00 TON FLY ASH 3760.00 LNFT CURB AND GUTTER, COMBINED (AE) 3178.00 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) (NRDJ) 707.00 SQYD CONCRETE PAVEMENT (12" UNIFORM) (AE) 1646.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) (NRDJ) 794.00 SQYD CONCRETE PAVEMENT (10" UNIFORM) (AE) 1062.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (AE) (NRDJ) 248.00 SQYD CONCRETE PAVEMENT ( 8" UNIFORM) (AE) (PLAIN) 387.00 SQYD CONCRETE PAVEMENT ( 6" UNIFORM) (PLAIN) 3200.00 TON HMA-COMMERCIAL GRADE (CLASS A) 17.00 TON MILLING 1.00 EACH FIELD OFFICE AND LABORATORY (TYPE A) 2824.00 LNFT PAVEMENT MARKING (EPOXY) (WHITE) ( 6") 3678.00 LNFT PAVEMENT MARKING (EPOXY) (YELLOW) ( 4") 106.00 LNFT PAVEMENT MARKING (EPOXY) (YELLOW) ( 6") 47.00 LNFT PAVEMENT MARKING (EPOXY) (YELLOW) (12") 48.00 LNFT PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") 10.00 EACH PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (LEFT ARROW) 1.00 LSUM TRAFFIC SIGNAL 1.00 LSUM SEEDING 14670.00 EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) 2070.00 EADA WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) 3060.00 EADA WORK ZONE BARRICADES (TYPE III - 4 TO 12 LIN. FT.)
KANSAS DEPARTMENT OF TRANSPORTATION PAGE: 30 SUMMARY OF QUANTITIES DATE: 05/15/13 TIME: 11:46 AM LETTING DATE: May 22, 2013 QUANTITY UNIT ITEM DESCRIPTION ---------------------------------------------------------------------------------------- 4050.00 EADA CHANNELIZER (FIXED) 2700.00 EADA CHANNELIZER (PORTABLE) 1170.00 EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) 47.60 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (8')(FLEX RAISED) 0.40 STAL PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE I TAPE OR 1970.00 LNFT PAVEMENT MARKING REMOVAL 2.00 EACH WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER) 1.00 LSUM TRAFFIC CONTROL (INITIAL SETUP) 6.00 EACH TWORKS SIGN ASSEMBLY (BLP)

Last updated : December 23, 2009